| 1 | Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m.In ground floor including roof. |
| 2 | 1st floor |
| 3 | 2nd floor |
| 4 | 3rd floor |
| 5 | 4th floor |
| 6 | Labour for taking out steel door and window frame for repairs and re-fixing the same (or replacement by new one) including mending good damages (excluding the cost of repair of damages) and applying a protective coat of paint.Upto one sq.m.area of frame. |
| 7 | Taking out Mirzapur or glazed porcelain tiles carefully by chiselling from walls or floor including stacking serviceable material as directed |
| 8 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof.(a) upto 150 mm. thick |
| 9 | 1st floor |
| 10 | 2nd floor |
| 11 | 3rd floor |
| 12 | 4th floor |
| 13 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. |
| 14 | Cutting chase upto 125x150mm and subsequent mending of damages. |
| 15 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.In ground floor including roof.1st floor |
| 16 | 2nd floor |
| 17 | 3rd floor |
| 18 | 4th floor |
| 19 | Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment] |
| 20 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge |
| 21 | Applying 2(two) coats of acrylic polymer modified paint (equivalent to MASTER CRETE M-81 of choksey or similar specified product ) having water proofing cum bonding properties for specific use of water prone area to prevent leakage underneath by mixing in proportion( 1 liquid compound : 2 cement ) as per manufacturer's specification. |
| 22 | Supplying and application of chemical for post Installed rebar connection by using ETA approved for seismic criteria in rebar connection, Including drilling hole to the required depth by rotary hammer drill, cleonlng with brush &jet of clean air, /ill/ng chemical usIng serrated noule to eliminate mIxIng error and in a voldless manner IncludIng charges for all tools & plants. Application to be designed for post· Installed rebars as per ECZ/TR023 or relevant tested etc.Cost of post installed rebaring application with chemical as specified for 10 mm dia per cm of depth |
| 23 | Cost of post Installed rebaring application with chemical as specified for 16mm dia per em of depth |
| 24 | Removing corroded worn out portion of reinforcement (when the area of bar is damaged by more than 25%) by cutting and replacing the same by a new plain round bar of requisite diameter by binding with required lap / welding with old bar, including cost of reinforcement, complete in all respect including removing unserviceable materials from site as per direction of the Engineer - in - charge. Note : Payment on weight (Kg.) of new reinforcement. |
| 25 | Welding in M.S. structural work with gas or electricTack weld |
| 26 | Continuous weld. |
| 27 | Guniting concrete surface with cement mortar (25 mm nominal thick) applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification. |
| 28 | Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy. |
| 29 | Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. |
| 30 | Applying epoxy mortar ( 10 mm nominal thick) over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification |
| 31 | Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface). |
| 32 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering |
| 33 | Supply, preparing and placement of ready mix non-shrink, cementitious micro-concrete having no metalic aggregate or chlorides for reparing and of damaged RCC members. The micro-concrete should achieve a compressive strength of not less than 10 MPa after 24 hours, 40MPa after 7 days and 50 MPa after 28 days at 300C. It should have unrestrained expansion in between 1 - 4%. The flexural strength shall not be less than 5N/mm2 @ 28 days. The micro-concrete shall have a coefficient of tharmal expansion similar to that of the host concrete. |
| 34 | Lime punning about 3mm. Thick with stone lime and shell lime (1:2). |
| 35 | Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge.25 mm thick (Excluding I.R.C. mesh) |
| 36 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. Pakur Variety |
| 37 | 1st floor |
| 38 | 2nd floor |
| 39 | 3rd floor |
| 40 | 4th floor |
| 41 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]With 1:6 cement mortar 20 mm thick |
| 42 | 1st floor |
| 43 | 2nd floor |
| 44 | 3rd floor |
| 45 | 4th floor |
| 46 | 5th floor |
| 47 | With 1:4 cement mortar 10 mm thick (ground floor ) |
| 48 | 1st floor |
| 49 | 2nd floor |
| 50 | 3rd floor |
