|
| 1 | M&L for Vitrified (selected quality) Ceramic tiles 8 to10 mm thick (square/ rectangular) polished including selective/dark colour motiff, area of each tiles exceeding 0.42 sqm but not exceeding 1.00 sqm over & including 15mm thick Screed bed or bedding layer in Cement Mortar 1:6 for laying floor finishes or chemical adhesive pating, set and jointed in neat cement slurry and pointed in white or coloured cement to match dismantling existing tile and removing the debris outside the defence land complete all as specified and as directed.Make:Orient ceramic/Sunflora Vertified /Kajaria etc. |
| 2 | Supply and fixing high quality decorative wall panelling using Charcoal panels 12 to 16mm thick solid, including necessary framework/back support, adhesives, edge finishing, cutting, alignment, and complete installation as per approved design and site requirements. The scope includes supply of all materials, accessories, hardware, transportation, tools, labour and incl taking down existing wall paneling required for a complete finished installation. Make : Mega Star/ ARISO Charcoal Wall Panels/ Euro Pratik or equivalent. |
| 3 | Taking down old aluminium door/window area exc 4.00 Sqm not exc 8.00 sqm complete all as specified and as directed by Engr-in-Charge. |
| 4 | S&F for Powder coated aluminium (minimum thickness of powder coating 50 micron) work for doors, windows, ventilators and partitions frames (Fixed portions)of any dark/wooden colour with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing/ paneling, C.P. brass/ stainless steel screws. all complete as per architectural drawings and the directions of Engineer-in-Charge. Make:Jindal/ Saint Govind/ Ozone. |
| 5 | Hacking out old broken glass (any thickness, size, quality or description) from wooden frames,aluminium frame, steel frame or stone, concrete or brick surrounds, glazed with putty or fixed with beads complete all as specified and as directed. |
| 6 | Supply and fix 10mm thick toughened glass, fixed to frame/shutter for Aluminium door/window/partition etc including aluminium powder coated snap beading and rubber gasket, complete all as specified and directed. Make : Glass: Saint Govind/ Ozone/ Modiguard. |
| 7 | Supply and fix 8mm thick toughened glass, fixed to frame/shutter for Aluminium door/window/partition etc including aluminium powder coated snap beading and rubber gasket, complete all as specified and directed. Make : Glass: Saint Govind/ Ozone/ Modiguard. |
| 8 | Material and labour, installing a fixed and openable frameless glass door system incl 10 mm thick toughened glass with etched panels without aluminium framing, including patch fittings, floor spring, hinges, handles, locking arrangement, necessary hardware, silicone sealant, cutting, alignment, testing, and complete installation as per approved design and site conditions and complete all as per Manufacturer instructions. The scope includes supply of all materials, accessories, transportation, tools, labour and taking down old existing door and finish the wall surface/floor surface smooth to fixed the new door to required for the complete finished work. Make : Glass: Godrej/ Saint Gobain/ Ozone/ Modiguard/ Dormakaba, complete all as specified and as directed. |
| 9 | Supply and fixing 3 to 4 mm thick ACP (Aluminium Composite Panel) sheet cladding at window and door edges in the foyer area to enhance the overall aesthetic appearance and achieve an elegant finish, including necessary framework, adhesives, edge bending, cutting, groove finishing, fixing accessories, sealant, and complete installation as per approved design and site conditions. The scope includes the supply of all materials, transportation, tools, consumables, and labour required for the complete finished work. (Colour of ACP approved by GE). Make : VIVA Composite Panel or equivalent approved by any Command / ADG. |
| 10 | S&F openable glass (5mm thick) doors with aluminium frame (Min 3mm thick) including aluminium sections & glass, toughened/tinted/frosted glass panels, hinges, handles, locking arrangement, Double action floor spring, rubber beading, sealant, necessary hardware, cutting, alignment, testing, and complete installation as per approved design and site conditions. The scope includes supply of all materials, accessories, transportation, tools, and labour required for the complete finished work including taking down old existing doors and repair the wall/floor surface to fixed the new door. Make : Jindal/ Saint Govind/ Ozone. |
| 11 | Supply and fix in repair for Double action floor spring hydraulically regulated made up of minimum 1.25 mm thick aluminium alloy sheet foundation box, main body with stainless steel cover, governing pivot made of brass, other parts made of mild steel heavy duty and fixed, complete all as specified and directed.Make : Ozone or equivalent approved by any Command / ADG. |
| 12 | M&L for installing designer 12 mm thick gypsum board seamless false ceiling as per approved design and drawings, including GI framework, suspension system, ceiling boards, jointing and finishing, grooves, cut-outs for services, edge profiles, surface preparation, incl putty application, sanding, smooth finish, apply two coat of premium quality paint over a coat of primer. The scope also includes POP/gypsum finishing, cutting for cob light slot, making hole for any electric fitting wherever required to achieve the desired design aesthetics. Supply of all materials, transportation, tools, consumables, scaffolding, and labour required for complete finished work, complete all as specified and as directed by manufacturer instructions. |
