| 1 | Construction of a Cycle stand for Geography Dept. Golapbag B.U |
| 2 | Surface Dressing of the ground in any kind of soilincluding removing vegetation inequalities notexceeding 15 cm depth and disposal of the rubbishwithin a lead upto 75 m as directed. |
| 3 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. |
| 4 | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor) --In ground floor |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. including supply of rods, initial straightening and removal of loose rust cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction.-- G.Fl |
| 6 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 7 | Brick work with 1st. class bricks in cement morter (6:1) In foundation and plinth |
| 8 | Plaster to wall ceilling with sand cement morter (6:1) 20mm thick plaster |
| 9 | Neat cement punning about 1.5mm thick . |
| 10 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. |
| 11 | Supplying and laying Polythene Sheet(150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 12 | M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected toone another with bracket, gusset, cleat as per design, drawing &direction of Engineer-in-Charge complete including cutting torequisite shape & size, fabrication including metal arc weldingconforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete.For roof truss works |
| 13 | Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colourcoated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work).In Roof:-With 0.5 mm thick sheet |
| 14 | Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping) 300 mm lapping each way With 0.60 mm sheet. |
| 15 | Earth work in excavation of foundation trenches or drains,in all sorts of soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.Depth of excavation not exceeding 1,500 mm |
| 16 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis ofmeasurement of finished quantity of work) With earth obtained from excavation of foundation. |
| 17 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour 35 mm. thick |
| 18 | Filling in foundation or plinth by silver sand inlayers not exceeding 150 mm as directed andconsolidating the same by thorough saturation withwater, ramming complete including the cost of supplyof sand. |
| 19 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sandpapering etc. |
| 20 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. includingusing of approved putty etc. on the surface, if necessary b) On steel or other metal surface : Two coats (with any shade except white) |
| 21 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground flooras per relevant IS codes. |
| 22 | Add GST @ 18% EXTRA |
| 23 | ADD CESS @1% Please Enable Macros to View BoQ information |