|
| 1 | The work of Additional & Increasing capacity of 11/0.4 KV Sub-Stations Keeratsagar from 100 KVA T/F to 250 KVA (03 Nos), Additonal 250 KVA(03 Ns) & 100 KVA(03) TF installation of the same on the double pole structure/plinths at selected places etc. under BUSINESS PLAN SCHEME 2026-27 under EDD-I, MAHOBA, including carriage of all required material/Transformers from ESC/Workshop Mahoba to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | The work of Additional & Increasing capacity of 11/0.4 KV Sub-Stations Keeratsagar from 100 KVA T/F to 250 KVA (03 Nos), Additonal 250 KVA(03 Ns) & 100 KVA(03) TF installation of the same on the double pole structure/plinths at selected places etc. under BUSINESS PLAN SCHEME 2026-27 under EDD-I, MAHOBA, including carriage of all required material/Transformers from ESC/Workshop Mahoba to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- |
| 2 | Supply of following materials :- | Supply of following materials :- |
| 3 | I-Hook as per RESSPO manual. | I-Hook as per RESSPO manual. |
| 4 | Piercing Connector for 120 sqmm as per RESSPO manual. | Piercing Connector for 120 sqmm as per RESSPO manual. |
| 5 | Dead End Clamp as per RESSPO manual. | Dead End Clamp as per RESSPO manual. |
| 6 | LT Clamp as per RESSPO manual. | LT Clamp as per RESSPO manual. |
| 7 | Suspension Clamp as per RESSPO manual. | Suspension Clamp as per RESSPO manual. |
| 8 | Tailless unit 500A Including All Required Material Suitalble for 250 KVA Transformer (1+2 Set) as per RESSPO manual. | Tailless unit 500A Including All Required Material Suitalble for 250 KVA Transformer (1+2 Set) as per RESSPO manual. |
| 9 | LT Fuse Set SMC Box Protection Unit for 100 KVA TF as per RESSPO manual. | LT Fuse Set SMC Box Protection Unit for 100 KVA TF as per RESSPO manual. |
| 10 | Alluminium Lug long barrel off size240 sqmm as per RESSPO manual. | Alluminium Lug long barrel off size240 sqmm as per RESSPO manual. |
| 11 | Alluminium Lug long barrel off size120 sqmm as per RESSPO manual. | Alluminium Lug long barrel off size120 sqmm as per RESSPO manual. |
| 12 | Boots and Sleeves for (heat & Shrinkable) 250 KVA DTr for HT and LT Both Sides with All Material as per site Required | Boots and Sleeves for (heat & Shrinkable) 250 KVA DTr for HT and LT Both Sides with All Material as per site Required |
| 13 | EARTHING OF T/F BODY AND NEUTRAL (CHEMICAL) (1400002704) as per RESSPO manual. | EARTHING OF T/F BODY AND NEUTRAL (CHEMICAL) (1400002704) as per RESSPO manual. |
| 14 | 3 Phase D.O Fuse Set Polymer as per RESSPO manual. | 3 Phase D.O Fuse Set Polymer as per RESSPO manual. |
| 15 | Fuse Wire as per RESSPO manual. | Fuse Wire as per RESSPO manual. |
| 16 | Nut Bolt & Washer | Nut Bolt & Washer |
| 17 | 11 KV Danger Board with Clamp Nut Bolt including Barbed wire with Jumper as per RESSPO manual. | 11 KV Danger Board with Clamp Nut Bolt including Barbed wire with Jumper as per RESSPO manual. |
| 18 | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) |
| 19 | Earthing Complete - ( Earthing Rod , GI Wire 6 SWG) | Earthing Complete - ( Earthing Rod , GI Wire 6 SWG) |
| 20 | Holding Clamp for Top Chanel, TPMO & T-Off Chanel with Nut & Blot | Holding Clamp for Top Chanel, TPMO & T-Off Chanel with Nut & Blot |
| 21 | Erection/Instalation/Fixing of following :- | Erection/Instalation/Fixing of following :- |
| 22 | Cartage & Erection of PCC Pole 8.5 Mtr. Long as per RESSPO manual. (Provided by the Dept.) | Cartage & Erection of PCC Pole 8.5 Mtr. Long as per RESSPO manual. (Provided by the Dept.) |
| 23 | Fixing of I-Hook as per RESSPO manual. | Fixing of I-Hook as per RESSPO manual. |
| 24 | Fixing of Piercing Connector for 120 sqmm as per RESSPO manual. | Fixing of Piercing Connector for 120 sqmm as per RESSPO manual. |
| 25 | Fixing of Dead End Clamp as per RESSPO manual. | Fixing of Dead End Clamp as per RESSPO manual. |
| 26 | Fixing of LT Clamp as per RESSPO manual. | Fixing of LT Clamp as per RESSPO manual. |
| 27 | Fixing of Suspension Clamp as per RESSPO manual. | Fixing of Suspension Clamp as per RESSPO manual. |
