| 1 | Excavation in trenches in any type of soil not exc. 1.5 mtr wide and not exc. 1.5 mtr in depth for laying of cable, foundation etc and getting out complete all as specified and directed. |
| 2 | Excavation in trenches in any type of soil not exc. 1.5 mtr wide and exc. 1.5 mtr and not exc. 3.0 mtr in depth for laying of cable, foundation etc and getting out complete all as specified and directed. |
| 3 | M&L for sand cushioning & covering of under ground cable using crushed metal sand in trenches for cable protection complete all as specified and directed. |
| 4 | M&L for sub class 'B' bricks well burnt of size 23 x 11.5 x 7.5 cm for protection of UG cable laid dry flat over the cable width wise across the length of the cable and abutting each other with gap less than 10mm between the adjacent bricks in trenches complete all as specified and directed. |
| 5 | M&L for laying un-reinforced precast concrete cable cover, class HV type-1, flat size 300x180x40 mm for protection of under ground cable laid dry flat over the cable with width equal to length of the cable and abutting each other with gap between adjacent slab not exc. 10mm over under ground cable in trenches complete all as specified and directed. |
| 6 | Returning, filling in including spreading levelling watering and well ramming in layers not exceeding 25 cm in soil complete all as directed. |
| 7 | Removing of excavated soil to a distance n exc 50 mtr and deposited where directed at a level not exc 1.5 mtr above the starting point complete all as directed. |
| 8 | Cutting existing road/ hardstanding of any type by using crow bar chisel upto a depth of 60 cm for laying HDPE/ GI pipe upto 100 mm including making good the surface by returning, filling, watering, ramming in layers of 150 mm thick PCC 1:2:4 over 200 mm thick hard core of broken bricks/stones over returning filling watering ramming in layers not exceeding 25 cm thick complete all as directed. |
| 9 | M&L for PCC (1:4:8) type D-2 (using 40 mm graded crushed stone aggregate) as in foundations and mass concrete for foundations of poles etc complete all as specified and directed. |
| 10 | M&L for PCC (1:2:4) type B-1 (using 20 mm graded crushed stone aggregate) for coping of poles including necessary from work for finishing exposed faces of concrete smooth and even using extra cement complete all as specified and directed. |
| 11 | Taking out carefully LT cable of any size from 10 sqmm to 300 sqmm or of any type or make from ground/ poles/ pipes etc and testing for serviceability and laying the same serviceable LT cables under ground/ on poles/ through pipes etc at same or any other location and testing after connections complete all as directed.Note:- (a) Item to be measured only when cable is found serviceble for reuse.(b) Necessary excavation, sand cushioning, cable protection covers, returning, removal etc shall be measured and paid separately under relevant items. |
| 12 | Supplying, laying, jointing and testing underground XLPE insulated & PVC sheathed, armoured heavy duty multistranded electric cable with aluminium conductor, 1100 volts grade in trenches/ ducts/ along poles/ through pipe/ under road/ PCC etc and connecting with new aluminium lugs including taking out existing unserviceable cable of any size/ type complete for the following cross sectional area complete all as specified and directed:-Notes:(a) Excavation, returning filling, removal, sand cushioning, cable protection covers, GI protection pipe etc shall be measured and paid separately.(b) Any damage done during cable excavation to the existing UG infra like UG pipelines, UG electric cables, OFC etc shall be repaired by the contractor at their own expenses.(c) Cost of T&P required for handling/ laying of cable is deemed to be included in the rate quoted by the contractor. |
| 13 | 10.0 Sqmm, 4 core. |
| 14 | 16.0 Sqmm, 4 core. |
| 15 | 25.0 Sqmm, 4 core. |
| 16 | 50.0 Sqmm, 3.5 core. |
| 17 | 70.0 Sqmm, 3.5 core. |
| 18 | 95.0 Sqmm, 3.5 core. |
| 19 | 120.0 Sqmm, 3.5 core. |
| 20 | 150.0 Sqmm, 3.5 core. |
| 21 | 185.0 Sqmm, 3.5 core. |
| 22 | 240.0 Sqmm, 3.5 core. |
| 23 | 300.0 Sqmm, 3.5 core. |
