Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Tender Inviting Authority: Name of Work: Renovation of houses Internal finishes at Nilgiri building and other location at Eastern Zone of Anushaktinagar, Mumbai. NIT No: DCSEM/CQD/QSB/RENOV-NILGIRI/26-27/NIT/18 dt. 22.05.2026 |
| 2 | The site is situated at Anushaktinagar, Mumbai |
| 3 | The tenderers are advised to visit the site of work & its surroundings, with prior permission of Engineer-in-charge/authorised representative, to acquaint themselves about the location of work, accessibility to the site, level of sub-soil water, drainage facility for dewatering and any other matter relating to availability and carriage of construction materials, nature of work etc., and satisfy themself and then quote the rates accordingly. A Tenderer shall be deemed to have full knowledge of the site whether he inspects it or not and NO extra charges consequent on any misunderstanding or otherwise shall be allowed. |
| 4 | Tenderers shall visit the site of work, at their own cost. The request email for site visit shall be sent well in advance (preferably three working days before) for preparation of visitor pass, fixing suitable & mutually agreed date & time for site visit. The email ID for site visit is mentioned in tender documents. |
| 5 | Contractor is fully responsible for making payment of Minimum wages & Bonus to labourers, EPF & ESI to statutory Authorities timely and submission of challans and documentary proof to EIC for release of payment of Running Account / Final Bill. Otherwise, bill will not be forwarded by EIC to Accounts for payment. EIC should ensure that all necessary documents are submitted by Agency for release of payment. No Running Account / Final Bill shall be paid for the work till the applicable labour license, registration and challans with EPFO, ESIC and BOCW (Building and Other Construction Workers) Welfare Board, whatever applicable, are submitted by the Contractor to the Engineer-in-Charge.) |
| 6 | Contractor shall take a Contractor’s All Risk (CAR) Insurance Policy in respect of entire scope of work and a Janata insurance policy to cover the compensation claims arising out of Workmen's Compensation Act-1923. The Insurance policy shall be taken for entire period of contract and copy of the same shall be submitted to the Engineer-in-Charge before commencement of the work. The insurance policy shall be taken before commencement of the work and shall be renewed during the construction period till actual completion of work. The charges for issue & renewal of insurance policy shall be borne by Contractor. In event of failure of the Contractor to obtain Insurance Policy, Running Account Payments of the Contractor shall not be released till such time the same is obtained by the Contractor & submitted to the Engineer-in-Charge. In case, Insurance Policy has validity period not matching with contract period (either due to policy start date later than actual date of start of work or policy end date earlier than actual date of completion), then penalty for gap in period shall be levied at one and half times the rate of Insurance Policy premium including GST, to be computed on per day basis. All the workers engaged on the work shall required to be insured as per Government norms at the cost of contractor. |
| 7 | The Contractor shall submit with every Running Account / Final Bill, a certificate of employment/deployment of the Technical representative(s) as per Clause 36 (i) in Schedule 'F' of \\" Salient Governing Features of the Tender\\", after certifying by Engineer-in-Charge. In the event of not fulfilling the above provisions of Clause 36(i), recovery shall be made from the contractor as per Schedule 'F'. |
| 8 | Arrangement of Electricity : as per Schedule -BElectricity for construction work will be supplied by department @ free of cost. |
| 9 | Arrangement of Water : as per Schedule -BWater will be supplied by department and water charges will be recovered @1% of gross value of work done. |
| 10 | The drawings issued for Tender purpose are preliminary and indicative only. The Working drawings as applicable shall be issued in phased manner at the time of execution. Nothing extra shall be entertained towards revision in drawings. Drawing shall not be taken outside campus/site/premises without Gate Pass issued by EIC. |
| 11 | All the items of sub-structure include the cost of dewatering and shoring, wherever necessary, during the progress of work, till its completion without any extra cost to the Department. |
| 12 | The Schedule of Quantities include contingent works for other services (PHE, Electrical, Mechanical etc.) which shall be paid under relevant Civil items. Accordingly, the Contractor shall carry out all related works such as making cut outs, nitches, pipe sleeves, foundation pockets for embedded plate, bolts, parts etc. in concrete/ brick works as and when required by Engineer-in-charge without any extra cost to the Department. |
| 13 | PPC/ Blended cement of recommended brand shall only be used for all masonry and finishing works unless noted otherwise. Only Fully treated dry, well graded sand conforming to IS 383 shall be used. |
| 14 | Only Ready Mix Mortar of approved make shall be used. The ready mix mortar shall be manufactured by preferred manufacturers, using cement-sand in required proportion. |
| 15 | The size and thickness of natural stones/ tiles mentioned for flooring dado, skirting etc. are approximate and subject to the availability in market during execution. If the required size and thickness is not available, the next higher size and thickness of tiles/ stones shall be used without any extra cost to the Department. The contractor may quote the rates accordingly. |
| 16 | Quoted rate shall hold good for plain/ curved/ any other geometric shapes & sizes of all structural/ RCC members including formworks, masonry, flooring, doors & windows, plastering, painting etc. at all leads, levels, lifts and floors including scaffolding, bracing, multilevel staging etc., unless noted otherwise. Nothing extra shall be entertained towards wastages of materials, additional labours/ tools & plants etc. to achieve the required shapes & sizes etc. |
| 17 | The Contractor shall follow the DAE safety rules strictly. All safety & security regulations shall be followed strictly as per specifications & conditions of contract. |
| 18 | The following Security regulations shall be followed strictly while movement of labourers/ workers/ contractor's personnel including transportation of the materials etc. i) The Workers, Engineers and Supervisors will be provided vigil passes (for entry into Premises) on submission of application forms in prescribed formats supported by documentary proof like Aadhar card, Voter ID card and Ration Card / Driving Licence / PAN card etc. Police Verification Certificate (PVC) is mandatory for Engineers and Supervisors (wherever desired by department). You are requested to obtain immediately Police Verification Certificate (PVC) of your regular staff deployed at site(s) in respect of works and submit the same along with necessary application to allow them to enter in premises to carry out the assigned work. ii) The Contractor shall obtain special permission for working on extended hours of working days including Saturday, Sunday and holidays etc. iii) Workers shall be escorted from the main gate of campus/premises upto the site by designated supervisors of the contractor and they are not allowed to roam around inside the premises. iv) Transport vehicles of the contractor are allowed to enter the premises for transportation of construction materials. Drivers must have valid driving license of Heavy Vehicle. v) The following Security regulations shall also be followed strictly while movement of labourers/ workers/ contractor's personnel etc. (a) The Contractor shall issue I-Cards to his workers deployed on regular basis. (b) The Supervisor of the contractor having photo pass can bring daily wage workers/ casual workers inside campus for work. He should prepare list of such workers in duplicate. The original copy shall be handed over to the representative of the Engineer-In-Charge at the gate and endorsement obtained on duplicate copy on daily basis. (c) The Contractor's personnel including daily wage workers shall be in uniform with proper identification for ease in identification of such persons at unauthorised places. (d) The daily wage workers/ casual workers employed by the contractor must wear florescence vis-a-vis wear without fail during their presence inside Campus/premises. The contractor shall provide a sleeveless Jacket to the workers in pattern, colour showing name of contractor with address and telephone number as approved by the Engineer-in-charge. All the workers must wear the same while on duty. (e) The Contractor's personnel shall follow all safety rules & security procedure that are in vogue and applicable during execution of work. Contractor shall verify the character and antecedents of the labourers employed, through local address proof issued by competent authorities such as Aadhar card, Voter ID card and ration card / driving license /electricity bills /telephone bill /gas connection document etc. The nationality of contract labourers also needs due verification. |
