| 1 | CONSTRUCTION OF BARRICADING FOR PROPOSED GREEN AREA AT JASHPUR ROAD AND DC RESIDENCE ROAD JUNCTION NEAR PWD OFFICE AT WARD 15 UNDER NAGAR PARISHAD GUMLA |
| 2 | Labour for cleaning the worksite before and after work etc. |
| 3 | Earthwork in excavation trenches in ordinary soil (vide classification of soil item A) and disposal of excavated earth as obtained to a distance up to 50M including all lifts levellind ramming the foundation trenches ,removing roots of roots of tree shrubs all complete as per approved design ,building specification and direction of E/I. |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150mm with all lifts including cost of all materials ,labour,royality and taxes all complete as per building specification and direction of E/I (mod of measurement compacted volume). |
| 5 | Providing designation 75A one brick flate soling joint filled with local sand including cost of taxes watering royality all complete as per building specification and direction of E/I. |
| 6 | Providing P.C.C M -150 with nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size clean coarse sand of F.M -2.5 to 3 including screening shuttering mixing cement mixer & placing in position,vibrating ,stiking,curing,royalty and taxes all complete as per building specification and direction of E/I |
| 7 | providing and laying in position specified graded of reinforcement cement concrete excluding the cost of centring, shuttering, finishing and reinforcement --- all work up to plinth level 1:1.5:3 ( 1 cement:1.5 coarse sand (III): 3 Graded stone aggregate 20 mm nominal size) |
| 8 | providing and laying in position specified graded of reinforcement cement concrete excluding the cost of centring, shuttering, finishing and reinforcement --- all work up to plinth level 1:1.5:3 ( 1 cement:1.5 coarse sand (III): 3 Graded stone aggregate 20 mm nominal size) trepzoidal section |
| 9 | TOTAL |
| 10 | Reinforced concrete working beam , suspended floor,roofs having slope upto 15° landing, balcony,shelves,chajjas, lintels,bands,plain window sills, staircase and spiral staircase above plint level upto floor five level , excluding the cost of centering , shuttering, finishing and reinforcement,with (1:1.5:3) .( plinth beam) |
| 11 | Centering and shuttering including struting propping etc and removal of form for column |
| 12 | Centering and shuttering including struting propping etc and removal of form for lintel plinth beam |
| 13 | providing designation 75A brickwork in C.M (1:6) in superstructure -do- do - all complete job |
| 14 | TOTAL |
| 15 | providing tor steel reinforcement of 8 mm ,10 mm dia.Rods as per approved design drawing in all RCC work including cutting banding and placing the rod ---do--do -- all completed job. |
| 16 | total |
| 17 | 40%8mm dia rods |
| 18 | 30% 10 mm dia rods |
| 19 | 30% 12 mm dia rods |
| 20 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. |
| 21 | M.S. tube. (500MM@ 1 running ft) |
| 22 | Providing 12 mm thick cement plaster (1:4) in exposed surface or in approved quality of sand -do - do - all completed job |
| 23 | Supplying fitting and fixing M.S grill made of 20×60 mm M.S flat as per approved design and drawing , properly fabricated with joints continuous fillet welded and finished smooth,carriage of grill to work site . Hoisting as per buliding specification and direction of E/I. ( where materials is not supplied by the deptt.)(@ 4.5 kg / cft ) |
| 24 | Providing primer one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning removing rust dirt scales smoke and grease and cleaning the surface thoroughly including cost of scaffolding and taxes all complete as per building specification and direction of E/I |
| 25 | Providing two coat of snowcem of approved shade and make over a coat of cement primer new surface including preparing the plaster -- do --do all completed job. |
| 26 | CARRIAGE OF MATERIALS |
| 27 | sand( lead upto 20 km) |
| 28 | stone chips (lead upto 7 km) |
| 29 | steel( lead upto 1 km) |
| 30 | Cement ( lead upto 1 km) |
| 31 | Bricks( lead upto 8 km) |
| 32 | Electrical Work |
| 33 | 10/15W LED opal approved make LED post top made iun die cast aluminium housing with decorative clear /opal acrylic diffuser and IP65 protection IS:10322 part5/section 3 |
| 34 | Circuit/submain wiring in PVC Conduit:Wiring for circuit /submain wiring along with eart wire with the following size of FR PVC insulated copper conductor single core cable in surface / recessed PVC conduit as required |
| 35 | 2 x 1.5 sq mm + 1 x 1.5 sq mm earth wire |
| 36 | S/F rewirable double pole / TP&N Switch disconnector: Providing and fixing DP/TP&N Sheet metal switch disconnector fuse unit in the existing metal board with rewirable type fuse , including drilling holes on metal board. Making connection etc as required. |
| 37 | 32 amps, double pole |
| 38 | Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 volts, on surface/recess, complete with tinned copper bus bar, neutral bus bar, earth bar and din bar, interconnections, power painted including earthing etc as required. (but without MCB/RCCB/ISOLATOR) |
| 39 | 2 WAY single door |
| 40 | 16 amps ratings, DP, MCB, \\"C\\" Series , 10 KA breaking capacity. |
| 41 | 4.0 sq mm ISI Marked, PVC Insulated single aluminium conductor cable. |
| 42 | Add 18 % GST |
| 43 | Adding Labour Cess @ 1% of Estimated Cost |
| 44 | Add Silanyas/Udghatan & Sign Board Please Enable Macros to View BoQ information |