| 24 | Taking out HT cable of any size from 95 sqmm to 185 sqmm or of any type or make from ground/ poles/ pipes etc and testing for serviceability and laying serviceable HT cables under ground/ on poles/ through pipes etc at same or any other location and testing after connections complete all as specified and directed. Note:- (a) Item to be measured only when cable is found serviceble for reuse.(b) Necessary excavation, sand cushioning, cable protection covers, returning, removal etc shall be measured and paid separately under relevant items. |
| 25 | Supplying, laying, jointing and testing HT underground electric power cable, XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, (conforming to IS-7098 Part-I), ISI Marked, with aluminium conductor multi stranded, heavy duty,11000 Volts grade ( earthed ), in trenches/ ducts/ along poles/ through pipe/ under road/ PCC etc complete including taking out existing unserviceable cable of any size/ type for the following cross sectional area complete all as specified and directed:-Notes:(a) Excavation, returning, removal, sand cushioning, cable protection covers, GI protection pipe etc and HT cable end joints/ straight through joints shall be measured and paid separately.(b) Any damage done during cable excavation to the existing UG infra like UG pipelines, UG electric cables, OFC etc shall be repaired by the contractor at their own expenses.(c) Cost of T&P required for handling/ laying of cable is deemed to be included in the rate quoted by the contractor. |
| 26 | 95.0 Sqmm, 3.0 core. |
| 27 | 120.0 Sqmm, 3.0 core. |
| 28 | Material and labour for heat shrinkable indoor type cable end joint complete with jointing material and accessories for 3 core XLPE armoured aluminium conductor HT U/G cable 11000 volts grade (earthed) and testing after jointing of the following sizes : |
| 29 | 95 sqmm, 3 core |
| 30 | 120 sqmm to 185 sqmm, 3 core |
| 31 | Material and labour for heat shrinkable outdoor type cable end joint complete with jointing material and accessories for 3 core XLPE armoured aluminium conductor HT U/G cable 11000 volts grade (earthed) and testing after jointing of the following sizes : |
| 32 | (a) 50 sqmm to 95 sqmm, 3 core |
| 33 | (b) 120 sqmm to 185 sqmm, 3 core |
| 34 | Material and labour for heat shrinkable straight through joint complete with jointing material and accessories for 3 core XLPE armoured aluminium conductor HT U/G cable 11000 volts grade (earthed) and testing after jointing of the following sizes : |
| 35 | 50 sqmm to 95 sqmm, 3 core |
| 36 | 120 sqmm to 185 sqmm, 3 core |
| 37 | Supply and laying in trenches/ fixed to poles/ wall/ laid in floor GI steel tubing 80mm bore (dia) light grade including fitting bolt, nut & washers etc or wooden rubber bushing at the ends of complete all as directed incl disconnection and taking down existing tubing complete all as specified and directed. |
| 38 | All as per item No. 18 but size of pipe 50mm dia. |
| 39 | Supply & Laying of High density polyethylene pipes (HDPE) of pressure rating PN 6 size laid in trenches/ fixed to poles/ wall/ laid in floor for the protection of UG cable for following bore of pipes: |
| 40 | Bore of pipe 50 mm |
| 41 | sBore of pipe 80 mm |
| 42 | Supplying, errecting and fixing steel tubular swaged poles of following type and height, complete with cast iron base plate, heat resistance finial taper plug, bolts, nuts and screws as specified including painting with two coats of synthetic enamalled paint over one coat of red oxide primer and 06 Nos bands/straps with white/ red/ black/ yellow as required (30cm wide each) epoxy heat resistant paint at a distance 30cm from plinth block and numbering of poles with black synthetic enamel paint in 2.5 cm height including taking out existing unserviceable pole of any type/ height/ make etc and removing from site complete all as specified and directed.Notes: 1. Excavation, returning, removal, PCC for foundation and coping etc shall be measured and paid separately.2. Any damage done during erection of pole to the existing UG infra like UG pipelines, UG electric cables, OFC etc shall be repaired by the contractor at their own expenses.3. Cost of T&P required for transporting/ handling/ erection etc of pole is deemed to be included in the rate quoted by the contractor. |
| 43 | Type 410-SP-31, 9.00 metre long |
| 44 | Type 410-SP-55, 11.00 metre long |