| 19 | Vehicular movement shall abide by the regulations imposed by the concerned authorities. The contractor shall abide by the security rules & regulations of the Department. The approach roads should be kept clean & free from obstruction for smooth functioning of existing traffic and damages caused, if any, to be made good without any extra cost to the department. Contractor may make provision for entry of vehicles by providing alternate road/ route for entry & exit during the construction work, if required, at his own cost without extra cost to the department. |
| 20 | While transporting materials from site and disposal of surplus materials, the spilled over materials/ earth/ debris etc. on the road should be got cleaned by the contractor after the day's work is over. |
| 21 | Royalty for excavation, transportation, filling of earthwork etc. including obtaining permission from Statutory authority, if any, shall be borne by the contractor. |
| 22 | Regarding disposal of Construction waste from site of work, the agency has to abide by the guidelines of Construction and Demolition (C&D) waste management plan as approved by BMC/Local Municipal Authority and any other regulations issued by Statutory authorities in the matter from time to time and Department is not responsible in any way in this regard. i) Contractor shall strictly follow the Statutory rules and regulations of the Construction and Demolition Debris Management Plan for project site. ii) Surplus Excavated materials and construction debris shall be disposed from construction site at approved disposal ground of BMC/Local Municipal Authority including cost of necessary Statutory charges, as applicable. iii) Contractor shall submit acknowledgement of challan for each trip for unloading of Construction and Demolition waste material as per the standard format. iv) Contractor shall be responsible and liable for penalty, if any, as prescribed by the Local Authority in case of non-fulfilment of the procedure laid down in the Construction and Demolition Debris Management Plan. v) Contractor shall submit irrevocable Bank Guarantee for the amount as insisted by BMC/Local Municipal Authority for the purpose of ensuing compliance of the Waste Management Plan/Debris Management Plan approved by the Local Municipal Corporation from time to time, till the grant /issuance of the Occupation Certificate and charges for same will be borne by Contractor. NOC from C&D Waste Management Department of BMC/Local Municipal Authority shall be submitted by the agency. |
| 23 | Agency should pay necessary charges to BMC/Local Municipal Authority to get done periodical pest control / anti-larva treatment / Insecticide treatment at Construction site. After the completion of work, necessary NOC shall be obtained from BMC /Local Municipal Authority and shall be submitted to Department. The charges for same will be borne by Contractor. |
| 24 | The Agency shall take care of existing services and other department properties while carrying out job. All dismantling, demolishing and excavation work shall be done with most careful manner and with prior written approval of the Engineer-in-charge, without damaging the existing structures, services, finishes, etc. Agency shall take all precautions to cover all furniture, fixtures, glass and window panes to prevent damage. Damage, if any shall be repaired/replaced by agency at his own cost. |
| 25 | Protection of work: The Contractor shall be responsible for the protection of the work during progress. He shall also provide and maintain any other temporary substitute and material for this purpose. He shall take all the necessary precautions to prevent damage to all the works till its handing over. |
| 26 | Wherever old material/works are replaced with new one, quoted rate includes removing/dismantling the existing one and depositing the serviceable material at departmental store and disposing off debris outside the campus/ premises/ colony. |
| 27 | Since the work has to be carried out inside/ near occupied residential/office building, the work shall be executed with least disturbance to occupants of buildings. |
| 28 | Approved Samples of Materials: The Contractor shall submit samples of all materials to be incorporated in the work, without any extra cost to Department, at least 30 days before he places bulk order for the materials and shall obtain approval of samples in writing from the Engineer-In-charge. |
| 29 | Shop drawings for Aluminium work, Structural steel, Stainless steel, Structural glazing, ACP cladding, etc. shall be submitted by Contractor for the approval of Engineer-in-Charge, at least 30 days in advance prior to taking of work. |
| 30 | No labour shall be permitted to stay inside campus/premises/site. |
| 31 | Suitable area near site of work shall be allocated to the contractor for storing construction materials, for site office etc. Optimum care shall be taken by the contractor to avoid disturbing the traffic and road around the building etc. The contractor shall have to maintain proper co-ordination with the fellow agencies working simultaneously in the vicinity of subject work in order to avoid delays in any of the works going on in and around the premises. |
| 32 | Guidelines for Air Pollution mitigation(i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department.(ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority.(iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal.(v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory. (vi) Construction projects shall mandatorily install sensor-based air quality monitor for measuring PM concentration (PM2.5 and PM10), relative humidity, temperature and display real time AQI data through LED display board (width 1220mm x height 915mm, screen resolution 320 x 192 pixel) at the construction site. Further, installation must be completed within 15 days of issue of Work order or commencement of work. The Contractor shall submit a certificate for completion of installation of air quality monitor and LED display board, after certifying by Engineer-In-charge, along with 1st RA bill for releasing the payment.(vii) The air quality data must be accessible at the site and made available for inspection by Local Municipal Authority/ Competent Authority.(viii) Construction layouts having area more than 01 (one) acre or Height more than 70m, shall have continuous dust or wind breaking tin / metal sheet erected of minimum height 35 feet around periphery of the construction project site and for construction site, less than 01 (one) acre, the tin / metal sheet height shall be 25 feet minimum.(ix) Tarpaulin / Green cloth / Jute sheet to be mandatorily used to cover the floor where any construction activity is in progress and two floors below it and also on scaffolding covering an entire area under demolition structure. Further, regular cleaning of Tarpaulin / Jute sheet to be undertaken. (x) Water sprinkling shall be continuously carried out so that the debris shall remain in wet condition.(xii) All vehicles carrying construction materials/waste/debris shall have valid PUC certificates and the same shall be produced as when asked for by competent authorities.(xiii) Construction workers should mandatorily use PPE (Personal Protective Equipment) i.e. Mask, Goggles etc. |
| 33 | The quoted rate shall be inclusive of providing and erecting temporary barricading of height as per above 'Guidelines for Air Pollution mitigation' (but minimum 10 feet height) using structural steel (MS Pipes or angle iron frame work etc.), covered with tin / GI sheets of approved colour & shade, Struts, MS Clamps, Bracing etc. and shall have wicket gate & material gate and including writing and painting of direction & instructions, providing glow lamps, reflective signs, marking, flags, caution tape etc. Prior written approval of Engineer-in-Charge of the sketch/ drawing showing details of barricading shall be obtained by the contractor. The barricading shall be provided and retained in position at site continuously during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour, materials, equipments and works required to execute the job such as earth work, concrete, welding etc. After completion of work, Contractor shall remove and take away the barricading at his own cost with the prior approval of Engineer-In-Charge. The entire work shall be executed as per direction of Engineer-In-Charge. No work shall be allowed unless the barricading is completed to the satisfaction of the Engineer-in-Charge. The Contractor shall submit a certificate for completion of barricading along with 1st RA bill after certifying by Engineer-in-Charge for releasing the payment. |
