|
| 1 | Earthwork in Foundation in dry soil (Loam clay or sand)including lift upto 1.50 m and lead up to 30 M and including back filling ,watering and ramming of excavated earth into the Plinth with removal and disposal of surplus earth as directed by the Engineer -in- Charge up to distance of 30M from the Foundation trenches. |
| 2 | Providing and laying C.C 1:3:6 in foundation including all cost of material,labour and T&P etc. complete. |
| 3 | shuttering for P.C.C including all cost of labour and T&P etc for complete. |
| 4 | First class B/W in 1:4, cement coarse sand mortar I/c cost of material labour and T&P etc complete. |
| 5 | Struck deep pointing in 1:2 cement mortar including cost of all materail, labour, T&P etc complete. |
| 6 | shuttering for R.C.C including all cost of labour and T&P etc for complete. |
| 7 | Supplying and placing steel reinforcement for R.C.C work including all cost of material, labour a nd T&P etc.Complete. |
| 8 | Providing and laying C.CM-20 (1:1.5:3) in slope including all cost of material,labour and T&P etc. complete. |
| 9 | Laying R.C.C in M-20 (1:1.5:3) in slab including all cost of material labour and T&P complete. |
| 10 | S/L Course sand in filter i/c all cost of material labour and T&P complete. |
| 11 | S/L Shingle 4-20mm in filter i/c all cost of material labour and T&P complete. |
| 12 | S/L Shingle 20-40mm in filter i/c all cost of material labour and T&P complete. |
| 13 | S/L of three layer tarfelt painting including cost of all material, labour T&P complete. |
| 14 | Providing and fixing of 75 mm dia P.V.C. pipe cost of all material , labour T&P etc. complete for proper completion of work. |
| 15 | Making 25 mm thick expension joint including cost of all material , labour T&P etc. complete for proper completion of work. |
| 16 | Earth work in filling upto 600 m. lead for minor in all types of soil i/c cost of earth, ramming, dressing, labour, T&P, etc |
| 17 | Brick on edge paving I/c joints filled with sand including cost of all material labour T&P etc complete for proper completion of work. Please Enable Macros to View BoQ information |