| 1 | Total of Schedule-A Contract:- E/EM/L-01/01/2026 Preamble |
| 2 | The bill of Quantities shall be read in conjunction with Notice Inviting Tenders, Instructions to tenderers, General and Special Conditions of Contract, Employers Requirements & Technical Specification and other relevant documents |
| 3 | BoQ1 consists of Schedule ‘A’ (for CAMC) is completed and finished items of works and complete in all respect. |
| 4 | Tenderers shall quote their offer in Indian Rupees (Rs.) only. Tenderers are required to quote percentage (%) Excess/Less in figures in the appropriate highlighted cells in excel Sheet namely BoQ1. |
| 5 | The rates and prices to be tendered in the unit Priced Bill of Quantities are for completed and finished items of works and complete in all respect. It will be deemed to include Duties, Taxes , Octroi, Royalty etc., cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, utility identification, contractor’s profit and establishment/overheads, together with preparation of design and drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. For taxes and duties refer clause C 2.4 & C2.5 of ITT & clause 10 of SCC. |
| 6 | If the tenderer fails to quote rates against any item, the tender may be treated as incomplete and non responsive and shall be rejected |
| 7 | Errors will be corrected by the employer for any arithmetic errors in computation or summation as per contract conditions. |
| 8 | The price offer in the BOQ shall be given without considering any deviation mentioned in Appendix-3 of FOT i.e. price in the box shall be quoted as per tender conditions without any deviation. |
| 9 | Bill of Quantities comprises of items/works to be executed as per Employer’s Requirements. |
| 10 | The Financial Proposal (as per BOQ) shall be uploaded online on the website http://etenders.gov.in/eprocure/app. The rates shall be quoted in the excel file provided in the bid documents. The tenderer shall download the excel file and quote the rates/percentage in figure against BOQ amount given in respective schedules in the appropriate highlighted cells in Excel sheet namely \\"BoQ1\\". After quoting their rates the excel file shall be uploaded accordingly. The rates shall not be offered/quoted elsewhere in the technical submission/ tender submission. |
| 11 | The work executed against all the BOQ as detailed in tender document would be paid as per clause 11 of Employer Requirement & Technical Specification. Please Enable Macros to View BoQ information Contract:- E/EM/L-01/01/2026 APPENDIX-3A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS(Refer Clause C 2.2(d) and C 15.1 of ITT) 1. The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price adjustment for each deviation/s Note : 1. The Tenderer shall indicate price adjustment against each deviation in Appendix-3A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Appendix, it will have no effect. Signature of authorized signatory On behalf of Tenderer DELHI METRO RAIL CORPORATION LIMITED BOQ Contract: - E/EM/L-01/01/2026 “Comprehensive Annual Maintenance Contract (CAMC) of Edwards make fire detection system installed at 6th floor, Block-1, IT Park, Shastri Park for 03 years”. Sl. No. Discription Unit QTY. Rate (ex. GST) Amount Schedule-A (CAMC) |
| 12 | Comprehensive Annual Maintenance Contract of fire detection system of Edwards make including all associated equipments/accessories i For 1st year Nos 1.0 295919.49 295919.49 ii For 2nd year Nos 1.0 310715.46 310715.46 iii For 3rd year Nos 1.0 325511.44 325511.44 Total amount of Schedule-A (Ex. GST) 932146.39 GST @ 18% 167786.35 Total amount of Schedule-A (Inclusive of GST @ 18%) 1099932.74 23 |