| 34 | The contractor shall display proper information/cautionary signage boards at site for the safety of the workers and public in general in the surrounding areas. |
| 35 | Contractor has to provide sign board at site with detailed name of project, name of client, name with contact number of contractor and minimum wages category wise at entrance of project/site without any extra cost to the department. |
| 36 | Guidelines for Scaffolding works - Quoted rates shall include all scaffolding works without any extra cost to the department.(i) Design of scaffolding for carrying out work shall be as per relevant IS Codes & specification. The contractor has to observe all safety procedure while working on heights as per IS: 3696 (Part-I) (Safety Code for Scaffolds). (ii) All working platform must be of minimum 600 mm wide, made of M.S pipe and must have guard rails as per specification. Further, Overhead protection should be provided on the scaffolds to protect workers on lower platform against falling objects from higher level.(iii) Necessary ladder shall be provided at required locations to enable Departmental Staff for supervision of works.(iv) Labours working on the scaffolding should be with safety belts, helmets, goggles and other safety gears.(v) Horizontal Safety Net : Nylon net with a mesh size of 25mm shall be provided at 4.0 meter height from the ground level around the buildings upto a distance of minimum 3.0 meter from the edge of the building on all sides to catch any falling objects.(vi) Vertical Safety Net: Green cloth net shall be provided to the full height of scaffolding / building and securely tied to protect falling material coming out during the progress of work. |
| 37 | Maintaining L1 position During execution of the contract, if tender structure changes due to variation in quantities (i.e Work order quantities, Substituted items quantities including quantities within deviation limit specified in Clause 12 of Schedule ‘F’ in “Salient Governing Features of the Tender”), Contractor has to give suitable discount to remain in L1 position. |
| 38 | The quoted rates shall be inclusive of wastage of labour & material, installation, testing, commissioning, transportation, loading, unloading, lifting etc. and also includes provision of all necessary manpower, tools, machinery, equipment, hoists etc. for carrying out the work in effective manner as per specifications and as directed by Engineer-In-Charge. |
| 39 | The quoted rates shall be inclusive of all Taxes, GST, Cess, Levy, duty etc. |
| 40 | Refer Prebid clarifications, minutes of meeting & corrigendum for revisions, if any, for updates. 3) The work shall be completed in maximum of 30 Days in each flat in all respect. 4) i) The work progress of the agency shall be monitored on quartely basis. ii) First quarter shall commence after the first one month of stipulated date of commencement of work. iii) The agency shall have to complete on an average 13 flats per month in a quarter under consideration subject to availability of flats for renovation.In last month 12 flats to be completed. iv) If the agency fails to meet the stated target progress assessed quarterly, a penal recovery of Rs. 1500 per No of flats in a quarter under consideration shall be levied for weighted average delay in renovation of flat(s). Decision of Engineer-In-Charge shall be final and binding on agency. |
| 41 | The work shall be completed in maximum of 30 Days in each flat in all respect. i) The work progress of the agency shall be monitored on quartely basis. ii) First quarter shall commence after the first one month of stipulated date of commencement of work. iii) The agency shall have to complete on an average seven flats per month in a quarter under consideration subject to availability of flats for renovation. iv) If the agency fails to meet the stated target progress assessed quarterly, a penal recovery of Rs. 1500 per No of flats in a quarter under consideration shall be levied for weighted average delay in renovation of flat(s). |
| 42 | The agency shall visit the sample flat at Anushakti nagar site of work before quoting the rate. |
| 43 | i) No debris shall be left over around the building during the renovation works. An area for 'Debris bins' will be identified close to his site office or inside Anushaktinagar colony at the location identified by EIC on the request of contractor for collection of debris generated on day to day basis. The Debris from debris bin shall be cleared every month. The contractor must maintain adequate number of wheel borrows all the time for shifting the debris to Debris bin. If the debris lies around the building for more than 2 days, penalty @ Rs. 500/- per day per flat shall be levied w.e.f. 3rd day onwards. ii) The debris generated shall be disposed by mechanical transport to the nearest dumping pit inside Anushaktinagar colony as directed by EIC with all leads, loading, unloading etc. complete. |
| 44 | Penal recovery shall be made at the rate of Rs.1500/- per flat per day, if water taps/ bib cocks, flushes etc. are left open. In case of any further material loss due to this negligence in other flats, same will have to be borne by contractor. |
| 45 | The cement sand mortar use shall be using factory manufactured pre mix/ready mix of 'Roofit Mix'of M/ s Premier Floor to Roof Materials pvt.ltd/ 'Easy plast' of M/sWalplast Products pvt.ltd/ 'Readiplast' of M/s UltratechCement Ltd or other approved equivalent make, having minimum composition of C:S :: 1:4 using fully treated dry, well graded natural sand conforming to IS 383 suitable for external plastering, having low rebound properties, low water demand for curing properties,mechnical mixing with water in a metalic tray only to make good consistency as per the specification of the Manufacturer. |
| 46 | PART I : CIVIL WORKS |
| 47 | PART II : PH WORKS |
| 48 | PART III : REBATE ITEMS |
| 49 | PART I : CIVIL WORKS |
| 50 | Providing and laying at all floors and levels Vitrified tiles of first quality Marbonite of M/S H&R JOHNSON (INDIA) Ltd or other equivalent approved make of approved colour, shade, pattern and minimum thickness of 8.5mm thickness or as per manufacture's specifications, laid directly over tile using polymer cum cement based adhesive manufactured by Roffe construction – NSA (non skid adhesive) or M/s Ardex Endura chemicals– Gold star or other approved equivalent in respect of flooring and fixed over 12 mm thick backing cement mortar 1:4 (Using factory made Ready Mix Mortar only) in respect of skirting , close jointed and grouted white /colour cement slurry with pigments to match the colour of the tiles, finished to level, line, slope and plumb including cutting of tiles, making openings / cut out where necessary including wastage for odd shape of room and final cleaning of surfaces as required, curing, etc. complete all as per specification, relevent IS code & as directed by the EIC. |
| 51 | a) In flooring with tiles of approx. size 600 mm x 600 mm similar to Salt & Pepper (White)/ Perlato/Athelon of M/s H& R Johnson (I) ltd. laid directly over existing tile using tile on tile polymer cum cement based adhesive and/or using 20 mm thick cement mortar 1:4 (Using factory made Ready Mix Mortar only) laid after removal of existing flooring with backing mortar. |
| 52 | b) In Dado / skirting with tiles of size 600 x 100 mm similar to Salt & Pepper (White) of M/s H& R Johnson (I) ltd laid over 12 mm thick CM 1:4 backing (Using factory made Ready Mix Mortar only), jointed with cement slurry & grouted with pigment of matching shade & finishing the top of skirting etc. complete, including dismantling the existing dado/skirting tile and backing cement mortar, disposal of debris inside Anushaktinagar colony at the location identified by EIC etc. complete. |
| 53 | Providing & laying at all floors & levels first quality ceramic tiles of minimum thickness as specified by the manufacturer of M/S. H&R JOHNSON (INDIA) Ltd. or equivalent approved make of approved colors, shade and texture in flooring / dado / skirting as per approved pattern. incluidng cost of all materials, including cutting the tiles to required shape, wastage, pointing the joints with white cement mixed with matching pigments to match the colour of the tiles, finished to line, level, slope & plumb, final cleaning of surface as required, curing , making necessary opening cutouts etc.and including removing existing flooring / dado and disposing of debris inside Anushaktinagar colony at the location identified by EIC complete all as per specifications, relevant IS code & as directed by the EIC. |
