| 1 | Safe carriage of the following Centralised material from any Store Centre of PVVNL/Baghpat/Baraut to work site /JE store with loading & unloading at both ends respectively. |
| 2 | PCC Pole 8.5 Mtr. |
| 3 | PCC Pole 11 Mtr Long |
| 4 | 11 KV Disc Insulator T&C type 4500kg. |
| 5 | 11 KV Disc fitting |
| 6 | 11 KV Pin insulator (Polymeric) with Nut |
| 7 | 11/0.4 KV T/F 100 KVA |
| 8 | 11 KV TPMO |
| 9 | 11 KV fuse Set |
| 10 | Stay set Complete 16x1800 |
| 11 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 12 | ABC cable 3x120+1x95+1x16 sq mm |
| 13 | 11 kv VCB Outgoing 400/200/5A 350 MVA |
| 14 | 11 kv VCB Incoming 600/300/5A 350 MVA |
| 15 | 33 kv VCB 800 A, 1250 MVA |
| 16 | 33 kv CT (400/200 /1 Amp.) |
| 17 | 33 KV Control Pannel for Double T/F |
| 18 | Contol Cable 4x2.5 sqmm |
| 19 | Contol Cable 2x2.5 sqmm |
| 20 | Line Isolator 800 A, 33KV |
| 21 | 33 kv CT (400/200 /1 Amp.) |
| 22 | 33 KV Lightning Arrestor |
| 23 | 33 KV PT O/D |
| 24 | Battrey Set |
| 25 | Battrey Charger |
| 26 | 11 KV \\"V\\" type cross arm 65*65*6mm, MS Angle |
| 27 | ACSR Rabbit Conductor |
| 28 | ACSR Weasel Conductor |
| 29 | GI Wire 6SWG |
| 30 | GI Wire 8SWG |
| 31 | Proper Installation/Fabrication/laying/fixing/binding etc. of the above and Following Centralised Material With proper connection including All the Accessories and complete work in all respect (as per resspo norms and site requirement) (All work in the Contractor Scope with Carriage of material to different work site including loading & unloading at both ends respectively). |
| 32 | Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 08.5 Mtr AND 9 MTR PCC POLE . |
| 33 | Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 11 Mtr. |
| 34 | Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information |
| 35 | Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information |