| 51 | 4th floor |
| 52 | 5th floor |
| 53 | With 1:6 cement mortar 15 mm thick (ground floor ) |
| 54 | 1st floor |
| 55 | 2nd floor |
| 56 | 3rd floor |
| 57 | 4th floor |
| 58 | With 1:4 cement mortar 10 mm thick (1st floor) |
| 59 | 2nd floor |
| 60 | 3rd floor |
| 61 | 4th floor |
| 62 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc.WallWith Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m.Area of each tile above 0.09 Sq.mColoured decorative |
| 63 | FloorWith Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m.Area of each tile above 0.09 Sq.mColoured decorative |
| 64 | 1st floor |
| 65 | 2nd floor |
| 66 | 3rd floor |
| 67 | 4th floor |
| 68 | Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position butexcluding the cost of hinge and other fittings.In ground floor.40 mm thick shutters with 19 mm thick Panel of size 30 to 45 cmSishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak |
| 69 | 1st floor |
| 70 | 2nd floor |
| 71 | 3rd floor |
| 72 | 4th floor |
| 73 | Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (Concrete and brick work for mending damage will be paid separately) upto area 2.5 sqm |
| 74 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame Sal Malayasian |
| 75 | Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987.6mm thick clear glass. |
| 76 | Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark.100mm. X 58mm. X 1.90mm. |
| 77 | Anodised aluminium barrel / tower / socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixedwith cadmium plated screws:300mm long x 12mm dia. bolt. |
| 78 | Anodised aluminium grip handle with base plate of approved quality fitted and fixed complete.With base plate.165mm grip x 12mm dia rod x 42mm plate 3.2mm thick |
| 79 | Anodised aluminium Aldrop / Sliding bolts of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 2681/66) fitted and fixed complete. |
| 80 | Removing old scales, blisters etc. of interior surface of walls,ceiling by scraping etc. and preparing smooth and even surface with rendering or cement mortar (1:2) (as necessary), to make the surface suitable for receiving distemper. (Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge) |
| 81 | Scraping of moss, blisters etc.thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.(Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge) |
| 82 | Rendering the surface of walls and ceiling with white cement based wall putty of approved make and brand(1.5mm thick) |
| 83 | Providing and fixing exterior quality Aluminium Composite Panel (ACP) wall cladding on existing Al. /MS frame work with GI brackets, ACP fixed on the existing frame work by folding the edges of ACP panel (Engraving the rear surface of ACP sheet) with CP angles, cleats and strainless Steel screws forming groves at the periphery of ACP panel. Such grooves filled with foam and silicon sealant etc. complete with all materials (but including the cost of silicon sealant), labour, scaffolding and all other incidental charges complete in all respect as per specification and direction of Engineer-in-charge. (Mode of payment is on finished surface area of ACP)3mm thick (0.25mm Al.+2.5mm LDPE +0.25mm Al. PVDF coating) |
| 84 | Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick) |
| 85 | 1st floor |
| 86 | 2nd floor |
| 87 | 3rd floor |
| 88 | 4th floor |
| 89 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC Two CoatsWater based interior grade Acrylic Primer |
| 90 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC.Two coats |
| 91 | 1st floor |
| 92 | 2nd floor |
| 93 | 3rd floor |
| 94 | 4th floor |
| 95 | (a) Priming one coat on steel or other metal surface with synthetic oilbound primer of approved quality including smoothening surfaces by sandpapering etc |
| 96 | Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 97 | Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) :(Two coats) |
| 98 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat) |
| 99 | 1st floor |
| 100 | 2nd floor |
| 101 | 3rd floor |
| 102 | 4th floor |
| 103 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :On timber or plastered surface :With super gloss (hi-gloss) -Two coats (with any shade except white) |
| 104 | (b) On steel or other metal surface :With super gloss (hi-gloss) -Two coats (with any shade except white) |