| 54 | a) In flooring with tiles of size 300 x 300 ( approx size ) Digital HD series of M/s H& R Johnson or equivalent approved make with 20 mm thick 1:4 Cement mortar bedding (Using factory made Ready Mix Mortar only) |
| 55 | b) In flooring with anti skid tiles of size 300 x 300 mm x 12 mm th ( approx size) Checkered Ivory of Endura tiles of M/s H& R Johnson or approved equivalent with 20 mm thick 1:4 Cement mortar bedding (Using factory made Ready Mix Mortar only) |
| 56 | c) In dado / Skirting with tiles of 300X450mm (Approx size) of Digital HD Series of M/s H&R johnson (India) Limited or approved equivalent fixed over 12 mm thick 1:4 cement mortar (Using factory made Ready Mix Mortar only) backing / fixed directly over existing tile with polymer cum cement based tile adhesive manufactured by M/s. Roffe construction (Non-Skid Ahhesive, NSA) or M/s Ardex Endura (Gold Star) or other approved equivalent, jointed with cement slurry & grouted with pigment of matching shade & finishing the top of skirting/dado etc. complete. |
| 57 | Providing and laying at all floors and levels Vitrified tiles of size 600mmx600mm (approx) similar to salt & pepper satin finish (grey) of M/S H&R JOHNSON(INDIA)Ltd or equivalent approved make of approved pattern,colour & make & min thickness of 8.5 mm or as per manufacturer's specifications, laid directly over existing tile with polymer cum cement based adhesive(water proof quality) manufactured by roffe construction– NSA (non skid adhesive) or M/S Ardex Endura chemicals– Gold star or other approved equivalent in respect of flooring and fixed over 12 mm thick backing cement mortar 1:4 (Using factory made Ready Mix Mortar only) in respect of skirting , close jointed and grouted white /colour cement slurry with pigments to match the colour of the tiles, finished to level, line, slope and plumb including cutting of tiles, making openings / cut out wherever necessary, including wastage for odd shape of room and final cleaning of surfaces as required, curing, etc. complete all as per drawings and manufacture's specification, relevent IS code and directed by the EIC.Note: In case of non-availability as per item, other makes which can be considered are 'Asian', 'Oracle Granito Ltd.', 'Orient' Regency., Kajaria and Somany.No claim for payment of over thickness of adhesive for tile over tile work considered by the Department. |
| 58 | a) In flooring with tiles of approx. size 600 mm x 600 mm similar to Salt & Pepper (Grey)/ Perlato/Athelon of M/s H& R Johnson (I) ltd. laid directly over existing tile using tile on tile polymer cum cement based adhesive and/or using 20 mm thick cement mortar (1:4) (Using factory made Ready Mix Mortar only) laid after removal of existing flooring with backing mortar. |
| 59 | b) In Dado / skirting with tiles of size 600 x 100 mm similar to Salt & Pepper (Grey) of M/s H& R Johnson (I) ltd laid over 12 mm thick CM 1:4 (Using factory made Ready Mix Mortar only) backing, jointed with cement slurry & grouted with pigment of matching shade & finishing the top of skirting etc. complete, including dismantling the existing dado/skirting tile and backing cement mortar disposal of debris inside Anushaktinagar colony at the location identified by EIC etc. complete. |
| 60 | Supplying, fabricating and fixing in position at all floors factory made Aluminium sliding/top hung/fixed/ adjustable louvered windows & ventilators with rivit joint of specified size, made of integrated bronze anodised matt finished (15micron thick) aluminium section (extruded) of Deluxe domal series or equivalent or as directed by EIC , including for making exhaust fan frame work, handles of specified size etc, of approved manufacutres for following types with extruded sections of required series as per drawing of Jindal / Indal / Aluminax or other approved equivalent make of approved sections with size and weights as directed for frames and shutters(including wastages if any) confirming to relevant IS specifications with all approved Bronze anodised aluminium fittings and accessories, latching fixture, 2/3 rollers with ball bearing of superior quality all as shown in the drawing including providing and fixing aluminium channel beading/glazing clips fixed with necessary bronze anodised screws, grouting the gap with sealant and including dismantling of existing window frame and shutter, glass and depositing same to dept store etc all complete generally as per drawing, specifications etc, all as directed by EIC. |
| 61 | Providing and fixing following thickness of clear float/ frosted / Bajara sheet glass of M/S Triveni/ shree vallabh/ IAG/Modi guard/ Saint Gobin or other approved equivalent manufacture and fixing with Aluminium frame work (door/ window) including fixing aluminium channel beading and providing and fixing 2 way EDPM gasketing to ensure water and air tightness and neoprene cushions/ gasket accommadated in grooves, necessary bronze anodised screws etc, all complete generally as per drawings specifications and as directed by Engineer in Charge |
| 62 | a) 5 mm thick clear float glass |
| 63 | b) 5 mm thick Bajra sheet glas |
| 64 | c) 3 mm thick Bajra sheet glass for louvers |
| 65 | Providing and fabricating and fixing in position structural steel grills at all level, using M.S. angles, flats, bars etc. with anchor fasteners of suitable dia in the marble jambs & cills including painting by dipping with two coats of synthetic enamel paint of approved shade & make and one coat of approved steel primer, including cutting,fabrication, welding etc complete all as per specification and as directed by the Engineer in charge. |
| 66 | Dismantling carefully the existing RCC kitchen platform along with finishing by chiselling without damaging existing structure including cutting the reinforcement etc. depositing the serviceable material at departmental store and disposing off debris inside Anushaktinagar colony at the location identified by EIC etc complete all as directed by the EIC. |
| 67 | Providing & laying machine cut machine polished natural stones as mentioned for the followings for kitchen platform topping and facia over and including necessary cement mortar for backing/ bedding, close jointed and grouted with matching cement slurry and finished to line, slope, level, plumb, curing etc, as required including cutting of stone slabs, wastages, making cut outs wherever required etc all as per specifications and as directed by the Engineer in charge.Note : 1)Top exposed surface on plan & exposed vertical finished face shall be measured for payment in sqm. 2)Verticals,shelves,platform shall be embedded minimum 25 mm in wall/flooring. |
| 68 | a) For kitchen platform top, upto 750mm wide and upto 1800 mm length in single piece consisting machine cut machine polished on one side 30 mm thick cuddappa stone at bottom and mirror polished machine cut 18 mm thick Jet black Granite stone at top fixed with 52 mm thick 1:4 cement mortar (Using factory made Ready Mix Mortar only), between two stone slabs (Double stone slab sandwitch type) including providing cut out if any, moulding and polishing the edges etc complete . |
| 69 | b) For kitchen platform horizontal facia upto 100 mm wide machine cut machine polished on one side 18mm thick Jet black Granite stone fixed with epoxy resin base (Araldite adhesive or equivalent) including round moulding and polishing the edges etc complete. |
| 70 | c) For horizontal beading of size 30x16mm machine cut machine polished Jet black Granite stone fixed with epoxy resin base (Araldite adhesive or equivalent) including round moulding and polishing the edges etc complete . |
| 71 | Providing & laying machine cut machine polished Cuddapah stones/granite stone/marble stone as mentioned followings for kitchen platform vertical support /shelves /window cill etc and including necessary cement mortar for backing/ bedding, close jointed and grouted with matching cement slurry and finished to line, slope, level, plumb, curing etc, as required including cutting of stone slabs,wastage, making cut outs wherever required etc all as per drg, specifications and as directed by EIC.Note : 1)Verticals,shelves,platform shall be embedded minimum 25 mm in wall/flooring.2)Exposed inside vertical finished face of window below platform shall be measured for payment in sqm.3) All finished natural stone except for flooring & Platform shall be applied with aralide or equivalent stone adhesive on back surface,spreading/splashing of sand particles on adhesive applied surface before a day of fixing of stones. 4) Window jamb, cill & lintel bottom with granite / gren marble shal be mitred / partly mitred joint as directed by Eingineer-In-Charge.5)Exposed inside vertical finished face of window below platform shall be measured for payment in sqm.6)Agencies shall quote rate accordingly. |
