| 1 | Providing and laying of aluminium hanger structure made out of aluminium post, truss and fire proof trippal covering including dismantelling after programme is over with cost, conveyance etc complete in all respect as per specification and direction of Engineer-In-Charge. For 10 Days |
| 2 | Extra 7 days |
| 3 | Supplying and laying of velvet carpet on prepared floor of approved quality on hire basis including dismanteling after the programme is over with cost, conveyance taxes of all materials and cost of all labour, T&P required for the work etc complete in all respect as per specification and direction of Engineer-In-Charge. For 10 Days |
| 4 | Extra 7 days |
| 5 | Supplying, fitting and fixing of raised platform with batten and ply of approved quality including dismanteling after the programme is over with cost, conveyance taxes of all materials and cost of all labour, T&P required for the work etc complete in all respect as per specification and direction of Engineer-In-Charge. for 10 days |
| 6 | Extra 7 days |
| 7 | Providing and laying of garden mat (Green Carpet) in position on hire basis with cost, conveyance taxes of all materials and cost of all labour, T&P required for the work etc complete in all respect as per specification and direction of Engineer-In-Charge. For 10 days |
| 8 | Extra 7 days |
| 9 | Earthwork excavation of foundation in ordinary soil including levelling & dressing the bed up to the required depth & removing the excavated earth & depositing the same away from the work site within initial lead of 50 mtr & initial lift of 1.5 mtr, including cost, conveyance of all materials, labour T&P articles required for the work including shoring, shuttering, propping & dewatering if required, etc. complete in all respect as per the specification & direction of the Engineer-in-Charge. |
| 10 | Supplying and filling in foundation trenches and plinth with sand well watered and rammed in layers not exceeding 23cm in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. |
| 11 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors with 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc complete as per the direction of the Engineer -in -charge. |
| 12 | Cement concrete (1:2:4) with 12mm. size hard granite chips of approved quality including watering, curring, centring and shuttering, cost, conveyance, royalty and taxes of all materials, labour, T&P required for the work etc. complete as directed by the Engineer-in-charge. |
| 13 | Flyash brick masonry in cement mortar of mix (1:6) with cement and screened & washed sand for mortar after immersing the bricks in water before use in foundation and plinth/ Superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as direction by the Engineer-in-charge. |
| 14 | Supply & fitting fixing of indian class 4 110 mm dia rigid PVC pipe including cost, conveyance, T&P etc complete as per direction of Engineer-in-charge |
| 15 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) and finished smooth to the rough surface of brick masonry walls after racking out joints including watering and curing rounding of corners etc. complete with cost, conveyance, royalties and taxes of all materials, cost of all labour, T&P, sundries and scaffolding required for the work etc. complete in all respect with providing grooves as directed by the Engineer in charge. |
| 16 | Providing 12 mm. thick cement plaster with neat cement punning in all floors at all height with cement mortar of mix (1:4) with ordinary Portland cement (OPC) and with screened and washed sharp sand for mortar and finished smooth to the rough surface of brick masonry walls after racking out joints including watering and curing rounding of corners etc. complete with cost, conveyance, royalties and taxes of all materials, cost of all labour, T&P, sundries and scaffolding required for the work etc. complete in all respect with providing grooves as directed by the Engineer in charge. |
| 17 | Providing fitting, fixing water proof Tarpoline in roof & walling of approved quality etc. complete as directed by the Engineer -in -charge. |
| 18 | R.C.C. work of M.20 in Roof slab using 12 mm size crushed stone granite aggregates including hoisting lowering, laying concrete and compacting by using vibrators, watering, curing and necessary centring and shuttering for smoth finishing of work excluding steel reinforcement work including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer -in-charge. |
| 19 | Straightening cutting, bending & binding of bent up or coiled rods confirming to I.S. 432 for Plain and 1785 for Tor steel and binding, tying the grills, hoisting, lowering and placing in proper position including cost, conveyance and taxes of all materials and cost of all labour with all T&P required for the work etc. complete as directed by the Engineer- in-Charge. |