| 13 | M&L for decorative glass cladding for counter/receptions including toughened/back-painted glass 8mm thick, necessary SS patch fittings, backing support, adhesives, edge finishing, cut-outs, fixing accessories, sealant, and complete installation as per approved design and site conditions. The scope includes supply of all materials, transportation, tools, consumables, and labour required for the complete finished work complete all as specified and as directed by manufecturer instructions. Make : Glass: Saint Govind, Fitting : Ozone or Equivalent approved by any Command / ADG. |
| 14 | M&L for taking down old cement plaster upto 12 metre height and all debries removing the outside of MOD land including necessary scaffolding etc complete all as specified and directed. |
| 15 | M&L for 15mm thick rendering in cement mortar 1:4 on walls of surfaces finished fair and even without using extra cement Incl. water proofing compound upto 12 Mtr height including necessary scaffolding etc complete all as specified and directed. |
| 16 | M&L for preparation of new plastered/concrete surface of wall/chajjas/facia and applying two coats of exterior emulsion paint over 2mm thick water proof wall care putty upto 12 Mtr height including necessary scaffolding etc complete all as specified and directed. |
| 17 | M&L for prepare of vertical cementous surface/ tiles/ concrete surface using mechanical means as per manufacturer instructions. (a) Take Poly plastic fibre adhesive/ Ezee coat ultra, white cement in equal proportion & add 25% water in it to make the mix as per manufacturer instructions. Apply 1 coat of wall bind adhesive mixture to the cementous surface/ wall tiles/ concrete surface using a roller & brush as base coat.(b) Applying the double layer of glass fibre mesh of 60 GSM on base coat of vertical wall surface & apply two coat of above mixture of poly plastic fibre adhesive/ Ezee coat ultra with a roller & brush to cover the fibre mesh thoroughly. (c) Final & top coat apply with mixing ratio of poly plastic fibre/ Ezee coat ultra top coat & water & white cement as per manufacturer instructions.Note :- The poly plastic fibre/ Ezee coat ultra should have following characterstics :-(a) Resists positive hydrostatic presure of upto 14 bars.(b) Crack filling ability upto 45 mm.(c) Temp control upto 14 degree celecious on any surface like concrete roof, metal shed & for walls also.(d) High durablity to water, fire & UV rays covering climate condition to + 55 degree celcious.Make : Nerolac Perma/ European Paints & Chemicals/ Ever Paint. Note:- The treatment shall be done on vertical cementious surface/ tile/new/concrete surface/brick tile for proper bonding & requsite results Surface to be treated shall be passed by Engr-in-Charge including necessary scaffolding up to15 metre and safety measure to complete the work nothing shall be paid extra. |
| 18 | M&L for prepare of roof surface any type /bricktiles/concrete tiles/concrete surface using mechanical means as per manufacturer instructions. (a) Take Poly plastic fibre adhesive/ Ezee coat ultra, white cement in equal proportion & add 25% water in it to make the mix as per manufacturer instructions. Apply 1 coat of wall bind adhesive mixture to the cementous surface / wall tiles/ concrete surface using a roller & brush as base coat.(b) Applying the double layer of glass fibre mesh of 60 GSM on base coat of vertical wall surface & apply two coat of above mixture of poly plastic fibre adhesive/ Ezee coat ultra with a roller & brush to cover the fibre mesh throughouly. (c) Final & top coat apply with mixing ratio of poly plastic fibre/ Ezee coat ultra top coat & water & white cement as per manufacturer instructions.Note:- The poly plastic fibre/ Ezee coat ultra should have following characterstics :-(a) Resists positive hydrostatic presure of upto 14 bars.(b) Crack filling ability upto 45 mm.(c) Temp control upto 14 degree celecious on any surface like concrete roof, metal shed & for walls also.(d) High durablity to water, fire & UV rays covering climate condition to + 55 degree celcious. Make : Nerolac Perma/ European Paints & Chemicals/ Ever Paint. Note:- The treatment shall be done on roof cementious surface/ tile/new/concrete surface/brick tile for proper bonding & requsite results Surface to be treated shall be passed by Engr-in-Charge including necessary scaffolding up to15 metre and safety messure to complete the work nothing shall be paid extra. |
| 19 | Supply and Fixing for PVC Wall Lining any colour, texture consisting of 5mm thick single side prelam PVC sheet used instead of plain including PVC sheet fillet (U, C or L shape) by mean of solvent/nails/screws to make grid as per manufacturer instruction fixing on wall and including of taking down old PVC wall Panneling all as specified and directed. Note :- Make and colour Approved by GE |
| 20 | M&L 12mm thick glass reinforced gypsum (GRG) ceiling tiles of size 595 x 595mm of approved design fixed with powder coated (powder coating on web bottom only) GI grid consisting of groove in main Tee section of size (15mm x 30mm), groove in cross Tee section of size (15mm x 23mm) and powder coated GI wall angle of size (20mm x 20mm) suitable for mounting tiles of 595 x 595mm with 4mm dia GI wire suspender including fabrication complete including taking down existing ceiling upto height 15 Metre complete all as specified and directed. Make : Diamond/ Please Enable Macros to View BoQ information |
| 21 | M&L 12mm thick glass reinforced gypsum (GRG) ceiling tiles of size 595 x 595mm of approved design fixed with powder coated (powder coating on web bottom only) GI grid consisting of groove in main Tee section of size (15mm x 30mm), groove in cross Tee section of size (15mm x 23mm) and powder coated GI wall angle of size (20mm x 20mm) suitable for mounting tiles of 595 x 595mm with 4mm dia GI wire suspender including fabrication complete including taking down existing ceiling upto height 15 Metre complete all as specified and directed. Make : Diamond/ Please Enable Macros to View BoQ information |