| 45 | Supplying, installing and testing in replacement gang operated air break switch 12 insulator type, HT 11 KV, AC 50 C/S, Triple pole, Horizontal/ vertical mounting type, mechanically operated from ground, mounted on 12 silicon rubber insulators 11 KV grade and steel frame, current rating upto 200 Amps complete with fuse mounting, fuse carriers and fuse elements of required capacity fixed on the pole structure on channel/ angle iron/ cross arm with suitable GI nuts, bolts & washers etc including taking down existing unserviceable of any type/ size etc and removing from site complete all as specified and directed. |
| 46 | Supplying, installing and testing lightning arrestor, station class type of rated voltage 12 KV and discharge current capacity 65 KA suitable for 11000 Volt including taking down existing unserviceable of any type/ size etc and removing from site complete all as specified and directed. |
| 47 | S&F in replacement Pin type insulator porcelain, vitereous white brown or green of 150 mm height & 150 mm dia including one galvanised mild steel spindle, two galvanised iron washer and one galvanised iron nut suitable for working pressure 11000 volts including taking down existing unserviceable of any type/ height/ make etc and removing from site complete all as specified and directed. |
| 48 | S&F in replacement single disc porcelain, vitreous white/ brown insulator 255 mm dia and 145 mm height assembly for tension with tension clamps for conductor working pressure 11000 volts including taking down existing unserviceable of any type/ make etc and removing from site complete all as specified and directed. |
| 49 | M&L for cross arms, bracing, supports, clamps and back plates fabricated from structural steel section (flat iron/ angle iron/ MS sheet) including back plate, MS boxes made out of MS sheet, clamps or D clamps made out of MS flat iron made to shape including nuts, bolts, washers, welding, bending hot or cold, drilling holes for bolt in any size or shape as directed inclusive of two coats of aluminium paint over a coat of red oxide primer including taking out existing unserviceable of any size/ type etc and removing from site complete all as specified and directed. |
| 50 | S&F in replacement Danger notice plate of 1.6 mm thick mild steel sheet, vitreous enamelled white, with letters, figures and conventional skull and bones insignal red colour and fixed with M.S. clamps, bolts and nuts of following sizes including taking down existing unserviceable of any type/ size etc and and removing from site complete all as specified and directed. |
| 51 | For LT of size 20 x 15 cm. |
| 52 | For HT of size 25 x 20 cm. |
| 53 | Dismantling carefully existing steel poles/ struts/ PCC poles of any size/ type for reuse including necessary excavation, demolition of concrete, shifting to a location including loading, unloading and erection in true vertical position complete all as directed. Note - 1. Item to be measured only when pole is found serviceble for reuse at same or any other location.2. Cost of PCC shall be measured and paid separately under relevant items. |
| 54 | Supplying and laying in replacement synthetic rubber insulated mats 2.5 mm thick for voltage upto 11 KV for electrical purpose as per IS 15652-2006, suitable for electrical shock safety of sizes 2m x 1m complete all as specified and directed. |
| 55 | Material and labour for filtration/ dehydration of the existing transformer oil at site of any make and capacity of transformer up to required dielectric strength as per IE rules and refilling in the transformer up to required level and removing from site complete all as specified and directed.Note :- (a) The dielectric strength shall not be less than 65 KV for 33 KV Tfr & 50 KV for 11 KV transformer after dehydration process.(b) Transformer oil required for topping up shall be measured for separately under relevant items of schedule. |
| 56 | Supply & filling new transformer oil of dielectric strength not less than 50KV for 60 Sec for topping up to required level of transformer and removing from site complete all as specified and directed. |
| 57 | Disconnecting all HV & LV electric and earthing connections of existing 11/.415 KV distribution transformer from its position at site at any location under GE Dehradun for repair/ servicing/ rewinding with in Dehradun of following capacities: |
| 58 | (a) 63 to 200 KVA |
| 59 | (b) 250 to 400 KVA |
| 60 | (c) 500 to 630 KVA |
| 61 | Transporation of transformer to authorized workshop (UPCL autorised company) by making necessary arrangements of T&P (crane, recovery, vehicle etc.) for the following capacities. |
