| 1 | Vadaseri work |
| 2 | Chipping the old Plastering and providing new Plastering the ceilling with CM 1:3,10 thick including cost of all materials,labour,lead,lift etc complete |
| 3 | Brick Work in Cement mortar 1:5 using second class Chamber Burnt Bricks size 9\\" x 4' 3/8\\" x 2' 3/4\\"including cost of all materials,labour lead ,lift etc complete |
| 4 | Providing new Plastering the walls with CM 1:5,12mm thick including cost of all materials,labou,lead,lift etc complete. |
| 5 | Removing and refixing of good quality of Pressed tiles of size 230x 230 x20 mm laying over cm 1:3, mixed with crude oil at 10% by weight of cement and pointed with the same oiled mortor including cost of, cement all materials, curing, labour, lead and lift etc., and including cost of material and labour for applying water proof component over the terrace etc., complete. |
| 6 | Supply of Asbestos Cement Fully Corrugated Sheet of 6mm thick including transporting , all lead ,lift etc.,complete. |
| 7 | Labour charges for fixing the Asbestos Cement Fully Corrugated Sheet in position for roofing including cost of all washers, J bolts and hooks , all lead,lift etc complete. |
| 8 | Supply of roof supporting materials such as M.S round bar,rectangle bar, square bar etc., including transporting charges,lead ,lift etc., complete. |
| 9 | Scrapping of old plastered surface and White washing two coats with white cement including cost of all materials,labour lead,lift etc complete |
| 10 | Supplying and fixing of stain free nano polish Vitrified tiles of size 600mx600mmx 8mm in CM 1:3 of approved quality and colour including cost of all materials lead,lift etc complete,, |
| 11 | Providing of joint free first quality Ceramic tiles/Non slippery tiles of size 305mmx305mmx8mm in CM 1:3 of approved quality and colour including cost of all materials dismantling old existing damaged tiles lead,lift etc complete, |
| 12 | Replacement of Indian type colour water closet with “ P “ or “ S “ trap with all internal fittings, including cost of all materials, labour lead, lift, etc., complete. |
| 13 | Supplying and fixing of PVC screw down tap including cost of all materials, labour lead, lift, etc., complete. |
| 14 | Repairing the existing steel framed doors & windows ,grill windows, and placing back in position,Painting including cost of Hinges ,Aldrops ,Screws and other materials, all labour,lead,lift etc., complete. Please Enable Macros to View BoQ information |