| 1 | Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the EIC. 15 |
| 2 | Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work. 18 |
| 3 | PCC (1:3:6) with 40 mm size HG metal including all cost of materials, labour, conveyance, royalty, T&P, water for curing etc all complete. 37 |
| 4 | 25 mm AS flooring with PCC (1:2:4) including punning using 12 mm size CBHGC 122 |
| 5 | RCC work of M20 grade with 20 mm and down grade CBHGC including hosting and laying all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete. 57 |
| 6 | Requirement of HYSD/ MS rod and labour for cutting, bending,binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge. 62 |
| 7 | RCC foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc. 67 |
| 8 | Fly ash bricks 25 cm x 12 cm x 8 cm size having C/S > 75 kg/cm2 in CM (1:4) in foundation and plinth including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items of work. 92 |
| 9 | 16 mm thick cement plaster (1:6) over brick or stone masonry 180 |
| 10 | Priming one coat with wall cement primer water bound on plaster surface. 160 |
| 11 | Finishing walls with water proofing weather coat cement paint of approved make including cost of caffolding staging charges with cost of all materials taxes, labour T&P etc complete. 158 |
| 12 | Supplying, Fitting & Fixing of Precast Drain and slab including all taxes, labour T&P required |
| 13 | Supply fixing of 16 mm bolt Please Enable Macros to View BoQ information |