| 1 | HVAC WORKContractor shall submit Design and Drawings of Central Air-Conditioning System suitable for 24 Hrs hospital operation complete comprising of heat load calculations, size of pipe, size of AC duct, AHU, LT Panel, control cable, LT switch gear etc and of all the items as catered under serial Item no 2 to 101 here -in-after, which shall be dully vetted by IIT/NIT by the contractor before the same is approved by the Accepting Officer. All the AHUs installed shall be either floor mounted or ceiling suspended as applicable. Contractor will be responsible for performance guarantee of complete AC plant. AHRI Certified selection sheet for both AHRI Conditions & below mentioned parameters shall be submitted by the contractor duly vetted by the OEM. Design Parameters shall be as under:-(a) Inside room Temperature - 21°C ± 3°C(b) Relative Humidity - 55% (±5%). (c) ACH not less than 25 - For OTs only & ACH not less than 12 for balance area(d) Minimum positive pressure to be maintained 2.5 Pascal. - For OTs only(k) Time required to achieve design condition after switching on plant shall not exceed 45 minutes.(l) Air conditioning zoning of complete area shall be as per corresponding zonal requirement as per designThe design and drawings of central air-conditioning system should be energy-efficient and economically viable as per the site conditions and cooling/heating requirements as elaborated. The contractor shall consider the following while submitting the design. A. Preliminary survey and data collection: (i) Visit site and study architectural, structural and electrical drawings. (ii) Assess building usage, occupancy, internal loads and ambient conditions. (iii) Identify constraints for routing refrigerant pipes, drain pipes, fresh air ducts and electrical cables. B Heat Load Calculations:- (i) Perform room-wise and system-level heat load calculations as per ISHRAE/ASHRE/NABH/NBC/ECBC ( In case of overlapping parameters among various codes, superior parameter shall be adopted) (ii) Consider building envelope, solar load, internal loads, fresh air load. (iii) Provide cooling and heating load calculations for each zone. C. System Design & Equipment Selection (i) Design the entire central air-conditioning system with following components- (a) Chilled water system (b) Hot water generator (c) Plant automization and optimization controller (d) Cooling tower (e) Condenser water pump, Primary chilled water pump, secondary chilled water pump & Hot water pump (f) Air handling unit & FCU |
| 2 | D. Refrigerant piping & Drainage Design (i) Prepare complete refrigerant piping layout with pipes sizes, line lengths ,height difference etc (ii) Ensure compliance with manufacturer limits (iii) Prepare drain piping layout with slope gravity/pumped system, insulation details E. Fresh Air & Ventilation System Design (i) Calculate fresh air requirement as per ISHRAE/ASHRE/NABH/SOA Armed forces Hospital (2003)/NBC/ECBC . (ii) Design treated fresh Air Unit (TFA)/ERV/HRV as required. (iii) Provide duct routing, sizing, filtration specs and integration details with central air-conditioning system.F. Electrical System Design (i) Estimate connected load and operating load. (ii) Prepare SLDs, wiring diagrams for power & control cables. (iii) Specify breaker ratings, DB sizes, cable sizes and earthing requirement. G. Control System & BMS Integration (i) Recommend central controller architecture. (ii) Provide BMS integration protocol (Modbus/BACnet) (iii) prepare control diagrams and point lists. H. The contractor shall submit the following drawings & Documentation:- (i) Heat load summary (ii) Indoor-outdoor piping layout. (iii) Schematic diagrams. (iv) Fresh air duct layouts (v) Electrical SLD and control diagrams. (vi) Equipment layout drawings. (vii) Provide drawings in AutoCAD/Revit format. j. Standards & Codes : All design shall comply with the following: (i) ISHRAE Guidelines (ii) ASHRAE Standards (iii) National Buildings Code of India NBC 2016 (amended upto date). (iv) Relevant IS codes for electrical, insulation, refrigerant safety. (v) OEM-specific central air-conditioning system design guidelines.(vi) SOA Armed forces Hospital (2003) (vii)National electrical code 2023(viii) Energy conservation building code (ECBC) 2017 |
