| 1 | Detailed Estimate |
| 2 | 15.28.2:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos cement Sheet |
| 3 | 12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 4 | 12.51.1:Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screwscomplete :Ridges plain (500-600 mm) |
| 5 | OD101741/2024-2025:Chipping and removing old spalling/defective concrete and exposing the defective /corroded reinforcement of the ceiling, joint the additional bar wherever 1/3 diameter of the bar is corroded.Removel of the defective concrete across yhe bar should be at least 2 mm beyond the defective bar so that the reinforcing bar can be cleaned with emery ribbon,wire brush etc.After cleaning the bar wash the bar with clean water and collect all the spalled/fallen concrete.measurement is calculated for whole exposed area .Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. |
| 6 | OD101742/2024-2025:The cleaned reinforcing bar,on the dried bar,applying corrotion inhibitant one coat of nitrozinc primer care should be taken to see that the zinc rich primer coated should make an unbrocken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond A R/SBR.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hirecharges of tools etc complete. |
| 7 | OD101744/2024-2025:The applying two component high build polymer modified cementitions reinstatement mortor Rendroc HB2 preferable with hand using wet on wet methed to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the acidic concrete.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etccomplete. |
| 8 | OD101747/2024-2025:The Ceiling surface is to be smoothened with modified mortar to an average thickness of 15 mm. measurement is calculated as in the previous case.Including cost of meterials, labour charges, conveyance of meterials to site hire charges of tools etc complete |
| 9 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 10 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 11 | 13.91:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 12 | 13.50.1:Applying priming coat:With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) |
| 13 | 13.65.1:Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work Please Enable Macros to View BoQ information |