| 72 | a) For vertical support of Counter/ platform, consisting of 2 nos 30 mm thick machine cut machine polished on one side cuddapah stone slabs sandwiched between the stones with 20 mm thick CM 1:4 (Using factory made Ready Mix Mortar only) including providing exposed front face upto 100 mm wide vertical facia of mirror polished 18mm thick jet black granite stone on exposed sides with epoxy resin base (Araldite or equivalent) including rubbing and polishing of cut edges etc complete all in line, level, plumb etc. |
| 73 | b) 30 mm thick machine cut and both side machine polished Cuddaph stone for shelves including rubbing and polishing the exposed edges. |
| 74 | c) 18 mm thick machine cut and single side machine polished Baroda green marble stone for window cill in stepped form laid over 20 mm thick 1:4 cement mortar (Using factory made Ready Mix Mortar only) & overlapping of 20 mm shall be fixed with Araldite adhesive with best workmanship, including half round moulding & polishing of exposed face etc complete. |
| 75 | d) 18 mm thick machine cut and single side machine polished Baroda green marble stone for window jamb & bottom of lintel in single piece laid over 20 mm thick 1:4 cement mortar (Using factory made Ready Mix Mortar only) including half round moulding & polishing of exposed face etc complete.Note:- 1) All finished natural stone except for flooring & Platform shall be applied with aralide or equivalent stone adhesive on back surface,spreading/splashing of sand particles on adhesive applied surface before a day of fixing of stones. 2) Window jamb, cill & lintel bottom with granite / gren marble shal be mitred / partly mitred joint as directed by Eingineer-In-Charge.3)Exposed inside vertical finished face of window below platform shall be measured for payment in sqm.4)Agencies shall quote rate accordingly. |
| 76 | Providing and fixing in position at all floors, levels / heights 18 mm thick mirror polished natural stones slab for door frame in two overlapping layers one piece full length / height of approved shade, finished sizes as directed including machine cut / hand cut, final cleaning, moulding and polishing of exposed edges, in line, level, plumb and fixing the stone with cm 1:4 (Using factory made Ready Mix Mortar only), 20mm backing & overlapping of 20mm shall be fixed with Araldite adhesive, with best workmanship, finishing, curing, including removing existing door frame, shutter & fittings etc.and depositing the same at dept store etc. complete all as per specifications, drawings & as directed by the EIC.Note:- 1) All finished natural stones except for floorings shall be applied with araldite or equivalent stone adhesive on back surface ,spreading/splashing of sand particles on adhesive applied surface before a day of fixing of stones.2) Window jamb, cill & lintel bottom with granite / gren marble shal be mitred / partly mitred joint as directed by Eingineer-In-Charge.3)Exposed surface on Elevation & exposed vertical finished face shall be measured for payment in sqm. Overlapping & edges etc shall not be measured. |
| 77 | a) Baroda Green marble Stone |
| 78 | Supplying & fixing 25 mm thick PVC integral free foam sheet in form of flush finish door shutter, manufactured by M/s. Jain Irrigation Systems Ltd. (Ex-cel sheet) / M/s. Rajashree plastiwood or other equivalent approved make of white colour, solid section, extruded rigid, light weight sheet with fine & homogeneous closed cell structure with smooth, glossy, hard surface finish on both sides including providing recessions for hinges and providing & fixing 3 nos 100 mm heavy duty S.S. hinges and 2 Nos. 100 mm heavy duty aluminium baby latches, 2 nos. of 100 mm Al. Bow handles with back plate of M/s Shalimar Hardware or equivalent and including providing a vision panel opening of size 300 mm X 200 mm including providing and fixing PVC moulded louvers on both faces in the opening of vision panel with ss screws, all edges to be smooth finish with mixture of PVC powder & solvent etc complete all as per specification and as directed by the EIC.Note:- 1) The entire door shall be jointless shutter. |
| 79 | 2) The sizes shall be approximately 650 mm x 2000mm, however exact dimensions shall be measured at site before manufacturing. |
| 80 | Providing marine ply of 19 mm thick conforming to latest IS -710, for making / repairing of wooden cupboards/cabinet etc at all floors and levels, including cutting to required sizes and jointing and fixing the same with necessary screws, adhesives, providing and fixing teak wood lipping to all exposed faces of ply wood and including wastsge, transportation and including removing old damaged cupboards/cabinet and refixing the same after repair, including removing & refixing all fittings & fixtures and depositing unserviceable cupboards to departmental store etc complete all as per specifications and as directed by the Engineer in charge. |
| 81 | Supplying and fixing following type of fittings, fixtures and fastenings of approved quality along with necessary CP brass screws, bolts, nuts, washers and other standard accessories etc. complete all as directed by the EIC. |
| 82 | a) SS Piano hinges overall width of 35mm |
| 83 | Supplying and fixing heavy duty superior quality fittings , fixtures and fasteners along with necessary CP screws, bolts, nuts, washers etc. as per approved samples. etc. complete all as directed by the E-I-C., |
| 84 | a) Aluminium Door stoppers with rubber bushing |
| 85 | Supplying& fixing night latches of Godrej make or other equivalent approved make with 7 lever and with triplicate keys to the existing main door at various flat/ locations including all charges, screws, removing and returning the old fittings to dept. stores, shifting the positioning of night latch sets, if required and plugging the unwanted holes/ cut outs in door frame/ shutter etc. complete all as directed by the E-I-C. |
| 86 | Supplying & fixing in position the following type solid core block board flush door shutters with commercial ply / teak veneer as specified below conforming to IS 2202-latest, with 20 mm thick teak wood lipping alround, fixing shutters in position to existing door frames at all floors by cutting/ planing if necessary including the labour for removing & refixing old fittings & fixtures and for fixing of the fittings & fixtures with wooden packing pieces if necessary with screws, including one coat of approved primer on commercial ply surface etc.including removing existing damaged shutter,fittings and depositing at dept. stores etc. complete all as per specification & as directed by EIC. |
| 87 | a) For Door 32 mm thick commercial ply on both sides |
| 88 | b) For Door 38 mm thick commercial ply on both sides |
| 89 | Removing carefully the existing flush door shutters and refixing the same to its position after laying new tiles on flooring including cutting the shutters at bottom portion as per site condition , lipping the cut exposed surface with teak wood lipping including nails, screws,adhesive etc complete all as dierected by the Engineer in charge. |
| 90 | Repairs to damaged RCC structural members at all locations/ floors using polymer modified cementatious mortar, for strengthening the existing RCC structural members using acrylic based polymer and comprising the following operations:1. Breaking cracked / spalled concrete members along the cracks with plaster, including removing and stacking of all unserviceable material at site,simultaneous transportation and disposed at a location in Anushaktinagar as identified by EIC. complete all as per specifications and as directed by the Engineer-in Charge.2. Exposing and cleaning the reinforcement thoroughly by light tapping / wire brushing of using strong emery paper and finally by acetone /rust remover of Dr. Fixit / Anuvi chemicals / Fosroc or other eqivalent.3. Applying a coat of polymer and cement slurry in the ratio 1:1 by volume to the reinforcement bars.4. Polymer required for the work shall be procured by the Agency from approved Manufacturers Like M/s Astra , M/s Anuvi, M/s Apcotex or other approved equivalent manufacturer confirming to technical requirements as below and the invoices/challans etc to be submitted to EIC for record. |
| 91 | a) Building up with polymer modified cementatious mortar for RCC structural members etc. in layers not exceeding 20 mm in a day (proportion – cement 50 Kg. : Silica sand 125 Kg. : polymer liquid 10 ltrs.) with necessary bond coat (polymer : Cement = 1:1 by volume) for tack coat and also for subsequent layers using polymer including curing, covering the flooring /window with tarpaulins or equivalent covering material to avoid deposition of polymer mortar and cleaning of floor / windows thoroughly on completion of repair work etc. complete all as per specifications and as directed by the Engineer-in-charge. Polymer used for this work in KG shall be measured for payment. |
