| 1 | Earth work in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P,royalty etc. complete and as directed by the Engineer-in-charge. |
| 2 | Filling in foundation & plinth with sand in 22.5cm(9\\") thick layers including watering and ramming with all cost conveyance royalty, taxes of the materials and labour with T&P required for the work etc. complete or as directed by the Engineer-in-charge. |
| 3 | Plain Cement concrete (1:3:6) with 4cm size H.B, h.g metal of approved quality and from approved quary including hoisting,lowering, and laying in layers to 10cm(4\\") thick to required level, ramming,watering including all cost & conveyance of all materials and labour with T&P required for the work with all taxes and royalities complete in all respects and as directed by the EIC. |
| 4 | FLY ASH Bricks Masonry .25x12x8 Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in foundationin and plinth including cost, carriage and royalty etc. |
| 5 | FLY ASH Bricks Masonry .25x12x8 Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in Supersrtcture including cost, carriage and royalty etc. |
| 6 | Reinforced cement concrete (1:1.5:3) in foundation , column, beam, slab using 12mm size h.g, C.B. broken hard granite chips of approved quality and from approved quary including hoisting, lowering and laying in layers not exceeeding 15cm thick to the required level ,ramming,watering and curing etc. including all cost of material, labour, with T&P and taxes of materials etc. required for work and as per direction of EIC. |
| 7 | Supplying fitting, with Straightening, cutting, bending, cranking, hooking, welding or jointing (if required) the HYSD steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works and for providing cost, conveyance and taxes of M.S. rods or Tor steel including binding wires of 18 to 20 gauge and labour with all T&P required for the work etc. completefor ground floor or as directed by the Engineer-in-charge. |
| 8 | Rigid and smooth centering & shuttering for RCC works and dismetaling them after casting including all cost, conveyance, etc. complete. |
| 9 | Column Base |
| 10 | Lintel |
| 11 | Beam/Column |
| 12 | Slab/Chajja |
| 13 | 12 mm thick Cement Plaster with CM (1:6) including all cost, conveyance & royalty etc. complete. |
| 14 | 16 mm thick Cement Plaster with C.M (1:4) including all cost, conveyance & royalty etc all complete. |
| 15 | Supplying,Fitting and Fixing of MS Doors and Windows including all cost of Material and Labour Charges etc complete |
| 16 | Fixing Vetrified tiles (600x600mm) in floors,treads of steps and landing on 20 mm thick bed of cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, labours T&P, rubbing and polishing etc all complete. |
| 17 | Fixing Vetrified Tile n dadoes and skirting on 12 mm thick bed of cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, labours T&P, rubbing and polishing etc all complete. |
| 18 | Finishing surface of wall with Acrilic Wall Putty (Water based) of approved make and finished smooth and even surface to received painting including cost of puty all labour T&P etc complete. |
| 19 | 20 mm thick CP with CM (1:6) including all cost, conveyance & royalty etc. complete for stone work. |
| 20 | Painting two coat with any approved paint on Iron work over a coat of priming including all cost,carriage,royalty etc omplete. |
| 21 | Finishing wall Oil Bound cement primer one coat to plaster work over a coat of priming including all cost,carriage,royalty etc omplete. |
| 22 | Two coats of weather coats of approved quality to out side finishing area |
| 23 | Two coat of plastic emulsion paint of approved quality to inside finishing area etc complete Please Enable Macros to View BoQ information |