| 1 | Safe carriage of following Centralised materials from Store centre Kunera Etawah or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of dragging as per site requirement, jumphering of Transformer with 11 KV line through LT ABC cable. Weasal conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. | Safe carriage of following Centralised materials from Store centre Kunera Etawah or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of dragging as per site requirement, jumphering of Transformer with 11 KV line through LT ABC cable. Weasal conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. |
| 2 | PCC Pole 8.5 Mtr. | PCC Pole 8.5 Mtr. |
| 3 | LT ABC (3x50+1x70+1x16) Sq. mm | LT ABC (3x50+1x70+1x16) Sq. mm |
| 4 | Three Phase Distribution Box | Three Phase Distribution Box |
| 5 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 6 | 11 KV Disc Insulator T&C type 4500kg. | 11 KV Disc Insulator T&C type 4500kg. |
| 7 | 11 KV Disc fitting | 11 KV Disc fitting |
| 8 | 11/0.4 KV T/F 25 KVA | 11/0.4 KV T/F 25 KVA |
| 9 | 11 KV TPMO | 11 KV TPMO |
| 10 | 11 KV fuse Set | 11 KV fuse Set |
| 11 | LT PVC Cable 3.5x70/35 sq mm | LT PVC Cable 3.5x70/35 sq mm |
| 12 | Stay Clamp | Stay Clamp |
| 13 | Stay Wire (4.0 MM,) 7/8 SWG (GSS Wire) | Stay Wire (4.0 MM,) 7/8 SWG (GSS Wire) |
| 14 | Stay Rod | Stay Rod |
| 15 | G.I. Wire 4MM 8 SWG | G.I. Wire 4MM 8 SWG |
| 16 | Earthing Rod | Earthing Rod |
| 17 | De-Centralised Materials will be Supplied & Erected by Firm including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | De-Centralised Materials will be Supplied & Erected by Firm including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 18 | MS Channel (Dropper) 100x50x2028mm (for fuse set) | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 19 | Stone pad 300x300x75mm | Stone pad 300x300x75mm |
| 20 | Suspension Clamp | Suspension Clamp |
| 21 | Three Phase Distribution Box Clamp | Three Phase Distribution Box Clamp |
| 22 | Eye-Hook | Eye-Hook |
| 23 | PG Clamps | PG Clamps |
| 24 | Dead End Clamp | Dead End Clamp |
| 25 | PVC Connector/Cabil Connector | PVC Connector/Cabil Connector |
| 26 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 27 | MS angle 75x75x6x2028mm with clamp & bolt and nut (T/F base) | MS angle 75x75x6x2028mm with clamp & bolt and nut (T/F base) |
| 28 | MS Top channel (125x65x2240mm) | MS Top channel (125x65x2240mm) |
| 29 | MS Channel 125x65x1300mm (T-off) | MS Channel 125x65x1300mm (T-off) |
| 30 | Nut Bolt and washer all sizes | Nut Bolt and washer all sizes |
| 31 | LT Fuse Set Protection Unit for 25 Kva DT with SMC Box | LT Fuse Set Protection Unit for 25 Kva DT with SMC Box |
| 32 | Danger baord Barbed wire including jumper | Danger baord Barbed wire including jumper |
| 33 | Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESPO Schedule. It including the cost of all labour, T&P etc. | Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESPO Schedule. It including the cost of all labour, T&P etc. |
| 34 | Errection of PCC 8.5 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of PCC 8.5 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 35 | Grouting, Concreting and plinting of Single support on Pole with cement, coarse sand & stone ballast as per RESPO norms. | Grouting, Concreting and plinting of Single support on Pole with cement, coarse sand & stone ballast as per RESPO norms. |
| 36 | Laying, sagging and stringing and jumpering /binding of ACSR Weasel Conductor as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of ACSR Weasel Conductor as per RESPO manual and as per direction of Executive engineer |
| 37 | Laying, sagging and stringing and jumpering /binding of LT ABC (3x50+1x70+1x16) Sq. mm as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of LT ABC (3x50+1x70+1x16) Sq. mm as per RESPO manual and as per direction of Executive engineer |
| 38 | Laying, sagging and stringing and jumpering /binding of LT PVC Cable 3.5x70/35 sq mm as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of LT PVC Cable 3.5x70/35 sq mm as per RESPO manual and as per direction of Executive engineer |
| 39 | Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. | Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. |
| 40 | Back Carriage of Old 10 KVA Transformer recived from Pit Site to Store Center, Kunera, Etawah. | Back Carriage of Old 10 KVA Transformer recived from Pit Site to Store Center, Kunera, Etawah. |
| 41 | Back Carriage of Old 16 KVA Transformer recived from Pit Site to Store Center, Kunera, Etawah. | Back Carriage of Old 16 KVA Transformer recived from Pit Site to Store Center, Kunera, Etawah. |