| 92 | Cement plastering using factory manufactured pre mix/ready mix mortar in CM 1:4 of 'Roofit Mix'of M/s Premier Floor to Roof Materials pvt.ltd/ 'Easy plast' of M/s Walplast Products pvt.ltd/ 'Readiplast' of M/s Ultratech Cement Ltd or other approved equivalent make, having minimum composition of C:S :: 1:4 using fully treated dry, well graded natural sand conforming to IS 383 suitable for external plastering, having low rebound properties, low water demand for curing properties, mechnical mixing with water in a metalic tray only to make good consistency as per the specification of the Manufacturer and applied on internal wall and ceiling finished smooth with POP over brick walls or concrete surfaces at all floors and levels, including membrane curing by applying one coat of factory made curing compound Resikure of M/s Anuvi Chemicals, Concure of M/s fosroc, Dr. Fixit curing compound or other equivalent over repaired surfaces as per manufacturer's specification and removing existing damaged/ worn out plastering and disposing off debris inside Anushaktinagar colony at the location identified by EIC etc. complete all as per specifications and as directed by EIC. |
| 93 | a) 12 mm thick |
| 94 | b) 15 mm thick. |
| 95 | Repainting of old painted surfaces with two coats of acrylic emulsion paint of approved make & shade over two coats ofapproved primer (alkali resistant) consist of thoroughly scrapping oil bound distemper /acrylic emulsion / white wash surface, applying a coat of approved cement primer, filling up the cracks with approved crack filling compound , applying approved stucco putty to entire surface to fill up crevices, mild depression etc. thoroughly scrapping the surface, applying 2nd coat of approved cement primer carrying out full stucco puttywork , apply two coats of acrylic emulsion paint including necessary covering material and removal of splashing & droppings from floors, walls including scaffolding, ladder as required & disposing of debris inside Anushaktinagar colony at the location identified by EIC etc. complete all as directed by the Engineer-in-Charge. |
| 96 | Repainting of old painted surfaces with two coats synthetic oil bound distemper of approved shade and make over one coat of approved cement primer, including thoroughly scrapping, removal of old paint if any, sand papering & preparing the surfaces, applying approved stucco putty to entire surface to fill up crevices mild depression etc. scaffolding including cleaning of floors, doors & windows etc.& disposing of debris inside Anushaktinagar colony at the location identified by EIC etc. all as per specifications and as directed by the Engineer-in-Charge. |
| 97 | Repainting of old painted surfaces with two coats FLAT oil paint of approved shade and make over one coat of approved cement primer, including thoroughly scrapping, removal of old paint if any, sand papering & preparing the surfaces, applying approved stucco putty to entire surface to filling up crevices, mild depression etc. scaffolding including cleaning of floors, doors & windows etc.& disposing of debris inside Anushaktinagar colony at the location identified by EIC etc. all as per specifications and as directed by the EIC. |
| 98 | Repainting of old painted wooden/steel surfaces with two coats of synthetic enamel paint using first quality synthetic enamel paint of approved make and shade over one coat of approved wood/steel primer including preparing surfaces, filling with putty scaffolding and cleaning etc. including removing old paint by scrapping, blowlamp etc.complete all as directed by the EIC. |
| 99 | On wooden surface including one coat of wood primer |
| 100 | On steel surface including one coat of steel primer (Red oxide based) |
| 101 | Loosening and providing temporary supports to existing electrical fittings/ fixtures/ board for carrying out tiling work etc. and refixing it after completion of renovation including supplying & fixing casing capping & electrical wire wherever required as per deptt. specification etc complete all as directed by the EICNote: Measurement shall be for each fittings/ fixtures/ board. |
| 102 | Removing & refixing existing geyser with fittings & fixtures for carrying out tiling work etc.and refixing it after completion of renovation including supplying & fixing casing capping & electrical wire wherever required as per deptt. specifications etc complete all as directed by the EIC |
| 103 | Half brick masonry in partition walls using well burnt locally available bricks of approved quality in cement mortar 1:4 (Using factory made Ready Mix Mortar only) at all floors and levels, scaffolding, raking out joints, curing, etc. complete all as per specifications & as directed by the Engineer-in-Charge. |
| 104 | Providing 3 mm thick and 8 mm deep grout line using PVC spacers for creating true alignment and gap between vitrified tile flooring & Skirting at specified places as per drawings / as directed and grouting the joints with matching cementitious tile grout mixed with approved tile additive of M/s. Roff Construction or approved equivalent including cleaning the surface etc complete all as per specifications and as directed by the Engineer-In-Charge. |
| 105 | Providing & fixing IInd class teak wood in frames of required sections for doors, windows, ventilators, shaft doors, partition etc. wrought framed and fixed in position including providing & fixing necessary SS Screws and fixing frame in position including applying two coats of synthetic enamel paint of approved make and shade over a coat of approved wood primer for the exposed surfaces & two coats of bituminous paint to the surfaces of frames in contact with masonry / concrete etc. including removing the old damaged frames stacking serviceable material and disposing of debris inside Anushaktinagar colony at the location identified by EIC etc. complete all as directed by the EIC. |
| 106 | Supplying & fixing 10/18mm thick PVC integral free foam sheet in form of flush finish door shutter, manufactured by M/s. Jain Irrigation Systems Ltd. (Ex-cel sheet)/ M/s. Rajashree Plastiwood or other equivalent approved make of white colour, solid section, extruded rigid, light weight sheet with fine & homogeneous closed cell structure with smooth, glossy, hard surface finish on both sides, all edges to be smooth finish with mixture of PVC powder & solvent etc including dismantling the existing plywood/A.C sheet shutters, removing and refixing of architraves with necessary screws, stacking serviceable material and disposing off debris inside Anushaktinagar colony at the location identified by EIC etc. complete all as per specifications and as directed by the EIC. Note: The entire shutter shall be jointless shutter. |
| 107 | a) 10 mm Thick |
| 108 | b) 18 mm Thick |
| 109 | Supplying and fixing following type of fittings, fixtures and fastenings of approved quality along with necessary CP brass screws, bolts, nuts, washers and other standard accessories etc. complete all as directed by the EIC. |
| 110 | a) SS Piano hinges overall width of 19mm |
| 111 | Supplying & fixing matt finished, anodised aluminium heavy quality fittings, fixtures and fastenings of approved quality, along with CP brass screws, bolts and other accessories as per approved samples. complete all as per specifications and as directed by Engineer-in-charge |
| 112 | a) Baby latch 75 mm long x 12 mm barrel bolt |
| 113 | b) Handle 100 mm long |
| 114 | Providing and fixing fly proof stainless steel 304 grade wire mesh of 28 gauge(made out of 28 gauge wire) in the aluminium sliding door / window and clear story window, using wire gauge with average width of aperture 1.4 mm in both directions including providing and fixing of stainless steel screws and washer at maximum distance of 300 mm complete all as directed by Engineer-In-Charge. |
| 115 | Plain cement concrete 1:2:4 using graded stone aggregate of 20mm max. size at all levels and locations including mixing, laying, consolidation, finishing, curing, formwork including removing the existing flooring, finish and disposing off debris inside Anushaktinagar colony at the location identified by EIC etc. complete all as per specifications and as directed by the Engineer-in-Charge. |
| 116 | Providing and fixing following thickness of clear float/ frosted / Bajara sheet glass/Toughened glass of M/S Triveni/ shree vallabh/ IAG/Modi guard/ Saint Gobin or other approved equivalent manufacture and fixing with Aluminium frame work (door/ window) including fixing aluminium channel beading and providing and fixing 2 way EPDM gasketing to ensure water and air tightness and neoprene cushions/ gasket accommadated in grooves, necessary bronze anodised screws etc, all complete generally as per drawings specifications and as directed by Engineer in Charge |