| 3 | CHILLED WATER SYSTEMSupply, installation, testing and commissioning of of EUROVENT/AHRI certified water cooled Screw Chiller of 225 TR actual capacity complete with semi hermetically sealed, screw type compressor, shell and tube condenser and flooded type Evaporator with nitrile rubber insulation, all mounted on steel frame as per OEM specifications, motor shall be of high efficiency suitable for 415+10% Volts, 50Hz, 3 phase AC supply, microprocessor based control panel, BMS connectivity provision, including oil separators, pressure relief devices, filter drier, moisture indicators and factory charge of both refrigerant 134a & compressor oil, control safeties and diagnostics display, refrigerant piping, mounting base frame etc. complete as per the specifications and as per following parameters :-Operation Parameters:-(a)Chilled water temperature In - 54.0 F(b)Chilled water temperature Out - 44.0 F (c) Evaporator Fouling Factor - 0.0005 FPS(d) Condenser water temperature In - 90.0 F (e)Condenser water temperature Out - 97.5 F (f) Condenser Fouling Factor - 0.001 FPS(g) pressure drop on evaporator side- less than 8 mtr(h)pressure drop on condenser side- less than 7 mtr(j) The Chiler shall meet the COP and Indian seasonal Energy Efficiency Ratio(ISEER) requirement corresponding to 5 star rating as per GOI notification No 3924 and ECSBC 2024; Max NPLV (Non standard part load value) - 0.38 KW/TR & Max 0.65 KW/TR as above mentioned parameter / conditions.(k)Screw type compressor in semi hermatic construction, complete with automatic stepless type capacity control, safety switches, forced feed lubrication system etc, as per specifications.(l)Lubrication device consisting of automatic electric oil pump, oil cooler, head tank, oil strainer, automatic pressure regulating valve, oil heater, thermal switch etc. as per specifications. |
| 4 | (m) Refrigerant piping fittings, valves, level sensing electronic expansion valves and accessories to inter connect compressor, condenser, chiller and electronic expansion valve.(n) Microprocessor based control panel comprising of Controls including sensors, factory manufactured and tested. All Control function including start up and shut down leaving chilled water temperature Control, Compressor and Electronic Expansion Valve modulation, anti recycle logic automatic Compressor and load limiting. It shall also be equipped with the following protection and monitoring devices.(i) High (Condenser) & Low (Evaporator) pressure protection.(ii) Low oil level & pressure protection.(iii) Chilled/Condenser Water flow loss.(iv) Chiller Water Freeze protection.(v) Sensor error protection.(vi) Motor load control and overload.(vii) High motor temperature protection.(viii) High oil temperature protection.(ix) Chiller inlet and outlet Water temperature.(x) Condenser inlet / Outlet water temperature.(xi) Suction and discharge Compressor pressure.(x) Microprocessor based control panel shall have suitable hardware & software as per OEM so that it can be integrated directly with standard communication open protocol using backnet / Modbus as well as open IP. (xi) DP switches at inlet and outlet of condenser & chiller, water drain & air purge valves, cable termination box, as required.(xii) suction line and chiller insulation with minimum 19 mm thick polyvinyl nitrile rubber insulation.(xiii) frame work for mounting the above condenser, chiller, compressor and motor with base plate complete with antivibration pads/ springs as per OEM design.(xiv) Initial/ first charge of refrigerant gas & compressor oil duly charged at factory.(xv) RCC/Cement concrete foundation for equipment as per OEM design. SCHEDULE OF CREDIT Notes:-(a) The items and quantities given under in the respective columns are provisional; however, the rates inserted for credit are firm. The recovery for the credit shall be made for the actual quantities ordered and retrieved from the demolition/dismantling /taking down under respective items of BOQ. Contractor shall be permitted to remove the materials indicated in this credit schedule only after affecting the recovery for the same from the RAR/Final bill as applicable and after written permission is obtained by the contractor from the Engineer-in-Charge. (b) Tenderers are advised to visit the site to ascertain the worth value, prevailing conditions of the existing materials for which credit is to be afforded. No claim whatsoever on account of above shall however be entertained at any stage whether the contractor (s) inspected the site or not. (c) The old materials obtained will not be allowed to be re-used in the work unless it is specifically mentioned in the description of relevant items of BOQ. All other serviceable/ salvage value materials obtained from the site other than those considered in this schedule shall be Govt. property and contrator’s quoted rates shall be deemed inclusive of removing such material to MES store yard of the Engineer-in-Charge, who will take such material on charge. In case of the dispute related to the interpretation of the provision with regard to the credit schedule, the decision of the Accepting Officer shall be final & binding. Sl No DESCRIPTION OF ITEM A/U QTY RATE AMOUNT REMARK |