| 20 | Providing 2.5 cm (1 inch) thick A.S. flooring with C.C. (1:2:4) laid to proper slope by using 12 mm size black hard broken granite stone chips of approved quality and from approved quarry including punning, watering and curing for 28 days with cost, conveyance, royalties & taxes of all materials, cost of all labour, T&P required for the work complete in all respect as directed by the Engineer-in-charge. |
| 21 | Providing tent house with cloth celling& walling with bamboo frame covered with Cloth ceiling, Cloth walling with other requisits and dismantling the same after end. |
| 22 | Hire Charges for Rest 16 Day |
| 23 | Supply fitting fixing of Indian PAN |
| 24 | Providing fitting & fixing of syphonic P Trap |
| 25 | Providing fitting & fixing of CP Short body bipcock |
| 26 | Providing fitting & fixing of 1'' dia PVC Pipe |
| 27 | Providing tent for officials with bamboo frame coveered with tarpolines and cloth ceeling, cloth walling with other requisits and dismentalling the same after end of the event and as per the direction of the Engineer-in-Charge. |
| 28 | Providng and laying quarry dust sub base in layer not exceeding 100 mm thick including compacting and watering with PRR including cost and conveyance of sub base materials, hire and running charges of HRR, labour, T&P required for the work as per specification and direction of Engineer-in Charge |
| 29 | Supply of 2 nos bed sheet, 1 no pillow with cover & 1 gadi per person for Police Personal. |
| 30 | Laundry Facility for Police Personal. |
| 31 | Hire charges of 35 KVA Silent type Truck Mounted D.G Set nos.(2 Nos shed x17 days) |
| 32 | Hire charges of 100 watt flod Light (1 Nos shedx 90 Nos. x 17 days) Fittings including all connections light complete with all accessories and connection . All electrical wiring shall be carried out through PVC flexible conduit pipes, and all joints/connections shall be properly insulated to ensure safety and reliability. |
| 33 | Hire charges of Ceiling Fan /wall fan (1 Nos shed x96 Nos. x 17 days) including all connection. All electrical wiring shall be carried out through PVC flexible conduit pipes, and all joints/connections shall be properly insulated to ensure safety and reliability |
| 34 | Hire charges of tube light 20watt (1 Nos shed x60 Nos. x 17 days) including all connection. All electrical wiring shall be carried out through PVC flexible conduit pipes, and all joints/connections shall be properly insulated to ensure safety and reliability |
| 35 | Hire charges of Air Cooler (1 Nos shed x12 Nos. x 17 days).All electrical wiring shall be carried out through PVC flexible conduit pipes, and all joints/connections shall be properly insulated to ensure safety and reliability. |
| 36 | Hire charges of Air circulating Fan/ stand fan (1 Nos shed x51 Nos. x 17 days) including all connection. All electrical wiring shall be carried out through PVC flexible conduit pipes, and all joints/connections shall be properly insulated to ensure safety and reliability |
| 37 | Fuel charges for 1 Nos. DG Set |
| 38 | Hire charges of 1 Nos. Pannel Board ( The panel board shall be equipped with suitable protection devices such as MCCBs, RCCBs, and other necessary protective components to ensure safe and reliable operation) |
| 39 | Hire charges of Temporary chemical earthing with all accessories for structure and panel ( Include UL Listed maintenance free ,Low carbon coppercoated earth rod of 3 metre electrode having diameter of 17.2 mm with copper coating thickness of 250micron tested as per IEC 62561-2) and Earth conductivity enhancing mineral compound shall be of 25 kg/pit |
| 40 | Hire charges of Temporary Galvanised Steel Flat 30X3 mm thickness from earth electrode directly in ground as required. Flat conductor Hot Dipped Galvanized.This material shall be used for establishing a proper earthing connection, duly welded to the structure, between the metallic structure and the earth rod to ensure electrical safety. |
| 41 | Hire charges of separate 5 Amp Plug point box (1*200 Nos. x 17 days) |
| 42 | Temporary connection charges (approxmately) TPCODL Charges |
| 43 | Electrical inspection charges aprox |
| 44 | Hire charges for temporary lightening protection device for safty |
| 45 | Provision of High Skilled labour as D.G.Set Operator and Electrician (1x17 days x(3 person/day) |
| 46 | Provision of unskilled Skilled labour as D.G.Set helper and electrical helper(1x 17 days x(3 person/day) Please Enable Macros to View BoQ information |