| 105 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 106 | 18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick(avg) cement mortar (1:4) in floor, stair & lobby includingpointing in cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as perdirection of Engineer - in - charge to match with the existing work. [Slurry for bedding @ 4.4 kg/Sq.m and pointing @2.0 kg/Sq.m] |
| 107 | Extra cost of labour for prefinished and premoulded Nosing to treads of steps, railing, window sill etc. of Kota Stone. |
| 108 | Extra cost of labour for grinding Kota Stone Floor in treads and riser of Steps. |
| 109 | Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)For Exposed WorkPVC Pipes (Dia)150 mm |
| 110 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floore) Extra for staging beyond 4 m in any floor (Mode of measurement: area in plan x mean height of staging upto soffit of shuttering above initial 4 m). |
| 111 | Supplying, fitting and fixing cast iron spun pipe conforming to I.S. 1536/1976 with all necessary specials including cutting trenches in any soil or through masonry, concrete etc., if necessary,and mending good all damages including jointing pipes with Tyton joints as per manufacturer's specifications and filling up the trenches all complete but excluding the cost of masonry or concrete work, if required.Class B 100 mm nominal |
| 112 | 150 mm nominal |
| 113 | Supplying, fitting & fixing Centrifugally Cast (spun) iron (Hubless) double branch equal without door conforming to I.S. 15905 / 2011 including all joining materials but excluding coupling(i) 150 mm dia..-Y 45 D |
| 114 | Supplying, fitting & fixing Centrifugally Cast (spun) iron (Hubless) bend without door conforming to I.S. 15905 / 2011 including all joining materials but excluding coupling. 150 mm dia.- 88 degree |
| 115 | Supplying, fitting & fixing Centrifugally Cast (spun) iron vent cowl conforming to I.S. 15905 / 2011 including all joining materials but excluding coupling.150 mm dia. |
| 116 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m (ground floor) |
| 117 | 1st floor |
| 118 | 2nd floor |
| 119 | 3rd floor |
| 120 | Spot application for insecticides using Aqua base spray for pest (for bugs, cockroaches, silverfish, spider, termites, mosquitoes) to walls and ceiling etc. with chemical emulsion by admixing chloropyrofos emulsifiable concentrates (1% concentration) with water by weight including spraying the emulsified chemical @ 0.5 litres per sq.m. by a hand operated pressure pump on wall surfaces, ceiling, electrical fixture,electrical lines including drilling holes inplaces where source of termite is detected squirting chemical solution into the holes and sealing the holeswith cement grout. (Rate is per sq.m. of the floor area while actual work will be all walls ceiling, rack, partition and furniture). |
| 121 | Taking out existing partition/ceiling of particle board, masonite board, ply board, soft board etc. of any thickness and refixing same in new position with necessary clamps making holes in walls, floor, roof and mending damages if any.[concrete plaster will be paid separately]. 4th Floor.PVC false ceiling |
| 122 | Providing and fixing of false ceiling with powder coated exposed G.I. grid suspension system (E-Grid T 2430 or equivalent load carrying capacity with mid span deflection not exceeding 1/360 span with hanger spacing of 1200mm c/c ) consisting of Main Runner 3600 mm long, Cross Tee 1200 mm / 600 mm long and Wall Angle. The Wall Angle shall be fixed on PVC Dash Fasteners on the perimeter of the wall by steel screws with distance 300mm c/c. The Main Runners to be placed @ 1200 mm. The Cross Tee 1200mm will be inserted in the pre-cut slots of Main Runner at a regular interval of 600 mm to form a modular grid of 1200mm X 600mm. Additional Cross Tees of 600 mm shall be placed perpendicular to the Cross Tee 1200 mm long to finally form a grid of 600 mm X 600 mm. Grid of module size 600 mm X 600 mm shall be supported by 6 mm dia G.I. wire from purlins / soffit. 6 mm thick High Pressure Steam Cured Non Asbestos Fibre Cement Standard Ceiling Board (Density > 1300 Kg/m3) of size 595 mm X 595 mm, conforming IS 14862 & Type B Category III of ISO 8336, tested as per AS-1530 part 3 & BS-476 Part 4,5,6,7 & 8, should be placed in the Grid module to form a False Ceiling. All complete as per the drawing & directions of Engineer-in-charge. In ground floor.A) False Ceiling (with 6mm thick Fibre Cement Designer Board and E-Grid T-2430 |
| 123 | Sub-Total |
| 124 | GST @ 18% |
| 125 | Cess @ 1% Please Enable Macros to View BoQ information |