| 28 | Fixing & Installtion of Tailless unit 500A Including All Required Material Suitalble for 250 KVA Transformer (1+2 Set) as per RESSPO manual. | Fixing & Installtion of Tailless unit 500A Including All Required Material Suitalble for 250 KVA Transformer (1+2 Set) as per RESSPO manual. |
| 29 | Fixing & Fitting of LT Fuse Set SMC Box Protection Unit for 100 KVA TF as per RESSPO manual. | Fixing & Fitting of LT Fuse Set SMC Box Protection Unit for 100 KVA TF as per RESSPO manual. |
| 30 | Fixing of Alluminium Lug long barrel off size 240 sqmm as per RESSPO manual. | Fixing of Alluminium Lug long barrel off size 240 sqmm as per RESSPO manual. |
| 31 | Fixing of Alluminium Lug long barrel off size 120 sqmm as per RESSPO manual. | Fixing of Alluminium Lug long barrel off size 120 sqmm as per RESSPO manual. |
| 32 | Fixing of Boots and Sleeves for (heat & Shrinkable) 250 KVA DTr for HT and LT Both Sides with All Material as per site Required | Fixing of Boots and Sleeves for (heat & Shrinkable) 250 KVA DTr for HT and LT Both Sides with All Material as per site Required |
| 33 | Fixing of EARTHING OF T/F BODY AND NEUTRAL (CHEMICAL) (1400002704) as per RESSPO manual. | Fixing of EARTHING OF T/F BODY AND NEUTRAL (CHEMICAL) (1400002704) as per RESSPO manual. |
| 34 | Fixing of 3 Phase D.O Fuse Set Polymerwith fitting of all accessories as per RESSPO manual. | Fixing of 3 Phase D.O Fuse Set Polymerwith fitting of all accessories as per RESSPO manual. |
| 35 | Fixing of Fuse Wire as per RESSPO manual. | Fixing of Fuse Wire as per RESSPO manual. |
| 36 | Fixing of Nut Bolt & Washer | Fixing of Nut Bolt & Washer |
| 37 | Fixing & Fitting of 11 KV Danger Board with Clamp Nut Bolt including Barbed wire with Jumper as per RESSPO manual. | Fixing & Fitting of 11 KV Danger Board with Clamp Nut Bolt including Barbed wire with Jumper as per RESSPO manual. |
| 38 | Fixing & Fitting of Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) | Fixing & Fitting of Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) |
| 39 | Fixing & Fitting of Earthing Complete - ( Earthing Rod , GI Wire 6 SWG) | Fixing & Fitting of Earthing Complete - ( Earthing Rod , GI Wire 6 SWG) |
| 40 | Fixing & Fitting of Holding Clamp for Top Chanel, TPMO & T-Off Chanel with Nut & Blot | Fixing & Fitting of Holding Clamp for Top Chanel, TPMO & T-Off Chanel with Nut & Blot |
| 41 | Fixing of Dropper Chanel 100X50X2028 (Dropper Chanel Provided by the Dept.) | Fixing of Dropper Chanel 100X50X2028 (Dropper Chanel Provided by the Dept.) |
| 42 | Fixing of Dropper Chanel Clamp 100X50X2028 (Dropper Chanel Clamp Provided by the Dept.) | Fixing of Dropper Chanel Clamp 100X50X2028 (Dropper Chanel Clamp Provided by the Dept.) |
| 43 | Fixing of T-Off Chanel with Clamp Nut as per RESSPO manual. (Provided by the Dept.) | Fixing of T-Off Chanel with Clamp Nut as per RESSPO manual. (Provided by the Dept.) |
| 44 | Fixing of M.S TF Base Angle 75X75X6X2028 mm with Clamp Nut & Bolt as per RESSPO manual. (Provided by the Dept.) | Fixing of M.S TF Base Angle 75X75X6X2028 mm with Clamp Nut & Bolt as per RESSPO manual. (Provided by the Dept.) |
| 45 | Fixing of Top Chanel (125X65X2240mm) with Clamp Nut & Bolt as per RESSPO manual. ( Provided by the Dept.) | Fixing of Top Chanel (125X65X2240mm) with Clamp Nut & Bolt as per RESSPO manual. ( Provided by the Dept.) |
| 46 | Fixing of 11 KV Polymer Disc Insulator (T&C) 45 KN (Provided by the Dept.) | Fixing of 11 KV Polymer Disc Insulator (T&C) 45 KN (Provided by the Dept.) |
| 47 | Fixing of Disc Fitting 45KN (T&C) (Provided by the Dept.) | Fixing of Disc Fitting 45KN (T&C) (Provided by the Dept.) |
| 48 | Fixing 11 KV Composite Polymer Pin (Provided by the Dept.) | Fixing 11 KV Composite Polymer Pin (Provided by the Dept.) |
| 49 | Laying, stringing ACSR Weasel Conductor (Provided by the Dept.) | Laying, stringing ACSR Weasel Conductor (Provided by the Dept.) |
| 50 | Fixing of Distribution Box 3 Phase (Provided by the Dept.) | Fixing of Distribution Box 3 Phase (Provided by the Dept.) |