| 62 | (a) 63 to 200 KVA |
| 63 | (b) 250 to 400 KVA |
| 64 | (c) 500 to 630 KVA |
| 65 | Material and labour for opening of transformer top cover by extraction, removing of serviceable/ unserviceable nuts bolts and washers etc for the following capacities: Note : Contractor will carry out a pre-inspection of transformer at the Company and obtain necessary photos and certificate of Coil cutting from the company duly signed by Inspecting officer and Engineer of the Company. |
| 66 | (a) 63 to 200 KVA |
| 67 | (b) 250 to 400 KVA |
| 68 | (c) 500 to 630 KVA |
| 69 | Material and labour for draining out of transformer oil after taking proper shut down and disconnection of all electric connections complete all as specified and directed. |
| 70 | Material and labour for lifting primary (HT) and secondary coil (LT), dismantaling transformer carefully complete part by part & display all the parts without damaging any portion for inspection for the following capacities. |
| 71 | (a) 63 to 200 KVA |
| 72 | (b) 250 to 400 KVA |
| 73 | (c) 500 to 630 KVA |
| 74 | Material and labour for replacement of burnt winding of transformer with fresh copper wire or strip including insulation paper bobins etc and keeping the same into the hot air oven till the removal of moisture and improvement of insultating resisitance to the desired level as directed and refixing the same in original position including carrying out testing all as specified and directed. Note :-(a) Transformer will be issued to the contractor through issue voucher and gate pass.(b) Inspection of transformer to be carried out before lifting the transformer and signature to be obtainted from Contractor, JE E&M and Engr-in Chage as per inspection report.(c) Transformer should be rewinded through authorised dealer of manufacturer company and authorisation certificate and bills of cost of rewinding to be submitted before payment.(d) Test certificate, Warranty certificate, Copy of Job order to be submitted before payment.(e) New oil to be filled up into tranformer and quantiy to be measured and paid seperately under relevant item.(f) The dielectric strength transformer oil shall not be less than 50 KV. (g) All the unserviceable and retrieved parts of transformer during the winding shall be deposited to MES store yard/ MRS Garhi Cantt and issued to contractor as schedule credit through issue voucher and gate pass. |
| 75 | S&F in replacement of gasket & washer for transformers of following capacities: |
| 76 | (a) 63 to 200 KVA |
| 77 | (b) 250 to 400 KVA |
| 78 | (c) 500 to 630 KVA |
| 79 | Material and labour in replacement for silica gel breather assembly for transformers of following capacities: |
| 80 | (a) 63 to 200 KVA |
| 81 | (b) 250 to 400 KVA |
| 82 | (c) 500 to 630 KVA |
| 83 | Material and labour in replacement for HT bush rod and checking for any leakages for transformers of following capacities: |
| 84 | (a) 63 to 200 KVA |
| 85 | (b) 250 to 400 KVA |
| 86 | (c) 500 to 630 KVA |
| 87 | Material and labour in replacement for LT bush rod and checking for any leakages for transformers of following capacities: |
| 88 | (a) 63 to 200 KVA |
| 89 | (b) 250 to 400 KVA |
| 90 | (c) 500 to 630 KVA |
| 91 | Re-assembling the transformer complete with all existing serviceable parts and new parts as per requirement complete all as specified and directed for following capacites:- |
| 92 | (a) 63 to 200 KVA |
| 93 | (b) 250 to 400 KVA |
| 94 | (c) 500 to 630 KVA |
| 95 | Transportation of distribution transformer back from workshop including replacement to its original position or any other location under GE Dehradun after repair/ servicing/ rewinding etc and reconnecting HV, LV electrical connections, earthing connections and testing after installation for following capacities of transformers: Note:- Transformer will have warranty period of 6 months from the date of re-fixing at site. |
| 96 | (a) 63 to 200 KVA |
| 97 | (b) 250 to 400 KVA |
| 98 | (c) 500 to 630 KVA |
| 99 | S&F in replacement of transformer cable boxes or LT panel board cover/ panel doors etc made out of 3.0 mm CRCA sheet duly powder coated complete to make the system safe and secure complete including making holes, nuts, bolts, washer etc all as per site requirement complete all as specified and directed. |