| 117 | a) 8mm thick Toughened Glass |
| 118 | Supplying and fixing heavy duty superior quality fittings , fixtures and fasteners along with necessary CP screws, bolts, nuts, washers etc. as per approved samples. etc. complete all as directed by the E-I-C., |
| 119 | a) Providing and Fixing Door sliding channel of M/s. Hafale Make including all related fitting Note:- Top & Bottom measure jointly |
| 120 | b) Providing and fixing Cup-board lock of M/s. Victory make |
| 121 | c) Providing and fixing ovel socket/Consealed handle |
| 122 | d) Providing and fixing box hinges of M/s Hafale |
| 123 | Providing and fixing 1.0 mm thick decorative laminated sheet of plain /wood grain in gloss / matt finish of approved make with high density protective surface layer and reverse side of adhesive bonding quality conforming to IS:2046 Type S, including cost of adhesive of approved quality,removing and refixing door shutter, cutting, including cutting the shutters at bottom portion as per site condition ,wastage including disposal of debris outside colony etc complete all as per specifications and as directed by the EIC. |
| 124 | Providing & Fixing in position 25mm commercial block board shutters forcupboard, kitchen cabinet etc. bonded withphenolformaldihyde resin shutter ofapproved manufacture with second class teak wood lipping of size 25mm wide and20mm thick alround for cupboard fixing to(frames will be paid under relevant item)including providing second claass teak wood meeting styles of size 25 x25mm shape asshown in the drawing by cutting/planning ifnecessary including labour charges for fixingthe fittings and fixtures (cost of fittings &fixtures will be paid under relevant item)and if required painting all over with two coats ofsynthetic enamel paint over a coat ofapproved primer all complete as perspecifications, drawings and as directed byEngineer-in-Charge. |
| 125 | PART II : PH WORKS |
| 126 | 1. The equivalent product should match in respect of weight , quality, service, functionality, appearance from other manufacturers like Crabtree, Cera, Plumber, Johnson & Marc. Providing & fixing approved quality wash basin of M/s Hindware or other approved equivalant in white glazed vitreous chinaware supported on suitable wall brackets and of size mentioned below, including providing & fixing Jaquar Cat No. 705/709 CP brass waste coupling, including cost of removing the existing wash basin and fittings such as piller cock, inlet connection, stop cock, waste coupling, bottle trap etc.depositing serviceable material at dept store & disposing of debrisinside Anushaktinagar colony at the location identified by EIC etc complete all as per specifications and as directed by the Engineer-in-Charge. |
| 127 | i) 550 mm x 400 mm ( Approx Size ) MARIO Cat No. 10087 |
| 128 | Providing & fixing approved C.P. brass towel rods of size 600 mm x 20 mm with a pair of C.P. brass brackets, wall flanges etc. fixed to wall with C.P. brass screws, screwed on to rawl plugs etc complete including the cost of removing the existing one & returning to Stores etc complete all as per specifications and as directed by the Engineer-in-Charge. |
| 129 | Providing & fixing approved heavy quality 15 mm dia inlet connection with unions at the ends plastic pipes with brass unions including the cost of removing the existing one etc complete all as per specifications and as directed by the Engineer-in-Charge. |
| 130 | a) size 600 mm long |
| 131 | b) size 450 mm long |
| 132 | Providing and fixing approved quality 10 Ltrs. capacity PVC flushing cistern of Hindware Sleek Fresh with odorizer slot having single flush white colour or approved equivalent with all internal non ferrous fittings, pull chain including P&F inlet PVC connectors of approved make and quality and outlet connections and wall mounted on brackets, including providing and fixing PVC flush pipe Everlas or equivalent of 32 / 40 mm dia. to a length 1.00 M (approximate) and connecting to the flush tank with proper check nut and connecting to the W.C. pan and making leak proof joints etc., including cost of making chases in the wall, floors, removing the existing one depositing to deptt. Stores etc.complete all as directed by the Engineer-in-Charge. |
| 133 | Supplying & Fixing Stainless steel Sink of following size of approved make, moulded out of 19 SWG (1 mm ) stainless steel sheet of grade AISI 304 (18/8) with waste coupling conforming to IS 13983, placing and fixing the Sink in position to correct line and level with basket type choke-stop strainer, waste coupling , Check nuts etc. including the cost of jointing materials, finishing the edges with white / matching colour cement as per manufacturer's recommendation all complete, including cost of all etc. as per specification and as directed by the Engineer-in-charge. |
| 134 | a) Supplying and Fixing Stainless steel Sink' Nirali-Grace Plain' with 'Anti scratch surface' of overall size 610 x 460 mm ( Bowl size 560x410x250 mm ) |
| 135 | Removing and refixing existing Stainless steel sink along with other accessories, including labour charges, cleaning, testing, including providing and fixing pvc waste pipe etc. Complete all as per specifications and as directed by E.I.C |
| 136 | Providing & fixing in position best quality bevelled edge plate Glass Mirror of size 500x350 mm & 6mm thick with marine ply wood back 6 mm thick conforming to IS-710, CP brass cup screws and caps, washers etc. including providing & fixing rawl plug in wall, wooden packing behind the mirror if necessary, reinstating the damages to its original condition etc. and painting the ply with 2 coats of Synthetic enamel paint over a coat of wood primer etc. complete all as directed by the Engineer-in-Charge. |
| 137 | Providing & fixing in position approved quality CP brass Bib tap / Sink tap etc. of 15 mm nominal dia. with IS mark / approved make of following type including providing & fixing GI specials ,wall flanges and fixing to concealed / exposed CPVC / G.I.pipe line with leak proof threaded joints using spun yarn, white zinc etc., testing the joints, rectifying the leaky joints, if any, including cleaning etc. complete all as per specifications and as directed by Engineer- in- Charge. |
| 138 | a) C.P brass Sink Tap with swinging casted Spout (wall mounted type ) similar to 'Continental series' of ' JAQUAR' Cat. No. 347 |
| 139 | b) C.P brass long body Bib tap 2 in 1 similar to . FLORENTINE Series' of ' JAQUAR' cat. No. 5041 including providing and 'fixing Health faucet with 1.0 mt long flexible tube and wall hook( JAQUAR make Cat. No. 573) |
| 140 | Providing & fixing in position 15 mm diameter CP brass Stop Cock / Angle cock confirming to IS / approved make fixing the cock in position with white zinc and spun yarn, testing the joints for leakage etc. all complete as per specifications and as directed by EIC |
| 141 | a)Angular Stop Cock with wall Flang similar to ' Continental Series ' of 'JAQUAR' cat. No. 053 |
| 142 | Providing & fixing in position following size Bottle Trap of Jaquar Cat. No. 769 with C.P brass extension piece to wall C.P brass wall flanges etc. |
| 143 | a) size 32 mm |
| 144 | Providing & fixing in position 15 mm diameter CP brass Pillar Cock conforming to IS/approved make fixing the cock in position with inlet connection using white zinc and spun yarn testing the joints for leakage etc. complete all as per specifications and as directed by EIC. |
| 145 | a) C.P brass Pillar Cock 15 mm size having similar to 'CONTINENTAL' of 'JAQUAR' cat. No. 011 |
| 146 | Providing & fixing in position approved quality CP brass Wall mixer, 15 mm nominal dia. with IS mark and / approved make of following type including providing & fixing wall flanges and fixing to concealed / exposed water supply pipe line with leak proof threaded joints using spun yarn, white zinc etc., testing the joints for leakage all as per specifications and as directed by EIC. |
| 147 | a) Wall mixer with provision of over head Shower with 115 mm long bend pipe & wall flange similar to 'CONTINENTAL' of 'JAQUAR' cat. No. 273 |
| 148 | Providing & fixing in position CP Brass / Matt Chrome approved quality Shower of following type, fixing it to GI pipe line including jointing with white zinc and spun yarn etc., testing the joints etc all complete all as per specifications and as directed by the Engineer-in-Charge. |
| 149 | a) C.P brass Shower single flow with revolving wall joint with shower arm 190 mm long light body with wall flange of 'CONTINENTAL Series 'of 'JAQUAR' cat. No.491 & 477 |
