| 1 | Earth work excavation for foundation in all soils and sub-soils and to the required depth as may be directed except in hard rock requiring blasting (Including Refilling)(a) 0 to 2m depth |
| 2 | Supplying and filling in Foundation and Basement with Filling Crushed stone sand in layers of 150mm thickness w |
| 3 | Plain Cement Concrete 1:5:10 with Admixture for foundation using 40mm gauge hard broken stone jelly |
| 4 | Plain cement concrete 1:8:16 for foundation and other similar works using 20mm gauge broken brick jelly |
| 5 | Brick work in Cement Mortar 1:5 using kiln burnt country bricks of size 8 3/4\\"X4 1/4\\" X 2 3/4\\" (22x11x7cm) with Admixture in Foundation and Basement |
| 6 | Brick Partition wall in Cement Mortor 1:4 with Admixture 110mm thick for super structure in the following floors using kiln burnt country bricks of size 8¾”x4¼”x2¾” (22x11x7cm) (b) For Ground Floor |
| 7 | Finishing the top of flooring in CM 1:4 with Admixture 20mm thick including surface rendered smooth |
| 8 | Supplying and fixing of Fibre Mixed Precast Slab of 50mm Thick of all required shapes made in cement concrete 1:3:6 with Admixture using 20mm hard broken stone jelly |
| 9 | Supplying and fixing of Precast cement concrete slab for cupboard/ward robes shelves, cover slab for chambers, baffle walls side slabs of boxing around windows and other similar works in Standardized Cement Concrete Mix M-20 Grade ii) 40mm thick(a) In Foundation and basement |
| 10 | Painting the Old Iron work with Two Coats and other similar works such as PVC/ASTM pipes, Kerb stone and grills with approved First class synthetic enamel paint including thorough scrapping etc |
| 11 | Providing and laying in position, Standardized concrete Mix M20 Grade in accordance with IS 456-2000 using 20mm and downgraded hard broken stone jelly for all RCC works (a) In Foundation and Basement |
| 12 | Supplying, fabricating and placing in position of Mild steel Grills/Ribbed Tor Steels (Without Cement Slurry) for reinforcement for all floors |
| 13 | White washing Two coats for existing surface using clean slacked shell lime |
| 14 | Removing the existing doors and windows shutter and refixing with 2 Nos of Door handle with CP screws 6\\", new 3 Nos 5\\" Alu butt hinges , 2 Nos of 6\\" x 1/2\\"Tower bolt ,1 No. of 10\\" x 5/8\\" Aldrop |
| 15 | Providing Form work and centering for reinforced cement concrete works including supports and strutting upto 3.30m height for plain surfaces (b) Plain surfaces such as Roof slab, Floor slab, Beams Lintels, Loft, Sill slab, Staircase waist, Portico slab and other similar works. |
| 16 | Supplying and filling in Foundation and Basement with Gravel in layers of 150mm thickness |
| 17 | Providing Two legged Scaffolding using 15Cm dia casurina props using country wood planks 40mm thick (a)5.50m height in addition of 2.5m height. |
| 18 | Plastering with C.M. 1:4 with Admixture 12mm thick finished with neat cement |
| 19 | Cleaning the Existing Water Closet using Acid with neat finishing |
| 20 | Supplying,Laying and fixing of following dia PVC Pipes of best approved ISI quality in Below Ground Level (a) 40mm dia PVC Pipe |
| 21 | Terrace water proofing work: The existing pressed tiles surface to cleaning water wash using with wire brush, the tiles joints are rack out using machine without damaging the existing structure |
| 22 | Plain Cement Concrete 1:2:4 with Admixture using 20mm gauge hard broken stone jelly |
| 23 | Dewatering and cleaninng the sludge from septic tank using required skilled labour Please Enable Macros to View BoQ information |