|
| 1 | Earth work in excavation in hard soil within initial lead and lift as per direction of the Engineer-in-charge |
| 2 | Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charge. |
| 3 | Providing & laying plain cement concrete (1:3:6) using 4cm size metal etc. complete including all labour, materials & royality etc. complete as per direction of EIC. |
| 4 | Brick work with Fly Ash bricks 25cm x 12cm x 9cm size having crushing strength not less than 35 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth etc complete. |
| 5 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Column & Base footing |
| 6 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Column s\s |
| 7 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Plinth beam |
| 8 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.lintel band |
| 9 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Chajja |
| 10 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Roof beam |
| 11 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Roof slab |
| 12 | Supplying,Cutting ,straightening of steel HYSD (Fe- 500) conforming to (IS- 1786) with bending, binding, cranking, hooking, welding etc. as per the direction of Engineer in charges |
| 13 | Fly ash brick masonary of size 25cmx12cmx8cm and crushing strength not less than 75 kg/cm2 in C.M.(1:6) in Super structure including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge. |
| 14 | 20mm thick grading plaster with cement mortar (1:4) over roof slab laid to proper slope finished smooth watering and curring including cost ,conveyance, royality , taxes of all materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge. |
| 15 | 12 mm thick cement plaster (1:6) including all cost and conveyance, royalty, taxes of all materials etc.complete as directed by the Engineer in Charge. |
| 16 | 16 mm thick cement plaster (1:6) including all cost and conveyance, royalty, taxes of all materials etc.complete as directed by the Engineer in Charge. |
| 17 | 6mm thick celling plaster (1:4) over R.C.C surface including all cost and conveyance, royalty, taxes of all materials etc.complete as directed by the Engineer in Charge. |
| 18 | Supplying, fitting & fixing with Ceramic floor tiles of size 300x300mm in floor on 25 mm thick C.P. (1:1) (1cement : 1sand) jointed with neat cement Slurry mixed with pigments to match the shade of the tiles including rubbing, polishing and all cost & taxes of materials, labour,& curing etc. complete. |
| 19 | Fixing Ceramic wall tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles. |
| 20 | Supplying of M.S.Door Window &Grill made out of structural steel, flats, plates, bars confirming to IS for windows, ventilators etc. as per drawing and design, fixed to walls with clamps including priming 1 coat with all kdamages in walls and floors etc. including cost of all materials, labour, conveyance, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants etc.as per the direction of the Engineer in Charge. |
| 21 | Supplying, fitting and fixing vitrified industrial floor tile 30x30cm premium grade 8 to 10 mm thick in floors of approved make laid on 20mm thick C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, takes labour T&P etc required for the work. per 1 sqm (Data for 10 sq.mt.) |
| 22 | Plastic paint two coats to wall with Paint over a coat of wall primer of any approved shade including cost of all charges etc.. |
| 23 | Finishing wall surface with two coats of weather coat over a coat of cement priming including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges. |
| 24 | Painting two coats of synthetic enamel paint over a coat of primer including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges. |
| 25 | Supplying, fitting & fixing of stainless steel of 304 grade in hand railing using 50mm dia. of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @2.90m c/c & stainless square pipe bracing of 32mmx32mmx2mm in three rows in staircase as per approved design and specifications buffing, polishing etc. with cost, conveyance, taxes of all materials, fitting & fixing in position, labour, T&P etc. required for complete in all respect. Please Enable Macros to View BoQ information |