| 1 | Appendix I -Parakuzhy . Pettichal and Retainig wall |
| 2 | OD107/2026-2027:Putting up ring bund to a bottom width of 3m, top width of 1m, height of 2m and side slopes1/2:1 by driving down half split coconut posts 3m long to a depth of 1.5m below ground level at 0.75 C/C in two rowsand fixing 1/4th split coconut wailing pieces in 3 rows and connecting the posts with 1/4th split cross ties, bambooreepers for tying, screening and filling inside with clay maintain the bund till the completion of the work and removingthe same after etc. complete (Boat load upto 3 km) |
| 3 | OD109/2026-2027:Modified old 60.2.3 Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water withengine and pump set above 5HP and up to 10HP, including conveyance to siteand erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 4 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 5 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 6 | OD105/2026-2027:Modified old data 60.64.1 Coconut Pile - Supplying and stacking well matured straight coconut post fordriving down throug various strata bellow bed level including cost coveyancelabour charges etc complete |
| 7 | OD106/2026-2027:Modified old 60.64.4 Coconut Pile - Driving down coconut pile to lines and levels through variuosstrata including all hire charges and labour for fixing , staging platform and allother appliances necessary for pile driving down after pointing the bottom end Details for one post of 8m long |
| 8 | OD113/2026-2027:Modified old 60.7.2 DR PACKING Under foundation - Dry stone packing under foundation with goodquality blasted rubble including conveyance of material and labour charges etc.complete as per direction of departmental officers at site. |
| 9 | OD108/2026-2027:Modified Data 60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site(Boat load up to 3km) |
| 10 | OD111/2026-2027:Modified Data 4.1.5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 11 | OD110/2026-2027:Modified Data 4.1.8Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) Boat load upto 3km |
| 12 | OD104/2026-2027:Modified Data 5.1.3Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)Boat load upto 3km |
| 13 | OD114/2026-2027:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more with minimu boat load |
| 14 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 15 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 16 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 17 | OD112/2026-2027:Modified olf 50.2.26.1<br>Filling using excavated earth (excluding rock) in open areas in layers notexceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up Please Enable Macros to View BoQ information |