| 1 | Removing old grading plaster from roof slab, cleaning the surface, lowering and removing the debris within 50m lead etc. |
| 2 | Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead with all labour T&P etc complete. |
| 3 | Providing fitting and fixing up wall panelling made of OEL aluminum anodized section No.9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and section 4660 as Tapered clip & jointing angle No-1855 etc with BWR ply as per direction including cost of laminated board. |
| 4 | Providing, fitting, fixing up Aluminum door with anodized aluminum door section of 9202 as vertical member 9201 as top member & 9200 as bottom and middle member with frame section as 9221 with tappered clip No-4660 and the frame to be completed by means of jointing angle No-1855 including all cost of labour, T&P & hire charges of drilling machine etc. complete in cluding cost of laminated board. |
| 5 | Supplying, fitting & fixing 32mm thick flush door shutter with all labour iron fittings , wooden hinged cleat etc. fitted and fixed complete in all respect but including the cost of iron fittings including all stainless steel hardware fitting, cost & conveyance of all labours, materials, T&P etc Complete. |
| 6 | 2.5 cm thick grading concrete (1:2:2) on roof slab with 6 mm size hgcb chips including cost, conveyance, royality, taxes, watering& curing etc. complete. |
| 7 | Cement concrete (1:2:4) with 12mm size hg chips for R.C.C work including hosting and laying watering curing and cost of all labour T&P etc complete. |
| 8 | Fixing chequred tiles in floors,treads or steps and landings on 25 mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades includind cost for rubbing, polishing & cost of marbel tiles |
| 9 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. |
| 10 | Supplying fitting fixing of 100mm dia rain water pipe etc. including cost of all materials, labour, conveyance, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants etc.as per the direction of the Engineer in Charge. Please Enable Macros to View BoQ information |