| 1 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP |
| 2 | Channel(GI) GI 100 X 50 X 6 MM Channel |
| 3 | Flats(GI) 50x6 mm. |
| 4 | Channel(GI) GI 75x40x4.8 mm |
| 5 | Angle(GI) 50 X 50 X 6MM GI |
| 6 | 100 KVA , 11/ 0.4 KV (AL) Transformer, BIS Energy Loss level II |
| 7 | LT Distribution Box with MCCB, Aluminium Busbar of 2 Bay with kit kat fuse for 100 KVA S/S |
| 8 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 9 | 4 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR 100 KVA Trf. |
| 10 | AB Switch(11KV,200A.3pole,50Hz) |
| 11 | H.G.Fuse( 11KV.200A.3Pole) |
| 12 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 13 | POLYCARBONATE BIRD GUARD |
| 14 | Disc insulator (B&S)70 KN polymer |
| 15 | H W fitting (B&S)70KN(3bolted) |
| 16 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 17 | 11KV pin insulator polymer |
| 18 | HT stay set complete |
| 19 | HT stay Clamp (1.9Kg/pair) |
| 20 | HT stay insulator TYPE-C |
| 21 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 22 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 23 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 24 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 25 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 26 | Danger plate 11kv |
| 27 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 28 | Name plate |
| 29 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 30 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 31 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.420Cu.mtr(Per Pole) |
| 32 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (3X2X0.1)= 0.6 Cu. mtr. |
| 33 | Inst 11kv complt stay set with concrete |
| 34 | Earthing chamber incl inst of earthingpipe |
| 35 | Laying 1.1kv cable upto 185 to 400sqmm |
| 36 | Supply and erection G.I. fencing with gate |
| 37 | Sply & crma/fixing/conn termi AL195Lug |
| 38 | SUP/INST 3.5/4C 120-185 SQMM GLND/AL TER |
| 39 | Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.2 mtr., 4 no's Channel(GI) required =( 4x7.14x2.2) ( For Single Pole) |
| 40 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 41 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 42 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 43 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 44 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36 |
| 45 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 46 | Dismantling of PSC pole(9mtr) and return |
| 47 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 48 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 49 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 50 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 51 | Danger Plate, 1 no's. |
| 52 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 53 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 54 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 55 | 11 KV pin insulator polymer |
| 56 | H W fitting(B&S) 70KN, 3Bolt |
| 57 | Disc insulator (B&S) 70 KN polymer |
| 58 | Earthing of Support ( Coil Type ) |
| 59 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 60 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 61 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV |
| 62 | Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ) |
| 63 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 64 | H.T. Stay set (Complete ) |
| 65 | H.T. Stay Insulator Type-C |
| 66 | 7/10 SWG Stay Wire 15kg /stay |
| 67 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 68 | Black Paint(GIS Numbering & Zebra Stripping) |
| 69 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 70 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 71 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 72 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 73 | AAAC 11KV XLPE INSU. CVRD. CDTR. 55SQMM |
| 74 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 75 | 9 Mtr. long 300 Kg. PSC Pole |
| 76 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 77 | EYE hook for XLPE Aerial bunched Cable |
| 78 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 79 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 80 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 81 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 82 | M.U Channel(GI) GI 75x40x4.8 mm (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 83 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 84 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 85 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 86 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 87 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 88 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 89 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 90 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 91 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 92 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 93 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 94 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 95 | 63 KVA , 11/ 0.4 KV (AL) Transformer, BIS Energy Loss level II, Ammendment-4 |
| 96 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 63 KVA S/S |
| 97 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 98 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - FOR 63 KVA Trf. |
