| 1 | Dismantling brick or stone masonry in lime or cement mortar under 3 Mtr. height including stacking the useful materials for resuse and removing the debries away from work site with all leads, lifts and delifts etc. complete as per direction of Engineer-in-charge. |
| 2 | Dismantling and removing door, window and venilators including removing of frame, hinges, fastening and stacking the same for reuse and removing the debries away from work site with all leads, lifts and delifts etc. complete as per direction of Engineer-in-charge |
| 3 | R.C.C. (1:1 ½: 3) for RCC works using 12mm. hard granite crusher broken chips of approved quality free from weathered skin and flakes including hoisting, laying and compacting the concrete to required thickness including proper watering, curing to required period with cost of all materials, conveyance, royality and cost of labours, T&P etc.complete as per direction of Engineer-in-charge. |
| 4 | Supplying, cutting, bending, binding of uncoated HYSD bar straightening and tying grills and placing in position including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 5 | Rigid smooth centering and shuttering for C.C. works including false work and dismanteling the same after casting including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. (i) Column & Beam |
| 6 | (ii) Roof slab |
| 7 | Brick work with Fly Ash brick in masonary (1:6) in superstructure using brick of size (23 x 11 x 8cm) having crushing strength not less than 75 kg/cm2 with dimensional tolerance ± 8% including watering, curing to required period with cost of all materials, conveyance, royalty and cost of labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 8 | 12mm. thick cement plaster in C.M. (1 : 6 ) over brick masonary work including racking out joints and watering, curing to required period with cost of all materials, conveyance, royality and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 9 | 6 mm thick cement plaster in (1:4) to R.C.C. surfaces finished smooth including closed deep chiping and slury treatment and watering, curing to required period with cost of all materials, conveyance, royalty and cost of all labour T & P etc complete and as per direction of the Engineer-In-Charge. |
| 10 | Labour charges for closed deep chipping and cleaning of flooring including cost of all labour and T&P etc. complete as per direction of Engineer-in-charge. |
| 11 | Supplying, fitting and fixing vitrified tiles in floor of size 600mm x 600mm of approved make confirming to IS: 13755 laid on 20mm thick cement mortor (1:4) 1 cement, 4 sand and filling joints with white cements of approved quality including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 12 | Providing, fitting and fixing of false ceiling with aluminium anodized T-Section No.3215 with 2'-0\\" centre to centre L-Section No.1705 upto 15 micron on 4 walls to be fixed by means of steel screw and P.V.C. Plug and the aluminium grid 2'-0\\" x 2'-0\\" suspended from ceiling including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 13 | Providing & fixing of wall panelling made out of Aluminium section B 9835 as Horizontal and vertical member placed @ 600mm c/c covered with 19mm thick BWR block board final surface to be claded with veener as per requirment necessery screw / nails, hardware fittings all labour material finishing complete as per design with cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 14 | Providing & fixing of Double Glazed Unit (DGU) toughened glass door/window by using two numbers 6mm thick clear toughened glass panes separated by 8-12mm gap filled with air or inert/argon gas spacer for better acoustic comfort including enhanced thermal insulation, noise reduction, condensation control and UV protection furnish with UPVC frame by using premium fittings like-Godrej/Dorset/ or similar type premium unilite package including cover and locking arrangements using H- type handle 300mm with cut out & hole including the cost of all materials hardware fittings and cost of all labour, conveyance, loading & unloading, T&P etc. complete as per the direction of Engineer-In-Charge of the work. |
| 15 | Supplying, fitting & fixing of toughened glazing glass partition made out of DGU toughened glass by using two numbers 6mm thick clear toughened glass panes separated by 8-12mm gap filled with air or inert/argon gas spacer for better acoustic comfort including enhanced thermal insulation, noise reduction, condensation control and UV protection furnish with 50mm X 50mm powder coated glazing aluminium section by using premium fittings like- Godrej/Dorset/ or similar type premium unilite package including cover and locking arrangements using premium powder coated handle 300mm with cut out & hole including the cost of all materials hardware fittings and cost of all labour, conveyance loading & unloading, T&P etc. complete as per the direction of Engineer-In-Charge of the work. |
| 16 | Supplying and fixing of Roller blinds by fixing powder coated top channel, bottom channel with bottom end cap, control unit and good quality of 0.60mm thick fabric of approved design and quality including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 17 | Providing, fitting and laying of laminated wood floor of approved make and shade laid over a layer of 6mm thick foam with proper locking including cost of all materials, conveyance and cost of all labour etc. completed as per direction of Engineer-in-charge. |
| 18 | Providing fitting and fixing up partition walling aluminum anodized section No. 9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and section 4660 as Tapered clip and joining angle No. 1855 including cost of all materials, conveyance and cost of all labour etc.complete and as per the direction of Engineer-In-Charge. |
| 19 | Finishing wall surface with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, conveyance and cost of labour T&P etc. complete as per direction of Engineer-in-charge. |
| 20 | Priming one coat with any approved primer including cost of all materials, conveyance and cost of all labours and T&P required for the work etc. complete as per direction of Engineer-in-charge. |
| 21 | Wall Painting two coats with plastic emulsion paint of approved shade on new exposed wall surface iincluding cost of all materials, conveyance and cost of all labours, T&P required for the work etc. complete as per direction of Engineer-in-charge. |
| 22 | Providing & supplying for Sofa set 3-2-2 |
| 23 | Providing & supplying for Bed with Box |
| 24 | Providing & supplying for Center Table |
| 25 | Supply and installation of Hitachi 2.00 / 1.80 Ton split type AC machine, Stabilizer and copper pipe including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 26 | Provision preparation and installation of POP made high relief mural painting on the theme of sambalpur with fitting and fixing as per the design and photographs approved by the client including all labour and materials at site with cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. |
| 27 | Dismantling and removing of wall panelling including removal of debris from work site with all lead, lifts and delifts including cost of all labour etc. complete and as per direction of Engineer-in-charge. |
| 28 | Electrification & Light arrangements (with fitting and fixing including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge.) Please Enable Macros to View BoQ information |