|
| 1 | Part - A ( Material)Following Material Supplied by the Contractor:- |
| 2 | Eye Bolts for Guard wire |
| 3 | Aluminium Jointing Sleever for ACSR Dog Conductor |
| 4 | Cross Arm Holding Clamps with Nut & Bolts for Guarding |
| 5 | 11 KV X- Arm Holding Clamp WITH Nut and Bolt |
| 6 | Holding Clamp for different size |
| 7 | F- Bracket for fitting top insulator with nut and bolt |
| 8 | Nut & Bolt |
| 9 | Supply of GI Pipe 6'' dia |
| 10 | Clamp with Nut & Bolt |
| 11 | Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 50 Kms. (distance approx) |
| 12 | ST Pole 11 Mtr. Long |
| 13 | 11 KV XLPE Cable 3x185 sqmm |
| 14 | 11 KV Out door Cable Jointing kit 3x185 |
| 15 | 11 KV Staight Through Cable Jointing kit 3x185 |
| 16 | Single coe XLPE Insulated Al. Cable 185 sqmm for Jumparing |
| 17 | ACSR Dog Conductor |
| 18 | Other matching Materials |
| 19 | Dragging of PCC/ST Pole from dump site to pit site |
| 20 | Fabrication and Errection of Double Pole Support on PCC/ST Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor) |
| 21 | Fabrication and Errection of Single Pole Support on PCC/ST Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor) |
| 22 | Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms |
| 23 | Earthing of Poles as per RESPO Norms |
| 24 | Stringing, Sagging, Binding and jumpering of ACSR Dog Conductor as per RESSPO Norms |
| 25 | Laying of Cable 11 KV 3x185 sq mm D/C XLPE in Duct (All the material will be supplied by the contractor except 11 KV XLPE cable) |
| 26 | Laying of 11 KV XLPE Cable 3x185 sqmm underground by HDD (HORIZONTAL DRILL DIRECTION) Method with HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor . |
| 27 | Laying of underground Single Circuit 11 KV 3x185/120 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 500 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable) |
| 28 | Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x185 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contracotr) |
| 29 | Road Restroration charge Kaccha/Pakka as per PESSPO Norms |
| 30 | Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x185/3x120 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 31 | Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x185mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 32 | Dismantling of old line and Cartage to Site from Store Center |
| 33 | Concreting of pole with Muffing |
| 34 | Rect. Old and Used Conductor |
| 35 | Iron Material (STP pole 20 NO. as per 99 Kg./Pole) |
| 36 | Rect Back old and used Materials etc. Including Cable Iron Drum to store. Please Enable Macros to View BoQ information |