| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: COMMANDER WORKS ENGINEER BAREILLY Name of Work: SPECIAL REPAIR TO COOLING COIL, INSULATION OF CHILLER PIPE AND ITS CONNECTED ITEMS OF CENTRAL AC PLANT INSTALLED AT MH BAREILLY UNDER GE (WEST) BAREILLY Contract No : CWE / BLY / GE(W) /49 OF 2026-27 Bidder Name : SCHEDULE A(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Supply removing and fixing of AHU cooling coil 3200 CFM .The chilled water coil shall be of copper tube with Aluminum fins. The coil shall be made from seamless solid drawn copper tubes. The minimum thickness of the tube shall be 0.5mm for cooling/ heating. The coil shall be with 6 rows deep with 11 to 13 fins per inch spacing. The minimum thickness of the fins shall be 0.15mm nominal. The coil shall be designed and tested for a pressure of 10 Kg/ Sq.cm (g) and. U-bends shall be of copper, jointed to the tubes by brazing. |
| 3 | Supply removing of pluged copper tubing of chiller unit No 2 and fixing of size 6/8\\" Copper tube suitable for make Carrier Model No 30HXC155A 1x146 TR .complete all as specified and directed |
| 4 | Dehydration of Carrier make chiller unit with changing Compressor Oil, pressure testing with nitrogen vaccumizing and refilling of refrigerant in the system . |
| 5 | Supply and installation of chiller expansion PVC storage tank capacity 2000 Ltr insulated with thermal insulation with Class O closed cell nitrile rubber having thickness of 50 mm (Thermal conductivity is 0.035 w/m as per EN12667/ ISO 8497 and having μ value ≥ 6000) |
| 6 | Supply, installation and fabrication of thermal insulation with Class O closed cell nitrile rubber having thickness of 50 mm for Chiller unit (Thermal conductivity is 0.035 w/m as per EN12667/ ISO 8497 and having μ value ≥ 6000). |
| 7 | Supply installation and fabrication of 100 mm three way valve with actuator for chiller water line and fitted with flange and rubber gasket of the same . Size of pipe: 100 mm dia. |
| 8 | Supply installation and fabrication of 80 mm three way valve for the inlet and outlet chilled water line needs to be supplied and fitted with flange and rubber gasket of the same . Size of pipe: 80 mm dia. |
| 9 | Supply, fixing for Insulation of M S Pipe 100 mm with PUF slab 40 mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete |
| 10 | Supply, fixing for Insulation of M S Pipe 150 mm with PUF slab 40 mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete |
| 11 | Supply and fix thrmocol insuation section w chilled water piping of 150 mm bore with density not less than 20 Kg/cum covered with a layer of 120 gm / sqm polythene sheet (as vapour barrier) duly reinforced with 26 guage chicken wire mesh with buffing of all joints and tied town with GI lacing wire and finally finished rigid with26 guage aluminium foil cladding if laid inside the building , and with cement mortar of 1:3 of 12 mm thick if laid in ground or air outside the building complete including excavation, refiling making good the excavated surface wherever the pipes are required to be laid in ground. |
| 12 | Supply, installation, fabrication and commissioning of 80 mm butterfly valve for the inlet and outlet chilled water line needs to be supplied and fitted with flange and rubber gasket of the same |
| 13 | Supply, installation, fabrication and commissioning of 100 mm butterfly valve for the inlet and outlet chilled water line needs to be supplied and fitted with flange and rubber gasket of the same |
| 14 | Supply, installation, fabrication and commissioning of 150 mm butterfly valve for the inlet and outlet chilled water line needs to be supplied and fitted with flange and rubber gasket of the same |
| 15 | Supply and fix Automatic Air Vents of auto air vent purging valve of 20 mm dia. with isolating valve at chiller water pipe line at all AHU units complete as per specifications. |
| 16 | Supply and fixing SS pressure gauge 4” dial type suitable for pressure 0 to 14 Kg with ball valve ½” dia. |
| 17 | Supply, installation, testing and commissioning of Thermometer dial type for both inlet and outlet with required accessories etc. |
| 18 | S&F suspended false ceiling using Desiner E-grid 2430, 180 GSM (exposed ceiling suspension system ) of grid size 600mmx600 mm with main runner 38 mm x 24 mm and wall angle 24mm x 24mm using 4mm thick High Pressure stean Crude Everest Non Asbestos Fiber Cement plain Board (E-Board Classic) in & including a grid of GI system duly suspended with 4mm dia GI wire hanger fixed with providing positions for light fixtures,air conditioning diffuser and ducts ,sprinkler ,smoke detectors etc.The main runners to be secured to structural soffits by hanger @ 1220 mm maximum c/c. the last hanger at the end of each main runner should not be placed at more than 450mm from the adjucent wall,Flush fitting 1220 mm cross tee to be interlocked between main runners @ 610mm c/c,so as to form 600mm x 600 mm grid incl taking down old ceiling with frame and making good disturbed surface complete all as specified and directed . |
| 19 | M&L POP (Plaster of Paris) false ceiling applying 10 to 12 mm thick POP finish over ceiling surfaces with wall care putty mixed with POP powder in ratio of 1:10(a) PGI sheet of 26 gauge in angle shape of size 25 x 25 mm all around the wall complete.(b) Main runners of 26 gauge PGI sheet in angle shape of size 35 x 25 mm at the interval of 90 cm centre to centre complete. complete including one dome not less than 1 metre dia and frame work complete all as described below : (c) Cross runners of 26 gauge PGI sheet in angle shape of size 35 x 25 mm at 40 cm center to center complete.(d) Suspender/ hanger of 26 gauge of PGI sheets in angle shape of size 25 x 25 mm fixed to soffits of roof by steel fastener complete.Including Dismantling of plaster of paris ceiling (Gypsum anhydrous) to flat surface including framework and G.I. wire mesh complete all as specified and directed. |
| 20 | Supply , assembly and erection of GI sheet with C & SS rectangular/square duct made out of 'L' shaped hollow profile, duly factory boxed, incl all accessories such as Corner, Cleat, Carriage olt, Gasket and appropriate sealant on longitudinal joints etc complete of size 24 Gauge. |
| 21 | Supply, installation, fabrication and commissioning of Humidifier of Existing AHU rooms pan type Stainless steel (AISI304) of min 18 gauge with water level controller, Immersion heater for warm humidification ,fixed on stainless steel drain pan with double slope for quick discharge of moisture with On/Off modulating linked to the main AHU controller . |
| 22 | Supplying and laying of CPVC pipes outer dai meter 32mm SDR 11 & Plain CPVC SDR 11 fittings in trenches or on floor complete all as specified.for humidifiers with all accessories viz., adhesive, bends, tees, couplers, elbow etc. Total in Figures 0.0 23 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |