|
| 1 | Checking and attending to leakages in bib taps, mixer, stop cocks, angle valves, flushing cistern, GI pipes etc including removal of air lock/blockage of water in GI tubing, cleaning the pipe or fittings including replacement of defective material/items and all connected plumbing works etc., complete all as specified and directed by Engr-in-charges. (Note :- Defective/replaced item will be paid separately). |
| 2 | Checking and attending to welding work in repairs to steel windows, handles,door springs, iron frame of doors, rolling shutter garrages and other iron misc works, repair by welding ( run or spot welding as per site require ment) including replacement of defective items/material alongthwith & including welding machine gloves, welding glass, welding rod any other tools required, as per requirement, complete all as specified and directed by Engr-in-charges. (Note :- Defective/replaced item will be paid separately). |
| 3 | Checking and attending to carpenter work in repairs to joinery (wooden/steel/aluminium) of iron/aluminium mongery, pelmet box, door spring, rolling shutters etc requiring carpentery work and carrying out minor repair such as tighting of screws/nails, wire of false ceiling, easening of joinery, door spring etc including replacement of glass panes, wirelcoth to joinery or any defective items/materials, easing of door shutters, window shutters, kitchen cupboard shutters, show case shutter drawers incl fixing of screws for easy closing/opening and tightening of hinges or changing the position of hinges, adjustment of tower bolts, sliding bolts with new screws etc complete all as specified and directed by Engr-in-charges. (Note :- If Defective/replaced item is there any, will be paid separately). |
| 4 | Checking and attending to cleaning and maintenance of sewage system including blockage/choke in WHB, bottle traps, kitchen sink/Nahani tras/floor traps, water closet, soil/waste pipe running on external walls of bldgs including junction holes of any description and sewage line of any sizes upto first manhole in running/flowing order without blockage of any description in any situation manually and mechanically as required including all equipment viz bamboo,tools, sewage pump, sewage machine etc including replacement of defective items /materials and refixing covers to manhole/ gully trap in position etc. after cleaning and removing the deposited sludge/ solid/ liquid material outside MD land complete all as specified and directed by Engr-in-charges. Please Enable Macros to View BoQ information |
| 5 | Checking and attending to cleaning and maintenance of sewage system including blockage/choke in WHB, bottle traps, kitchen sink/Nahani tras/floor traps, water closet, soil/waste pipe running on external walls of bldgs including junction holes of any description and sewage line of any sizes upto first manhole in running/flowing order without blockage of any description in any situation manually and mechanically as required including all equipment viz bamboo,tools, sewage pump, sewage machine etc including replacement of defective items /materials and refixing covers to manhole/ gully trap in position etc. after cleaning and removing the deposited sludge/ solid/ liquid material outside MD land complete all as specified and directed by Engr-in-charges. Please Enable Macros to View BoQ information |