|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. |
| 2 | All kinds of soil |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 5 | 1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 6 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 8 | Foundations, footings, bases of columns, etc. for mass concrete |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. |
| 10 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. |
| 12 | In cement mortar |
| 13 | Providing and fixing precast RCC column of size 200X 200X 2400 mm of design mix M35 grade in H section and with provision of 10mm & 8mm dia bar jali with grooves on both sides incuding transportation and fixing at site in proper alignment/ level in vertical as well as horizontal direction by suitable metods as per site condition ensuring proper strength in order to hold planks complete as per direction of Engineer in Charge (Note :- Before procuring the material M35 desigm mix certificate and reinforcement provided shall be obtained from the manufacurere ) |
| 14 | Providing and fixing precast RCC Plank of size 1800X300X 70mm of design mix M 35 and with provision of 8mm & 6 mm dia bar jali including transportation of material in existing groove of existing RCC H groove column in proper alignment ensuring proper horizontal aligment for whole boundary wall complete as per direction of Engineer in Charge. (Note :- Before procuring the material M35 desigm mix certificate and reinforcement provided shall be obtained from the manufacurere ) |
| 15 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. |
| 16 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. Please Enable Macros to View BoQ information |