| 99 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - From LTDB to Pole |
| 100 | AB Switch(11KV,200A.3pole,50Hz) |
| 101 | H.G.Fuse( 11KV.200A.3Pole) |
| 102 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 103 | POLYCARBONATE BIRD GUARD |
| 104 | Disc insulator (B&S)70 KN polymer |
| 105 | H W fitting (B&S)70KN(3bolted) |
| 106 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 107 | 11KV pin insulator polymer |
| 108 | HT stay set complete |
| 109 | HT stay Clamp (1.9Kg/pair) |
| 110 | HT stay insulator TYPE-C |
| 111 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 112 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 113 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 114 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 115 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 116 | Danger plate 11kv |
| 117 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 118 | Name plate |
| 119 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 120 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 121 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 122 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 123 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 124 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 125 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 126 | Laying of 4 Cx 95 mm2 LT XLPE Cable |
| 127 | SITC and Erection of GI Fencing with Gate |
| 128 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 129 | Supply of AL Lugs suitable for 95 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 130 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 131 | 11 KV pin insulator polymer |
| 132 | H W fitting(B&S) 70KN, 3Bolt |
| 133 | Disc insulator (B&S) 70 KN polymer |
| 134 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 135 | POLYCARBONATE BIRD GUARD |
| 136 | 55 sq.mm AAA conductor |
| 137 | Guarding Channel 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 2.2 mtr., 4 no's channel required =( 4x7.14x2.2) ( For Single Pole) |
| 138 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 139 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 140 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 141 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 142 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36 |
| 143 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 144 | 9 Mtr. long 300 Kg. PSC Pole |
| 145 | LT Stay set Complete |
| 146 | 7/12 SWG GI stay wire, Grade -2 |
| 147 | LT stay Clamp ( 1.40Kg/pair) |
| 148 | LT Stay insulator |
| 149 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 150 | EYE hook for XLPE Aerial bunched Cable |
| 151 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 152 | Suspension Clamp with EYE hook for ABC |
| 153 | 4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 154 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 155 | GI Pipe Earthing (each 5th pole to earth) |
| 156 | Coil Earthing |
| 157 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 158 | Danger plate (LT) |
| 159 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 160 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 161 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 162 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 163 | Black Paint(GIS Numbering & Zebra Stripping) |
| 164 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 165 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 166 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr |
| 167 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 168 | Supply of 58.5 KVA DG Set, CPCB-IV+ compliant, 415V, 3-Phase, water-cooled, silent type with engine, alternator, base frame, built-in fuel tank, battery set, anti-vibration pads, acoustic enclosure, control panel, first fill of oil & coolant with AMF Panel, floor/wall mounted, suitable for 125A with auto-changeover,Stabilizer, MCCBs, digital controller, protections, indicators, wiring and terminations.Make: JAKSON/KIRLOSKAR/MAHINDRA Installation , Testing & Commisioning(Scope): RCC foundation with anchor bolts and vibration pads, including excavation, concrete, shuttering, curing, and finishing. Prefabricated GI Shed with PPGI roofing, MS frame structure, 3-side cladding, exhaust provision and painting. Exhaust pipe with insulation (glass wool and aluminum cladding), supports, rain cap and fittings 4 nos.Chemical earthing with chamber. Power & control cable (3.5C x 70 sqmm Al XLPE armored) with lugs, glands, laying & termination (Approx. 120mtr)Make-KEI/Polycab/Havells Supply of 70 litres of diesel for commissioning Transportation, unloading, placement, contractor handling/logistics Testing & commissioning of complete system with load test, safety checks & submission of documents. |
| 169 | S/F of 1.5 Ton 5 star Inverter type split A.C. M/C with 4 KVA Voltage Stabilizer(110V-300V) (Make - Microtek, V-Guard) and AC stand with all accessories and connections and installation (Make - HITACHI/ Bluestar/ Carrier) |
| 170 | S/F of 2 Ton 5 star Inverter type split A.C. M/C with 5 KVA Voltage Stabilizer(90V-300V) (Make - Microtek, V-Guard) and AC stand with all accessories and connections (Make - HITACHI/ Bluestar/ Carrier)) Please Enable Macros to View BoQ information |