| 1 | Taking down cement plaster of any description including racking out joints, hacking for key scrubbing down with water etcand removal of entire debris as ordered outside MD land complete all as directed. |
| 2 | M&L for rendering 5 mm thick in CM 1:3 on brick work/stone work or concrete surface in ceiling finished the surface even and smooth without using extra cement complete all as specified. |
| 3 | M&L for rendering 10 mm thick in CM 1:3 on brick work/stone work or concrete surface in ceiling finished the surface even and smooth without using extra cement complete all as specified. |
| 4 | M&L for rendering 10 mm thick in CM 1:6 on brick work/ block concrete surface on walls finished the surface even and smooth without using extra cement complete all as specified. |
| 5 | M&L for rendering 15 mm thick in CM 1:6 on brick work/ block concrete surface on walls finished the surface even and smooth without using extra cement complete all as specified. |
| 6 | M&L for rendering 15mm thick on stone/brick masonary surfaces or concrete surface or surface other than fair face of brickwork or on one side of lathing in CM 1:4 mixing with WPC as per manufacturer's instruction, finishing the surfaces even & smooth without using extra cement on external surfaces of wall incl chajja including necessary scaffolding and safety measures complete all as specified and as directed. Note : WPC to be measured and paid separately under relevant item |
| 7 | Supply only liquid waterproofing compound complete all as specified and directed. |
| 8 | M&L for preparation of newly plastered wall surfaces and applying two coats of oil bound distemper (OBD) on with airless electric sprayers over a coat of primer applied using airless electric sprayers over one coat of wall care putty of 1.5 mm average thickness prepared and sanded with electrically operated sanding machine including necessary scaffolding and safety measures wherever necessary. Complete process will be carried out as smart periodical and to be done through the authorised applicator complete all as specified and directed. |
| 9 | All same as per item No. 08 here- in – above but as in ceiling surfaces complete all as specified and directed. |
| 10 | M&L for preparation of newly plastered wall surface and applying two coats of exterior emulsion paint (anti dust weather coat) with airless electric sprayers over a coat of primer applied using airless electric sprayers over one coat of wall care putty of 1.5 mm average thickness prepared and sanded with electrically operated sanding machine including necessary scaffolding and safety measures upto five floors height. Complete process will be carried out as smart periodical and to be done through the authorised applicator complete all as specified and directed. |
| 11 | M&L for complete removal of existing treatment and applying two coats of exterior emulsion paint (anti dust weather coat) on wall surface with airless electric sprayers over a coat of primer applied using airless electric sprayers over one coat of wall care putty of 1.5 mm average thickness prepared and sanded with electrically operated sanding machine including necessary scaffolding and safety measures upto five floors height. Complete process will be carried out as smart periodical and to be done through the authorised applicator complete all as specified and directed. |
| 12 | M&L for preparation of old decorative surfaces of wall including, cornices (plastered or unplastered) of any description, rubbing, scrapping by hand held sander / long handle sander and washing and applying one coat of cement base paint by mechanical means / auto roller complete all as specified and directed. |
| 13 | All as per item No 12 here-in- above but on but two coat of CBP complete all as specified and directed. |
| 14 | M&L for preparation of old plastered / decorated wall surfaces by brooming down or steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of oil bound distemper including necessary scaffolding and safety measures as required complete all as specified and directed |
| 15 | All as per item No 14 here-in- above but on but two coat of OBD complete all as specified and directed. |
| 16 | All same as per item No. 14 here- in – above but as in ceiling surfaces complete all as specified and directed |
| 17 | M&L for complete removal of existing treatment and applying two coats of oil bound distemper (OBD) on old plastered wall surface with airless electric sprayers over a coat of primer applied using airless electric sprayers over one coat of wall care putty of 1.5 mm average thickness prepared and sanded with electrically operated sanding machine including necessary scaffolding and safety measures wherever necessary. Complete process will be carried out as smart periodical and to be done through the authorised applicator complete all as specified and directed. |
| 18 | All same as per item No. 17 here- in – above but as in ceiling surfaces complete all as specified and directed |
| 19 | M&L for providing and applying wall putty of 1.5 mm average thickness on ceiling/walls over plastered/unplastered surface to prepare the surface even and smooth complete all as specified and directed. |
| 20 | M&L for preparation of old painted wooden surfaces exc 10 cm width or girth all as specified in SSR Part-I and applying one coat of Ist quality synthetic enamel paint, complete all as specified and directed. |
| 21 | All same as per item No 20 here-in-above but one coat on steel suface complete all as specified and directed. |
| 22 | M&L for preparing old/new plastered surfaces of wall/ceiling and applying two coats of damp guard/ damp proof coating/ paint over a coat of primer as per manufacturer instruction complete all as specified and completed |
| 23 | M&L Preparation of old surfaces of wall including scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc by hand held sander / long handle sander including cornices, pilasters etc (Plastered or unplastered surfaces) and applying one coat of white wash complete all as directed. |
| 24 | All as per item No 23 here-in- above but on but two coat of white wash complete all as specified and directed. |
| 25 | All as per item No 23 here-in- above but on ceiling surfaces complete all as specified and directed. Please Enable Macros to View BoQ information |