| 1 | NON-CENTRALIZED MATERIAL (SUPPLY) |
| 2 | Holding clamp SP-55 with N&B |
| 3 | Bracing Clamp Bottom SP-55 with N/B |
| 4 | Bracing Clamp Top with N&B SP-55 |
| 5 | Stay clamp for SP-55 with N&B |
| 6 | 11 KV IPC for covered to covered conductor. |
| 7 | 11 KV IPC for covered to bare conductor. |
| 8 | 11 KV MID Span Jointing kit |
| 9 | IPC with Al. Bail for Earthing 11 KV |
| 10 | 11 KV Sus.Ties/Cable Ties on Pin Insulater |
| 11 | 11 KV AAAC Covered Conductor AL-59, 99 Sq. mm |
| 12 | 11 KV Tension clamp with Bail & IPC |
| 13 | LABOUR PART (WORK) |
| 14 | Erection of Earthing Rod |
| 15 | Fabrication of steel |
| 16 | Excavation of pit for stay set |
| 17 | Erection of 11 KV Stay Set |
| 18 | Grouting of stay set |
| 19 | Excavation of pit for Pole |
| 20 | Erection of Single SP-55 Pole |
| 21 | Erection of Double SP-55 Pole |
| 22 | Grouting of Pole |
| 23 | Cartage SP-55 Pole, 71-100 Km |
| 24 | Cartage of petty material, 71-100 Km |
| 25 | Headload Cartage SP-55 Pole (1-3 Km) |
| 26 | Headload Cartage of Material (1-3 Km) |
| 27 | Back Cartage of Petty material, 151-200 KM |
| 28 | Fixing of IPC with Al. Bail for earthing |
| 29 | Fixing of 11 KV 90 KN Tension clamp B&IPC |
| 30 | Fixing of 11 KV Suspension Ties |
| 31 | Fixing of 11 KV MID Span Jointing Kit |
| 32 | Back Head Load Cartage of Petty material, 1-3 KM |
| 33 | Fixing of 11 KV IPC for covered-covered |
| 34 | Fixing of 11 KV IPC covered to Bare Conductor |
| 35 | Laying spreading, Stringing AAAC Conductor |
| 36 | Removing Old conductor By opening jumper Please Enable Macros to View BoQ information |