| 51 | Fixing & Fitting of Distribution Box Clamp with Nut & Bolt (Provided by the Dept.) | Fixing & Fitting of Distribution Box Clamp with Nut & Bolt (Provided by the Dept.) |
| 52 | Laying, stringing, binding and Termination etc. of LT AB Cable 3x120+1x95+1x16 mm sq. on the newly erected Line as per direction of supervising engineer/RESSPO manual (A.B. CABLE Provided by the Dept.) | Laying, stringing, binding and Termination etc. of LT AB Cable 3x120+1x95+1x16 mm sq. on the newly erected Line as per direction of supervising engineer/RESSPO manual (A.B. CABLE Provided by the Dept.) |
| 53 | Laying, stringing, binding and termination etc. of LT PVC Cable of size 1x240 Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual. (LT PVC Cable Provided by the Dept.) | Laying, stringing, binding and termination etc. of LT PVC Cable of size 1x240 Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual. (LT PVC Cable Provided by the Dept.) |
| 54 | Laying, stringing, binding and termination etc. of LT PVC Cable of size 1x120 Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual. (LT PVC Cable Provided by the Dept.) | Laying, stringing, binding and termination etc. of LT PVC Cable of size 1x120 Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual. (LT PVC Cable Provided by the Dept.) |
| 55 | Safe cartage of 250 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging. (250 KVA TF Provided by the Dept.) | Safe cartage of 250 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging. (250 KVA TF Provided by the Dept.) |
| 56 | Installation/Erection/Commisioning of 250 KVA Transformers on the newly/old erected doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual. | Installation/Erection/Commisioning of 250 KVA Transformers on the newly/old erected doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual. |
| 57 | Safe cartage of 100 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging. (100 KVA TF Provided by the Dept.) | Safe cartage of 100 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging. (100 KVA TF Provided by the Dept.) |
| 58 | Installation/Erection/Commisioning of 100 KVA Transformers on the newly/old erected doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual. | Installation/Erection/Commisioning of 100 KVA Transformers on the newly/old erected doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual. |
| 59 | Safely dismentling/demounting of old existing 100 KVA T/F from Plinth/double pole structure after opening of all connections, earthing & fittings alongwith safely cartage of the same from work site to ESC/Workshop, including loading/unloading at vehicle and dragging safe side etc. | Safely dismentling/demounting of old existing 100 KVA T/F from Plinth/double pole structure after opening of all connections, earthing & fittings alongwith safely cartage of the same from work site to ESC/Workshop, including loading/unloading at vehicle and dragging safe side etc. |
| 60 | Fabrication of Hole for Dropper Chanel as per RESSPO manual. | Fabrication of Hole for Dropper Chanel as per RESSPO manual. |
| 61 | Fencing of Tranformer for T/F including of first class brick sand cement & Iron material etc. As per RESSPO manual (all material shall be arranged by contractor) | Fencing of Tranformer for T/F including of first class brick sand cement & Iron material etc. As per RESSPO manual (all material shall be arranged by contractor) |
| 62 | Construction of new T/F Plinth Size 4x4x5 Fit. including of first class brick sand cement etc. As per RESSPO manual (all Civil material shall be arranged by contractor) | Construction of new T/F Plinth Size 4x4x5 Fit. including of first class brick sand cement etc. As per RESSPO manual (all Civil material shall be arranged by contractor) |
| 63 | Concreting of Support PCC Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support PCC Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 64 | Note: Any quantity of item from sl no. 1 to sl no. 2.29 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.29 may vary to any limit within the financial value of agreement against this tender. |