| 1 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Beyond 500 metre and upto 1.00 km |
| 2 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Beyond 1.00 km and upto 2.00 km |
| 3 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Beyond 2.00 km and upto 3.00 km |
| 4 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Beyond 3.00 km and upto 4.00 km |
| 5 | Compacting earthwork in embankment in layers of 25 cm. by power roller or by any other mechanical means, like tractor driven sheep foot roller/ vibrating plate compactor earth rammer etc., (not at OMC) including necessary watering, labour charges, hire charges of all materials, tools & plants etc. and including cost and supply of all materials complete as per direction of the Engineer-in-charge.(Payment will be made on the basis of Pre-work & Post-work level) |
| 6 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.20 cm av. Diameter |
| 7 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.20 cm av. Diameter |
| 8 | Supplying, fitting and fixing with iron nails half split bullah wailing piecesand cross pieces etc. complete with cost of all materials and carriage to site. Width of thinner end above 15 cm.Jhaw / Eucalyptus. |
| 9 | Supplying Nylon cage netting of size 1.0 metre x 1.0 metre x 0.40 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 10 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in H.D.P.E. bags (minimum 15 nos. ) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches up to 50 cms depth, if necessary, or by boat including cost of hire charges of boat with boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.0328 m3. Size of Nylon crate is 1.0 metre x 1.0 metre x 0.40 metre. b) Where boats are not necessary. Considering 85% filling of each bags for compacting in the crate for slope pitching as per guideline.Note: Considering 85% filling of each bag for comapcting in the crate for slope pitching as per guideline. |
| 11 | Making cubical bamboo porcupine cages with bamboo of 60 mm to 75mm dia. Having length of 1.8 metre each for all horizontal and vertical struts and 2.5 metre length for diagonal struts, 3nos horizontal and 3nos vertical struts should be placed equi-distant from each face to make the square cage of outer dimension 60 cm x 60 cm and projecting each strut by 60 cm on all directions. Two nos dioganals or cross bamboo posts should be placed on each face having their centre tied with the centre of cage properly including fitting, fixing corners, vertical, horizontal and diagonal struts with iron nails not less than 20 cm long and tying corners with 16 SWG galvanized iron wires, filling the cages with 1st class kiln burn Brick @ 40 nos bricks per cage. Cages builts with 10 SWG hexagonal or square pattern 10 cm mesh, with proper lapping, tying and sewing with 10 SWG GI wire including cost of all materials, carriage to site and laying the same in the bed or slope of the river etc. complete as per direction of the Engineer - in - Charge(N.B::- If G I wire netting is not considered then Rs.215.00 per cage may be deducted from the following costs, towards cost of wire netting including OH and contractor's profit.)\\"For cages of size 60cm x 60cm x 60cm with 1st class kiln burn BricksSingle cage Please Enable Macros to View BoQ information |