Name of Work:- CIVIL WORK AT GSSS, JEEVANDESAR BLOCK SARDARSHAHAR
Sl. No.
Item Description
1
PART A CIVIL WORK
2
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
3
P.C.C. IN FOUNDATION Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8 (1 cement:4 Coarse sand :8 gradeed stone aggregate 40 mm nominal size).
4
Random Rubble stone masonry with hard stone in superstucture above plinth level and upto five level wall upto 30 cm and less thickness cement sand mortar 1:6 (1-Cement: 6- Sand)
5
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size).
6
Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand)
7
Brick work with Fly ash F.P.S. Bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1: 6 (1 cement : 6 coarse sand) Add extra for Square or Rectangular Pillars in Superstructre brick work up to five storeyUpto 45 cm length and all sides are free
8
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finished : 20 mm thick
9
Exterior Finishing: Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding.New work (Two or more coat applied @ 1.67 ltr/10 sqm overand including base coat of water proofing cement paint applied@ 2.20 kg/ 10 sqm ). Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.