| 1 | Single under reamed pile foundation with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel.Single under ream pile |
| 2 | Earthwork in all kinds of soil etc complete in all respect. |
| 3 | Supplying & filling foundation and plinth with screened and washed sand well watered and rammed including cost, cost of all labour, carriage, royalty, etc complete. |
| 4 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. |
| 5 | R.C.C M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour complete but excluding cost of reinforcement complete. |
| 6 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. |
| 7 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismentling then after casting including cost of all materials etc completed . |
| 8 | Brick work with Fly ash Bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage and royalty of all materials, cost of all labour, etc complete. |
| 9 | 12mm thick C.P.(1:6) on brick masonary to the smooth surface including watering, curing, cost, carriage, royalty of all materials, cost of all labour, etc complete as per the direction of E.I.C. |
| 10 | Wall painting two coats with weather coat over a coat of wall cement primer etc complete with all cost . |
| 11 | Supplying hosting jiost & Trusses and placing including all cost |
| 12 | Supply of Colour Sheeting |
| 13 | Cost of Electrification and grass pitching |
| 14 | Display board & photograph |
| 15 | Sub Total |
| 16 | GST 18% of Sub-Total Please Enable Macros to View BoQ information |