| 1 | Earth work in excavation in foundation in all kinds of soil including hard moorum, stoney earth mixed with boulders with all leads and lifts including dressing and levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost, cess of all labour and T & P and dewatering if required for the work etc. complete and as directed by the engineer-in-charge. |
| 2 | Supplying, filling in foundation & plinth with sand in 23.5 cm. thick layers including watering and ramming with the cost conveyance royalties, taxes of the materials, cess and labour with T & P required for the work etc. complete (Measurement will be taken on finished compacted section only.) |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4 cm size clean hard black broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm thick to the required level ramming, watering and curing etc. complete including cost, cess and conveyance of all materials with all taxes and royalties and all labour with T & P required for the work etc. complete. |
| 4 | Fly Ash brick Masonary work in cement mortar (1:6) after immersing brick for six hours in water before use in foundation with good quality of C.B brick of 23cm x 11cm x 8cm size having crushing strength not less than35Kg. Per Cm2 Including splays cutting, circular moulding and similar such type of work with necessary projections chamfering curbelling including watering and curing etc. complete including cost, conveyance, royality, taxes, cess of all materials and all labour T&P required for the work complete as per specification and direction of the Engineer-in-charge. Foundation |
| 5 | Fly Ash brick Masonary work in cement mortar (1:6) after immersing brick for six hours in water before use in foundation with good quality of C.B brick of 23cm x 11cm x 8cm size having crushing strength not less than35Kg. Per Cm2 Including splays cutting, circular moulding and similar such type of work with necessary projections chamfering curbelling including watering and curing etc. complete including cost, conveyance, royality, taxes, cess of all materials and all labour T&P required for the work complete as per specification and direction of the Engineer-in-charge. Sub-Structure |
| 6 | R.C.C. work with M-20 grade In Different Works having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position. Coloumn Base & Footing |
| 7 | R.C.C. work with M-20 grade In Different Works having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position. Plinth Beam |
| 8 | R.C.C. work with M-20 grade In Different Works having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position. Coloumn & Beam |
| 9 | R.C.C. work with M-20 grade In Different Works having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position. Lintel |
| 10 | R.C.C. work with M-20 grade In Different Works having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position. Roof Slab |
| 11 | Straightening cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S. rods or tor confirming to I.S. 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C. works including cost, conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour with all T&P required for the work etc. complete as directed by the Engineer- in-Charge. |
| 12 | 12mm thick cement plaster (1:6) finished smooth to inside smooth surface of brick walls after raking out the joints including watering and curing with the cost and conveyance of all materials, Royalty, cess and labour with T&P required for the work as directed by the EIC. |
| 13 | 16mm thick cement plaster (1:6) finished smooth to inside smooth surface of brick walls after raking out the joints including watering and curing with the cost and conveyance of all materials, Royalty, cess and labour with T&P required for the work as directed by the EIC. |
| 14 | 20 mm thick grading plaster in C.M. (1:4) over roof slab including watering and curing with the cost and conveyance of all materials, Royalty, cess and labour with T&P required for the work as directed by the EIC. |
| 15 | 20 mm thick cement plaster in c.m. (1:6) over stone work including watering and curing with the cost and conveyance of all materials, Royalty, cess and labour with T&P required for the work as directed by the EIC. |
| 16 | Supplying fitting, fixing ,vetrified tiles in floors of size 600mm x 600 mm of approved make with 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of all materials,Labour T&P etc required for the work . |
| 17 | Distempering two-coats to walls with distemper of approved shade on old work to give an even shade including all cost, conveyance, labour, T&P, Cess etc., required for the work complete including cess as directed by the E.I.C. |
| 18 | Finishing plastered surface of walls with Acrylic wall putty (Water Based of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes labour T & P etc complete. |
| 19 | Finishing wall with two coats of weather coat approved shade on new work two coats, over a coat of priming, to give an even shade with cost, conveyance, taxes of all the materials required for the work and labour, T&P and cess etc. complete in all respe |
| 20 | Painting two-coats with any approved enamel paint over one coat primer including all cost, conveyance,tax, cess of all materials, labour, T&P etc., required for the work as per direction of the Engineer-in-charge. |
| 21 | Supplying, fitting & fixing of M.S. wondow grils and MS gates as per aprroved design for door / window including all cess, cost of materials as per direction of the Engineer-in-charge. |
| 22 | Providing and laying factory made chafered edge cement concrete paver block of required strength, thickness& size/ shape ,made by table vibratory method to attain superior ,smooth finish using PU or equivalent moulds , laid in required drey colour & pattern over 50mm thick compacted bed of coarse sand ,compacting and proper embeding / laying of inter locking paver block into the sand bedding layer through vibratory compaction by using plate vibrator , filling the joints with sand and cutting of paver block as per required size and pattern , finishing and sweeping extra sand in footpath parks, lawns, drive aways or light traffic parking, etc. complete as per manufactures specification and direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |