| 1 | Scrapping out old paints from wall with scrapper, sand papering, washing with soap or soda water including scaffolding charges etc. complete in all respect as per specification & direction of Engineer-in-Charge. (upto 5.00mtr height) |
| 2 | Dismantling & removing old damaged lime or cement plaster from walls including racking out joints and removing the debris away from work site within 50m. lead etc. complete as per direction of the Engineer-in-charge. (Ground floor to 6th floor) |
| 3 | Providing 12mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to out side smooth surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge. (i)Ground floor |
| 4 | (ii)First floor |
| 5 | (iii)Second floor |
| 6 | (iv)Third floor |
| 7 | (v)4th floor |
| 8 | (vi)5th floor |
| 9 | (vii)6th floor |
| 10 | Painting two coats with fungal resistance weather seal coat of approved shade over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge. (i)Ground floor |
| 11 | (ii)First floor |
| 12 | (iii)Second floor |
| 13 | (iv)Third floor |
| 14 | (v)4th floor |
| 15 | (vi)5th floor |
| 16 | (vii)6th floor |
| 17 | Painting two coats with approved synthetic enamel paints of approved colour, shade to old/new wood & iron work over a coat of wood/ red oxide primer including cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. (i)Ground floor |
| 18 | (ii)First floor |
| 19 | (iii)Second floor |
| 20 | (iv)Third floor |
| 21 | (v)4th floor |
| 22 | (vi)5th floor |
| 23 | (vii)6th floor |
| 24 | Supplying, fitting & fixing of 6” Dia P.V.C Rain Water down Pipes including cost, conveyances, taxes of all Materials, cost of all labour & T&P etc. required for the work etc. complete in all respect as per specification & direction of the Engineer-in-charge. |
| 25 | Supplying, fitting & fixing of 5mm thick plain glass of approved quality & colour including fixing the same in position with required hardware & putty with cost, conveyances, taxes of materials, cost of labour, T&P etc. complete in all respect as per specification and direction of Engineer-in-charge. |
| 26 | Supplying labour for cutting and uprooting the vegetation growth, materials, shifting and clearance of debris from the building including cost of labour, T&P etc complete as per direction of Engineer in charge. Un skilled Mulia Please Enable Macros to View BoQ information |