| 1 | Earth Work in Excavation by mechanical means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. |
| 2 | P/L in position Cement conc. 1 cement:5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm for foundation excluding the cost of centring & shuttering all work upto plinth level. |
| 4 | Dumping stones including casting stones in horizontal level. |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 6 | Centring & shuttering including strutting, propping etc. and removal of the formwork Columns, pillars, piers, abutments, posts and struts. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Lintel, beams, plinth beams, girders, bressumers and cantilevers. |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 10 | 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) |
| 11 | Finishing walls with water proofing cement paint of required shade onNew work (two or more coats applied @ 3.84 kg/10sqm) |
| 12 | Sand 01 Km by MT |
| 13 | Coarse Aggregates for 01 km by MT |
| 14 | Providing and Fixing Sign Board( granite or marbale) Plate Please Enable Macros to View BoQ information |