| 1 | Earth work in Foundation in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete. |
| 2 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. |
| 3 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. |
| 4 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. |
| 5 | Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. |
| 6 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. |
| 7 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete |
| 8 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. |
| 9 | S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. |
| 10 | S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete. |
| 11 | S/Laying Tarfelt in 2- layers for Bearing slab. i/c all cost of material, labour and T&P etc complete. |
| 12 | Earth work in filling for making approaches way, ,ramp in all type soil with all lead & lead i/c all cost of labours t&p etc. complete. |
| 13 | Providing & Laying 1st class Brick on edge soling 110 mm thick on Diversion & Ramp i/c all cost of material, labour and T&P etc complete. |
| 14 | C.C. ( M-20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. |
| 15 | Supplying and filling Coarse sand below c.c block including cost of all material, labour and T & P etc. |
| 16 | Supplying and filling Shingle(04-20 mm) below c.c block including cost of all material, labour and T&P |
| 17 | Supplying and filling Shingle(20-40 mm) below c.c block including cost of all material, labour and T&P Please Enable Macros to View BoQ information |