| 1 | Dismantling of AC/fibre/steel sheets and the like (corrugated / semi corrugated / plain) in roof covering incl ridge, hips, valley gutters etc complete all as specified and directed. |
| 2 | Dismantling of wrought iron or mild steel of any description and at any position not otherwise provided for complete all as specified and directed. |
| 3 | S&F for mild steel angle iron, cut to shape as directed, drilling holes, notching for wire as in wind ties for roof including securing bolts etc including all necessary cutting and welding for similar work upto any ht of bldg complete all as specified and directed. |
| 4 | S&F for rolled mild steel framed work as in doors or gates/rumblar/truss of angle or other section with gusset plate, rails, bracess etc, drilling for fixing of steel sheets or other covering including distance pieces work confirming to Fe-410-W (Gde -E-250) quality A complete all as specified and as directed. |
| 5 | S&F for pre-painted galvalume aluminium zinc coating GI based corrugated steel colour sheet of 0.50mm thick having tensile strength of 550 Mpa (150Gsm) as in roof covering/cladding to wall upto any ht of bldg, fixed with self tapping screws complete all as specified and as directed. |
| 6 | S&F for pre-painted galvalume aluminum zinc coating GI based Plain steel colour sheet of 0.50mm thick having tensile strength of 550 Mpa (150Gsm) as in roof covering ridge/velly gutturs upto any ht of bldg etc, fixed with self tapping screws complete all as specified and as directed. |
| 7 | M&L for Preparation of new iron or steel surfaces of any description, over 10cm in width or girth, when unconnected with other painting or when painted in a different tint and applying two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and as directed. |
| 8 | M&L for securing or easing with cleaning/greasing/oiling/ overhauling/welding in gear box, crank handle, rolling spring, channels, ball bearing, pully,Gate wheels, adjustment of lock device etc & any description complete including repair/maint of hangar door all as specified and directed.Note :- (a) Damages if any, caused due to poor workmanship shall be made good by the contractor at his own cost to match with the existing complete without any extra cost to the department. |
| 9 | Taking down existing door frame/ shutters of area exc 60 Sqm and n.exc 80 Sqm by hydraulic/ mechanical cranes, other tools & plant, necessary scaffolding required for lowering down the shutters carefully without causing damage to other components of hangars for repairing work and re-fixing the door shutters in same position after necessary repairs complete all as specified and as directed.Note :- (a) Damages if any, caused due to poor workmanship shall be made good by the contractor at his own cost to match with the existing complete without any extra cost to the department.(b) Spare parts shall be measured and paid seperately under relevant items |
| 10 | S&F for top / bottom wheel made up of taplon/ cast iron wheel including fixing only of ball bearings 02 Nos circlips, 01 No shaft of dia 25mmx120mm long or size as per required at site, including necessry welding, drilling and other fittings etc complete and all as specified and as directed. |
| 11 | S&F for Ball bearing roller of size 100x60mm or size as per site requirement complete all as specified and as directed.Make :- SKF or other equilant as approved by the GE. Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs) |
| 12 | S&F for Ball bearing roller of size 100x60mm or size as per site requirement complete all as specified and as directed.Make :- SKF or other equilant as approved by the GE. Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs) |
| 13 | Total amount of credit schedule 140798.0 Signature of contractor AGE (Contracts) For ACCEPTING OFFICER |