| 1 | Construction of Cremation Shed at Kallampuli Village in Poigai Panchayat in Kadayanallur Panchayat Union |
| 2 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B |
| 3 | Cement concrete 1:4:8 mix using 40m ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. |
| 4 | Filling with Excavated Earth including watering & Ramming etc., complete. |
| 5 | Supplying and filling with sand including all cost and conveyance and labour charges for watering & Ramming etc., complete. |
| 6 | Random Rubble Masonry in cm 1:5 mix using required bond stone with simultaneous pointing including all labour charges. |
| 7 | Brick work in cm 1:5 mix using country bricks including all cost and conveyance and all labour charges etc., complete. |
| 8 | Centering charges for all concrete works including all cost and conveyance and all labour charges etc., complete. |
| 9 | Upto Basement |
| 10 | Above Basement |
| 11 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. |
| 12 | RCC in cm1:1.5:3 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. |
| 13 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. |
| 14 | Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete. |
| 15 | Finishing the top of roof with one course of machine pressed tiles of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound and top pointing with same oiled mortar including all cost and conveyance of all materials and labour charges etc. complete |
| 16 | Cement concrete 1:2:4 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. |
| 17 | Distempering two coats using best quality and approved colour of oil bound distemper over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete. |
| 18 | Exterior Emulsion using best quality and approved cement paint over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete. |
| 19 | Supplying & fixing with RCC Precast Slabs 50mm thick for chimney cover slab etc., complete. |
| 20 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |