| 1 | For Increasing Capacity of 25 to 63 & 63 to 100 KVA at Uncha Khera,Maluhi,Prakash City Colony,Akbarpur Kala,BIJUWAMAU GADHI,gondlamau,Naipalapur Village Railway Line,DENDHURAI,Near Asraf Contractor,SMD COLONY NAIPALAPUR,Secrate Heart Gali,DEEPIKA FOODS MOD, TEDWA,Kursinpurwa,Near Heera Panna Colony,Behda Village,AKOIYA,Bajdari Tola,Krishna Green City,BELVA BAHADURPUR, Devaria,DHARICHA BAZAR,GADHI SENPUR,KAIMA,KASIMPUR,SHEESH MAHAL COLONY,MAHESHPUR,Masoompur,MISHRAPUR,Nerpur,Jajpur,Mirchaudi,Raipur Village,MUNSHIPURVA,Nankari,SARAI MALHUI,SARFAPUR,Sahmaholi near chauki,Shanti Nagar Kamal Sarai,GADHI,TENDUA,TIKARIYA,MAHMDAPUR NO 2,HADEERA,PISAWAN GOWN,Barahmaukala (Pisawan),Barahmaukala (Pisawan),BAUNABHARI,BHATPUR,MANDARUVA,KARANPUR 1,MADARI,SHEKHPUR under EDD-Sidauli, Sitapur .The following works involves. |
| 2 | Supply of Holding for PCC Pole |
| 3 | Supply of Holding Clamp For Top/Dropper Channel |
| 4 | Supply of 11 KV F Clamp For PCC Pole |
| 5 | Supply of LTMS Clamp For PCC Pole |
| 6 | Supply of Stay Clamp |
| 7 | Supply of Nut Bolt |
| 8 | Supply of Earthwire Clamp |
| 9 | Supply of Stay Insulator |
| 10 | Supply of LT Clamp with I Hook |
| 11 | Supply of Dead End Clamp |
| 12 | Supply of Suspensation Clamp |
| 13 | Supply of Clamp for Distribution Box |
| 14 | Supply of 11 KV Fuse Set |
| 15 | Carriage of PCC Pole From ESC, Sitapur to Dump Site |
| 16 | Carriage of 11 mtr ST Pole From ESC, Sitapur to Dump Site |
| 17 | Carriage of 63/100 KVA From ESC, Sitapur to Dump Site Sitapur |
| 18 | Carriage of LT ABC 3x50+1x35+1x16 sqmm From ESC, Sitapur to Dump Site |
| 19 | Carriage of LT ABC 3x95+1x70+1x16 sqmm From ESC, Sitapur to Dump Site |
| 20 | Carriage of LT ABC 3x120+1x95+1x16 sqmm From ESC, Sitapur to Dump Site |
| 21 | Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site |
| 22 | Carriage of other Line Material From ESC, Sitapur to Dump Site, Sitapur |
| 23 | Shifting of PCC Pole From Dump Site to Work site |
| 24 | Shifting of 11 mtr ST Pole From Dump Site to Work site |
| 25 | Shifting of 63/100 KVA From Dump Site to Work site |
| 26 | Shifting of LT ABC 3x50+1x35+1x16 sqmm From Dump Site to Work site |
| 27 | Shifting of LT ABC 3x95+1x70+1x16 sqmm From Dump Site to Work site |
| 28 | Shifting of LT ABC 3x120+1x95+1x16 sqmm From Dump Site to Work site |
| 29 | Shifting of ACSR Weaseal Conductor From Dump Site to Work site |
| 30 | Shifting of other Line Material From Dump Site to Work site |
| 31 | Fabrication of Top, T-off, Dropper Chaneel etc. |
| 32 | Erection of Single PCC Pole with all fitting |
| 33 | Erection of 11 mtr Single ST Pole with all fitting |
| 34 | Laying, stringing & Sagging of LT ABC 3x50+1x35+1x16 sqmm |
| 35 | Laying, stringing & Sagging of LT ABC 3x95+1x70+1x16 sqmm |
| 36 | Laying, stringing & Sagging LT ABC 3x120+1x95+1x16 sqmm |
| 37 | Laying, stringing & Sagging of ACSR Weaseal Conductor |
| 38 | Dismentalling of old 25/63 KVA T/F |
| 39 | Mounting of T/F 63/100 KVA on Double Pole and making connection |
| 40 | Fixing of stay |
| 41 | Earthing of Pole |
| 42 | Earthing of T/F with materials |
| 43 | Pipe Earthing |
| 44 | Grouting of Pole |
| 45 | Grouting of stay |
| 46 | Safe Carriage of Loading & Un Loading of 25/63 KVA T/F From work site to JE Store/ESC, Sitapur Please Enable Macros to View BoQ information |