| 5 | (m) Refrigerant piping fittings, valves, level sensing electronic expansion valves and accessories to inter connect compressor, condenser, chiller and electronic expansion valve.(n) Microprocessor based control panel comprising of Controls including sensors, factory manufactured and tested. All Control function including start up and shut down leaving chilled water temperature Control, Compressor and Electronic Expansion Valve modulation, anti recycle logic automatic Compressor and load limiting. It shall also be equipped with the following protection and monitoring devices.(i) High (Condenser) & Low (Evaporator) pressure protection.(ii) Low oil level & pressure protection.(iii) Chilled/Condenser Water flow loss.(iv) Chiller Water Freeze protection.(v) Sensor error protection.(vi) Motor load control and overload.(vii) High motor temperature protection.(viii) High oil temperature protection.(ix) Chiller inlet and outlet Water temperature.(x) Condenser inlet / Outlet water temperature.(xi) Suction and discharge Compressor pressure.(x) Microprocessor based control panel shall have suitable hardware & software as per OEM so that it can be integrated directly with standard communication open protocol using backnet / Modbus as well as open IP. (xi) DP switches at inlet and outlet of condenser & chiller, water drain & air purge valves, cable termination box, as required.(xii) suction line and chiller insulation with minimum 19 mm thick polyvinyl nitrile rubber insulation.(xiii) frame work for mounting the above condenser, chiller, compressor and motor with base plate complete with antivibration pads/ springs as per OEM design.(xiv) Initial/ first charge of refrigerant gas & compressor oil duly charged at factory.(xv) RCC/Cement concrete foundation for equipment as per OEM design. SCHEDULE OF CREDIT Notes:-(a) The items and quantities given under in the respective columns are provisional; however, the rates inserted for credit are firm. The recovery for the credit shall be made for the actual quantities ordered and retrieved from the demolition/dismantling /taking down under respective items of BOQ. Contractor shall be permitted to remove the materials indicated in this credit schedule only after affecting the recovery for the same from the RAR/Final bill as applicable and after written permission is obtained by the contractor from the Engineer-in-Charge. (b) Tenderers are advised to visit the site to ascertain the worth value, prevailing conditions of the existing materials for which credit is to be afforded. No claim whatsoever on account of above shall however be entertained at any stage whether the contractor (s) inspected the site or not. (c) The old materials obtained will not be allowed to be re-used in the work unless it is specifically mentioned in the description of relevant items of BOQ. All other serviceable/ salvage value materials obtained from the site other than those considered in this schedule shall be Govt. property and contrator’s quoted rates shall be deemed inclusive of removing such material to MES store yard of the Engineer-in-Charge, who will take such material on charge. In case of the dispute related to the interpretation of the provision with regard to the credit schedule, the decision of the Accepting Officer shall be final & binding. Sl No DESCRIPTION OF ITEM A/U QTY RATE AMOUNT REMARK |
| 6 | 2.0 Building works |
| 7 | Old unserviceable chowkat or frame with shutter not exceeding 1.5 sqm each including iron mongaries |
| 8 | Old unserviceable chowkat or frame with shutter exceeding 1.5 sqm but not exceeding 4 sqm each including iron mongaries |
| 9 | Old unserviceable false ceiling with frame |
| 10 | Old scrap iron |
| 11 | Old unserviceable GI tube of 15mm |
| 12 | Old unserviceable bib tap, pillar tap, stop cock |
| 13 | Old unserviceable flushing cistern |
| 14 | Old unserviceable looking mirror |
| 15 | Old unserviceable PVC drain pipe of any size and description |
| 16 | Old unserviceable CI floor/nahani trap 75mm dia |
| 17 | Old unserviceable health faucet |
| 18 | Old Retrived Brick bats |
| 19 | Old U/S Rolling shutter |
| 20 | Old AC sheet |
| 21 | Old Syntex tank 1000 ltr HVAC SYSTEM |
| 22 | Old unserviceable GI earth plate of any size/make |
| 23 | Old unserviceable copper scrap obtained from Copper earthing and copper strips External Water Supply 0.0 |
| 24 | Old Unserviceable Sluice valve 200 mm |
| 25 | OldUnserviceable gate valve 50 mm |
| 26 | Old Unserviceable gate valve 40 mm |
| 27 | Old Unserviceable GI pipe 50 mm |
| 28 | Old Unserviceable GI pipe 40 mm Internal Electrification |
| 29 | Old unserviceable point wiring incl all accessories switches, sockets, fan regulator, ceiling rose, baten holder, bell etc complete. |
| 30 | Old unserviceable light fittings of any size/make. |
| 31 | Old unserviceable SPN DB's of any size/make |
| 32 | Old unserviceable TPN DB's of any size/make |
| 33 | Old unserviceable MCB's of any make/size. |
| 34 | Old unserviceable sub main wiring incl. battens/conduits etc. of any size EXTERNAL ELECTRIC SUPPLY |
| 35 | Old unserviceable LT UG cable of size 500 sqmm 3.5 core |
| 36 | Old unserviceable GI pipe 100 mm TOTAL 309555.0 Please Enable Macros to View BoQ information |