| 1 | NON-CENTRALIZED MATERIAL (SUPPLY) |
| 2 | LT Clamp with N&B ST Pole SP-23 |
| 3 | Earth wire clamp for SP-23 with N&B |
| 4 | MS Clamp with N&B For Distribution Box |
| 5 | Dead End Clamp For AB Cable |
| 6 | Stay Insulator |
| 7 | Piercing Connector for 95 Sq.mm-120 Sq.mm |
| 8 | J Hook for AB Cable |
| 9 | Stay Clamp with N&B |
| 10 | PG Clamp |
| 11 | LT AB Cable 3x50+1x35+1x16 Sq.MM |
| 12 | LT Distrubiton box 3 Phase |
| 13 | LABOUR PART (WORK) |
| 14 | Erection of Earthing Rod |
| 15 | Excavation of pit for stay set |
| 16 | Erection of LT stay set |
| 17 | Grouting of Stay set |
| 18 | Excavation of pit for Pole |
| 19 | Erection of Single SP-23 Pole |
| 20 | Grouting of Pole |
| 21 | Muffing of Pole |
| 22 | Dismantling of LT line 3 P 4 W (WEASEL) |
| 23 | Painting of SP-21/23 Pole |
| 24 | Const.Inst. Of Danger Board/Number Plate |
| 25 | Cartage SP-21/23 Pole, 101-150 KM |
| 26 | Cartage of petty material, 101-150 Km |
| 27 | Headload Cartage SP-21/23 pole (0-1 Km) |
| 28 | Headload Cartage of material (0-1 Km) |
| 29 | Installation of LT Dist Box (1 Ph & 3 Ph) |
| 30 | Laying of LT XLPE ABC 3x120 + 1x95 + 1x16 Sq.mm |
| 31 | Dismantl LT XLPE ABC 3x120 + 1x95 + 1x16 Sq.mm |
| 32 | Disconnection & Reconnection of Consumer |
| 33 | Back Cartage of Petty Material 0-20 Km |
| 34 | Fixing of Suspension Clamp with I Hook |
| 35 | Erection of Dead end Clamp |
| 36 | Back Head Load Cartage of Petty Materal 0-1 Km |
| 37 | Laying of LT AB Cable 3Cx50 + 1x35 Sq.mm |
| 38 | Fixing of Piercing connector 50-25 Sq.mm |
| 39 | Fixing of PG Clamp 70-25 Sq.mm Please Enable Macros to View BoQ information |