| 100 | Dismantling of distribution transformer of any size/capacity from 2/4 Pole structure after carefully disconnecting exisiting HT and LT electric & earthing connections and re-connecting after the mounting to the PCC foundation/ at existing location and dismantling HT Poles and other accessories (if any) for depositing to MES store for re-installation complete all as specified and directed. |
| 101 | Material and labour for transformer platfrom of size 3mx2.5mx1.2 m with brick masory (Sub class B bricks old size) with steps, earth work in any type of soil, PCC 1:3:6 type C-2 in foundation 100 mm thick, PCC coping 75 mm thick 1:2:4 type B-1, 15mm thick rendring in CM 1:4 including white wash with two coats, X-PM jali (weight n exc 4 kg per sqm) all round the platform with angle iron 65x65x6 mm size on corner with steel wicket gate of suitable size and applying two coats of synthetic enamel paint over a coat of red oxcide primer complete all as specified and directed. |
| 102 | Material and labour for loose filling with stone aggregates of gauge 40 to 80 mm in surrounding of transformer permisses complete all as specified and directed. |
| 103 | Material and labour for shifting of transformer from any site/ location under GE Dehradun with necessary transportation and lifting arrangements and placing the transformer wherever directed. |
| 104 | Material and labour for trimming/ pruning of tree branches up to 5 meters above & below and both sides to obtain clearance all around the LT over head lines / HT over head lines conductor upto 5 mtr from conductor including removing of cut branches and cleaning of site complete all as specified and directed. |
| 105 | Material and labour for painting of 11 meter existing 4 pole structure including pole, cross arm, bracing clamps, GO DO fuse etc with two coats of heat resistance aluminium paint above coping incuding making 5 nos of alternative strips of black and red paint of 30 cm width complete all as specified and directed. |
| 106 | All as per item No 50 here -in-before but 2 pole structure complete all as specified. |
| 107 | Material and labour for painting of steel pole 11 meter height after preparing the surface by scrapping old paint with sand paper with two coat of aluminium paint over a coat of red oxide primer incuding making 5 nos of alternative strips of black and yellow paint of 30 cm width & numbering of pole as per existing complete all as specified and directed. |
| 108 | Material and labour for painting of steel pole 09 meter height after preparing the surface by scrapping old paint with sand paper with two coat of aluminium paint over a coat of red oxide primer incuding making 5 nos of alternative strips of black and yellow paint of 30 cm width & numbering of pole as per existing complete all as specified and directed. |
| 109 | Material and labour for spraying agricultural based chemical around transformer/ LT panel installation to control the growth of unwanted herb, shrubs etc including cutting, removing the vegetation growth & surface dressing all around the installation yard/ transformer /LT panel Board area external only to keep installation always clean and tidy condition complete all as directed. Note:- (a) All the installation yards/area around transformers shall be kept clean throughout contract period by repeatedly removing the grass / shrubs as many times required depending on the growth of grass.(b) Payment to the contractor will be made separately for each time the job is executed as per the requirement and direction by the Engr-in-Charge. Please Enable Macros to View BoQ information |
| 110 | Material and labour for spraying agricultural based chemical around transformer/ LT panel installation to control the growth of unwanted herb, shrubs etc including cutting, removing the vegetation growth & surface dressing all around the installation yard/ transformer /LT panel Board area external only to keep installation always clean and tidy condition complete all as directed. Note:- (a) All the installation yards/area around transformers shall be kept clean throughout contract period by repeatedly removing the grass / shrubs as many times required depending on the growth of grass.(b) Payment to the contractor will be made separately for each time the job is executed as per the requirement and direction by the Engr-in-Charge. Please Enable Macros to View BoQ information |