| 1 | Carriage of Following Centralised Materials from Store Center Kunera Etawah to site of work including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Carriage of Following Centralised Materials from Store Center Kunera Etawah to site of work including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 2 | PCC Pole 8.5 Mtr. | PCC Pole 8.5 Mtr. |
| 3 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 4 | LT ABC (3x120+1x95+1x16) sq.mm | LT ABC (3x120+1x95+1x16) sq.mm |
| 5 | Three Phase Distribution Box | Three Phase Distribution Box |
| 6 | 11/0.4 KV T/F 250 KVA | 11/0.4 KV T/F 250 KVA |
| 7 | 11 KV TPMO | 11 KV TPMO |
| 8 | 11 KV DO fuse Set | 11 KV DO fuse Set |
| 9 | LT PVC Cable Al 1x400 sq mm | LT PVC Cable Al 1x400 sq mm |
| 10 | G.I. Wire 4MM 8 SWG | G.I. Wire 4MM 8 SWG |
| 11 | Earthing Rod | Earthing Rod |
| 12 | De-Centralised Materials will be Supplied & Erected by Firm including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | De-Centralised Materials will be Supplied & Erected by Firm including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 13 | Stone pad 300x300x75mm | Stone pad 300x300x75mm |
| 14 | Suspension Clamp | Suspension Clamp |
| 15 | Three Phase Distribution Box Clamp | Three Phase Distribution Box Clamp |
| 16 | Eye-Hook | Eye-Hook |
| 17 | PG Clamps | PG Clamps |
| 18 | Dead End Clamp | Dead End Clamp |
| 19 | Piercing Connector/Cable Connector | Piercing Connector/Cable Connector |
| 20 | Clamps for LT T-off with bolts & Nuts | Clamps for LT T-off with bolts & Nuts |
| 21 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 22 | Al Lug long barrel off size (LS) | Al Lug long barrel off size (LS) |
| 23 | Henley Type Tailless Unit Protection Cubical Pannel 500A, 650 V, For 250 KVA DT | Henley Type Tailless Unit Protection Cubical Pannel 500A, 650 V, For 250 KVA DT |
| 24 | Copper L-piece 50x225x10mm (LS) | Copper L-piece 50x225x10mm (LS) |
| 25 | Copper L-piece 62x225x12 mm (LS) | Copper L-piece 62x225x12 mm (LS) |
| 26 | Danger baord Barbed wire including jumper | Danger baord Barbed wire including jumper |
| 27 | Nut Bolt and washer all sizes | Nut Bolt and washer all sizes |
| 28 | Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESPO Schedule. It including the cost of all labour, T&P etc. | Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESPO Schedule. It including the cost of all labour, T&P etc. |
| 29 | Errection of PCC 8.5 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of PCC 8.5 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 30 | Grouting, Concreting and plinting of Single support on STP pole with cement, coarse sand & stone ballast as per RESPO norms. | Grouting, Concreting and plinting of Single support on STP pole with cement, coarse sand & stone ballast as per RESPO norms. |
| 31 | Laying, sagging and stringing and jumpering /binding of ACSR Weasel Conductor as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of ACSR Weasel Conductor as per RESPO manual and as per direction of Executive engineer |
| 32 | Laying, sagging and stringing and jumpering /binding of LT ABC (3x120+1x95+1x16) sq.mm as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of LT ABC (3x120+1x95+1x16) sq.mm as per RESPO manual and as per direction of Executive engineer |
| 33 | Laying, sagging and stringing and jumpering /binding of LT PVC Cable Al 1x400 sq mm as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of LT PVC Cable Al 1x400 sq mm as per RESPO manual and as per direction of Executive engineer |
| 34 | Construction of T/F plinth for 250 KVA of size 2x2x1.5 m on a padding 0.25M deep in ground 1:5:10 cement, sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr hight & 0.35 mtr wall will be constructed as per Norms. | Construction of T/F plinth for 250 KVA of size 2x2x1.5 m on a padding 0.25M deep in ground 1:5:10 cement, sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr hight & 0.35 mtr wall will be constructed as per Norms. |
| 35 | Mounting of 250 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. | Mounting of 250 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. |
| 36 | Pipe Earthing 60 feet Of 250 KVA Transformer as per Norms. | Pipe Earthing 60 feet Of 250 KVA Transformer as per Norms. |
| 37 | Fancing of 250 KVA Transformer Complete. | Fancing of 250 KVA Transformer Complete. |
| 38 | Back Carriage of Old 100 KVA Transformer recived from Pit Site to Store Center, Kunera, Etawah. | Back Carriage of Old 100 KVA Transformer recived from Pit Site to Store Center, Kunera, Etawah. |