| 150 | Providing & fixing in position 550x100mm wide & 6 mm thick Glass shelf with brass brackets of approved quality and fixing the Glass shelf on the wall to proper line & level using wall brackets with 40 mm long CP brass screws including making the wall to it's original condition and moulding of edges of glass etc. all as per specification & as directed by EIC. |
| 151 | Providing & fixing on Exposed or concealed surfaces the following dia Chlorinated Polyvinyl Chloride (C-PVC) pipe of specified class of M/s. SUPREME / PRINCE/ M/s. Jain Irrigation/M/s. Ajay pipes or other approved equivalent consisting following items of work:-i) Supplying & fixing C-PVC pipes, including necessary all fittings conforming to IS 15778ii) Laying and fixing the pipe and specials on exposed or concealed surfaces to correct line, level and plumb for water supply line, overflow and vent using M.S. nails/screws, rawl plugs, wooden gutties and branded clamps of Supreme/Prince make to the pipeline as per the site requirement.iii) Testing the pipe line to a hydraulic pressure as per manufacturers cataglouge for leak proof joint or as per relavant codeiv) Making leak proof threaded / solvent joints. including cutting the pipe, Joint preparartion, cleaning, marking, application of solvent, assembling, curing etc. and the cost of jointing cement solvent materials.v) Cutting or making hole or chases in RCC or brick work structure such as wall, column, beam, slab, chajja, dado etc. for passing the pipe line and reinstating all the damage to its original condition. proof joints.vi) Providing and fixing C-PVC jointable / threaded fittings such as Union, Nipples, Bendes, Elbows, Tees, Reducers, End caps, Couplers, Adaptors, Saddles, Plugs, Tank connectors, Expansion loops, Bypass bends, etcvii) including removing existing GI pipe line with fittings and specials etc.Note:- All brass threaded elbows and fittings shall be with additional support type of M/s. Prince, Supreme or other equivalent approved by EIC including necessary fixing arrangement such as screws, plug etc complete. ( Mode of measurement :- The measurement shall per Unit RM length of pipe line laid or fixed. The measurement shall be taken along centre line of pipe. No measurement shall be recorded saperately for fittings etc. ) |
| 152 | a) SDR 11 Pipes and Fittings 15 mm n.b |
| 153 | b) 32 mm n.b |
| 154 | c) 50 mm n.b |
| 155 | Providing chemical based water proofing of M/s Indofil chemicals / New coat of Dr. Fixit as approved over bath / WC brick bat coba & other locations as per the following procedure:a) Applying a coat of Indofie) Applying two coats of flex top coats with indofil flexcoat mixed with 85 parts indofil flex coat and 15 parts clean water or applying two coats of Dr.fixit New coat without dilution.l MC-76 mixed with clean water in 1:4 ratio i.e., one part of MC-76 and four parts of clean water over the entire area to be treated including filling of cracks, if any with CM-1:3 (Using factory made Ready Mix Mortar only) with waterproofing compound.b) Applying a coat of cement bond coat with MC-76 mixed with cement in 1:1 ratio i.e., 1 part of MC-76 and 1 part of cement.d) Applying one more bond coat with MC-76 mixed with cement in1:1 ratio i.e., 1 part of MC-76 and 1 part of cement over the polycon based net.Notes: (i) The entire work shall be carried out a per manufacturer's specification and as directed by the Engineer In Charge.ii) The contractor shall furnish guarantee bond on appropriate stamp paper in the proforma as per Appendix 'D' for the entire waterproofing treatment for maintaining the surroundings and under side surfaces of the waterproofing treatment in bone dry condition for 5 years. During the guarantee period the contractor shall attend all leakages, defects etc. if noticed, free of cost, starting the work of checking up and rectification within a week's time from the date of intimation about such leakages / defects. |
| 156 | Providing, laying, jointing, fixing & painting heavy quality (Class 'C') M.S. Galvanized pipes as per I.S. 1239-1968 including fittings like elbows, collars, tees, unions, couplings, reducers, enlargers, bends and all other fittings required for the completion except screwed flanges conforming to I.S. 1239-1968 & also as per the code of practice of water supply in bldgs. Of I.S. 2065-1972 including laying under floors, chasing, in walls, roof slabs and making good the same to the original conditions, including the cost of all jointing materials like hemp yarn, white or red lead, clamps, wooden gutties, screws, cement, sand etc. including painting the pipe with coats of synthetic enamel paint over a coat of Primer & wrapping hessian cloth in concealed portion including removing the old damaged G.I. Pipes & handing over to Deptt. Stores, scaffolding, testing the pipes etc. complete all as per specifications and as directions of the EIC. |
| 157 | a) 15mm dia. |
| 158 | Supplying and fixing following size PVC-SWR pipes and Fittings for soil, waste,vent and rainwater pipe lines consisting following items of work:-i) Supplying PVC - SWR pipes and fittings conforming to IS 13592 of approved make and standard PVC clamps ( approx. 3.2 mm thick ) and nails or MS galvanised clamps having minimum 3 mm thick for fixing the pipe.ii) Fixing the pipeline vertically to plumb, keeping the pipe barrel 50 mm away from the wall face, using PVC or MS galvanised clamps Including scaffolding.iii) Providing and fixing PVC Domed roof outlet (grating ) for RWP & PVC cowl for waste / soil pipe.iii) Providing and fixing PVC Domed roof outlet (grating ) for RWP & PVC cowl for waste / soil pipe.iv) Jointing the PVC pipes and specials by PVC solvent cement, rubber lubricant with rubber rings or any other approved equivalent method.v) Laying the pipeline below the ground to proper slope and gradient for making connection of soil and vent pipeline ( Vertical stacks ) with inspection chamber or manhole and waste water pipeline with gully trap chamber including the cost of cement mortar, water proofing compound etc., testing the vertical pipeline by smoke test and horizontal pipeline by 600 mm head of water and rectifying the leakages, if any all complete .vi) Cutting or making hole in RCC or brick work and reinstating the surface to it's original condition after passing the pipe with cement mortar / cement concrete etc. by adding approved water proofing compound. PVC - SWR Pipe & Fittings ( TYPE-B ) |
| 159 | a) 75 mm dia. |
| 160 | b) 110 mm dia. |
| 161 | Providing & fixing Chlorinated Polyvinyl Chloride (C-PVC) ball valve of 15 mm dia of class SDR 11 of M/s. SUPREME / M/s. PRINCE / M/s. Jain Irrigation / M/s. Ajay or other approved equivalent including all necessary fittings, fixing to correct line, level, plumb for water supply line, making leak proof solvent joints, including cost of all jointing solvent materials and testing to a hydraulic pressure for leak proof joint etc all complete all as per specifications and as directed by the Engineer in Charge. |
| 162 | Providing & fixing SWR PVC Nahani trap of self cleaning design with 75 mm outlet having a minimum water seal of 50 mm with S.S. Grating on top including necessary 1:2:4 cement concrete for embedding the trap etc. complete conforming to relevent I.S. including removing the existing one & depositing to Dept. stores etc. complete all as per specifications and as directed by the Engineer in charge. |
| 163 | Providing & fixing 125 mm dia S.S. grating for Nahani trap with necessary cement mortar 1:4 & matching cement and including removing existing grating, disposal of debris inside Anushaktinagar colony at the location identified by EIC etc complete all as per specifications and as directed by the Engineer in charge. |
| 164 | Providing and fixing Universal water closet suit comprising : a)Universal water closet with 'P' or 'S' trap similar to Model- Slick of M/s Hindware (Cat No. 20012) make Sanitary ware in white glazed vitreous chinaware b) Solid plastic heavy quality seat with lid similar to M/s. Hindware or approved equivalent and including cost of removing the existing one & disposing of debris inside Anushaktinagar colony at the location identified by EIC etc complete all as per specification and as directed by the EIC. |
| 165 | PART III : REBATE ITEMS |
| 166 | Rebate for Taking away dismantled item by the contractor |
| 167 | a) MS Windows made of Z Sections with glass |
| 168 | b) Teak wood frame |
| 169 | c) Panelled door shutters 32mm thick (approx) |
| 170 | d) CP Brass PH Items like bib tap, pillar cock stop cock, Towel rod, shower rose etc. |
| 171 | e) GI/CI pipe of various dia., grills, railing,reinforcement bars etc. |
| 172 | f) G M Valve up to 50mm |
| 173 | g) Scrap wood Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
| 8 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail