| 1 | Earth work excavation in o/s i/c 1.50m lift and 30m lead S.I.No.251 |
| 2 | Providing and laying cement concret in 1:4:8 (1 cement, 4 coarse sand, 8 gradet stone aggregate 40mm nominal size) & curring cumplete including cost of form work in foundation floor. As pr DSR sl no. 4.1 |
| 3 | Brick work in 1:4 cement and sand morter in foundation & plinth including supply of all materials, lebour & t&p etc. proper cumplition of work. As pr DSR sl no. 6.1 |
| 4 | 12MM Thick plaster in 1:4 with cement and fine sand morter in all comp of work As per DSR S.I.No 13.1 |
| 5 | R.C.C work providing and laying in position specified grade of reinforced cement concret including the cost of centring, shuttring, finishing & excluding reinforcement All work upto plinth level 1:1.5:3 with stone aggregate 20mm Nominal size As per DSR S.I.No 5.1 |
| 6 | Steel reinforcement for R.C.C work including straightening,cutting, bending,placing in position and binding all complete As per DSR S.I.No 5.1 |
| 7 | Providing and laying cement concret in 1:2:4 (1 cement, 2 coarse sand,4 gradet stone aggregate 20mm nominal size) & curring cumplete including cost of form work in foundation floor. As pr DSR sl no. 4.1 |
| 8 | S/L of 40mm Brick Ballast i/c all charge |
| 9 | S/L of 20mm Greded stone grit i/c all charge |
| 10 | S/L of Coarse sand i/c all charge |
| 11 | Nylon Mesh |
| 12 | Providing and fixing 110 MM PVC pipe conforming to IS make working pressure 4 kg/sqcm inculding testing labour T&P and all complete fittings SI. No 43 |
| 13 | Shifting of Drilling Machine |
| 14 | 200 mm dia Drilling i/c all charge |
| 15 | S/L of 150 mm dia 6kgf /cm PVC Sloted pipei/c all charge |
| 16 | Lowring of 150 mm Dia 6kgf /cm PVC Sloted pipei/c all charge |
| 17 | S/L of 150 mm Dia 6kgf /cm PVC End cap i/c all charge |
| 18 | Supply of Solvent cement i/c all charge |
| 19 | Supply of 110 mm 6kgf/cmP.V.C Bend i/c all charge |
| 20 | Supply of 110 mm 6kgf/cmP.V.C T i/c all charge |
| 21 | Iron Clamp 110MM |
| 22 | Fastnar |
| 23 | Pea Gravel (2-4mm) filling arround the pipe |
| 24 | Wall painting with slogan for awareness purpose/ information board |
| 25 | C.I.B |
| 26 | Photo Graph |
| 27 | L.I.D Cover Please Enable Macros to View BoQ information |