| 1 | Providing Cable Duct |
| 2 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. |
| 3 | Supplying and filling with M-Sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. |
| 4 | PCC 1:4:8 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour, materials, lead, lift, curing, etc., complete. |
| 5 | RCC 1:2:4 using 12 to 20mm (machine crushed) metal for column raft foundation without formwork including cost of all materials, labour lead, litf, etc., complete. |
| 6 | RCC 1:2:4 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete. |
| 7 | RCC 1:2:4, using 20mm HBG metal for RCC Road and cable duct side wall with form work including cost of cement, all materials, labour, lead, lift, etc. complete. |
| 8 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. |
| 9 | Labour charges for transporting from casting yard to curing tank,curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete |
| 10 | Supplying, Fabrication and Labour charges for fixing of GI angles of 50x50x6mm sizes vertically @ 75cm c/c to the required length for supporting the cable in the cable duct in correct position including labour ,cutting etc., complete as per the drawing and std.specification. |
| 11 | Plastering with CM. 1:3 mix 12mm thick for ceiling,fol, bath, RCC pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete. |
| 12 | Colour washing two coats of approved exterior plastic emulsionover one coat of white cement primer for wall including cost of all materials, labour, lead, lift, etc., complete. |
| 13 | Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete. Please Enable Macros to View BoQ information |