| 1 | Clearing grass & removal of rubbish up to a distance of 30 m out side the periphery of the area as per Technical Specification Clause 201. SOR Chapter No 4 SL No 1 |
| 2 | Excavation in foundation in ordinary soil[ loame, clay or sand] inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches.As per SI. No. 251 |
| 3 | Providing and laying cement concrete 1:4:8 (1 cement : 4fine sand :8 graded brick aggregate 40 mm nominal size) including supply of all materials,labour and T&P etc required for proper completion of the work and curing complete also including cost of formwork in foundation and floors..as per S I No.275 |
| 4 | M-150 B/W in 1:4 cement & C/S of 1.25 FM mortor in foundation & plinth I/C S/O all materials labour & T&P etc.required for proper completion of the work. SI No 305(B) |
| 5 | Class 150 b/w in 1:6 cement & c/s fm mortar in superstructure i/c all labour and Tand P etc required for copmletion of the work SI-303+309+310 a |
| 6 | R.C.C. work with cement, approved coarse sand and 20mm Gauge approved stone ballast in the proportion of 1:1.5:3 in R.C.C. columns. SI NO. 289 |
| 7 | R.C.C. work with cement approved coarse sand and 20 mm gauge stone grit in the proporation of 1:2:4 for slab excluding supply of reinforcement and its bending butincluding its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour andT&P etc. required for proper completion of work. binded wire cost being included in the item.SI-284 (a) |
| 8 | R.C.C. work with cement approved coarse sand and 20 mm gauge stone grit in the proporation of 1:2:4 for slab excluding supply of reinforcement and its bending butincluding its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour andT&P etc. required for proper completion of work. binded wire cost being included in the item.SI-284 (a) |
| 9 | M.S. work in plain work such as RCC work including cutting and bending of bars in required shape and size as per SI No.504 |
| 10 | 12 mm Thick plaster with cement mortar in proportion of 1:6 cement and fine sand including supply of all materials, labour and T&P etc. required for proper completion of the work.SI-584 |
| 11 | 12 mm Thick plaster with cement mortar in proportion of 1:6 cement and fine sand including supply of all materials, labour and T&P etc. required for proper completion of the work.SI-584 |
| 12 | Providing & Fixing Vitirified floor tiles(DOUBLE CHARGE) such as Kajaria,Somany, or equivalent tiles of appropriate size 600 x 600 mm with 1:3 cement and approved corase sand mortar inc. all etc. |
| 13 | Supply @ fixing 5 mm thick approved tiles OF SIZE 300X300 MM with 1:3 cement and approved corase sand mortar finished and jointed with white cement slurry and pigment @polishing complete including supply of all matrrials, labours and T& P. etc. required for proper complection of the work. As Per S.I. NO. 628 |
| 14 | E/WCutting in embankment in ordinary soil, excavation to be in regular pits not exceeding 0.50m in depth earth work in embankment to be in 20cm layers, including ramming and dressing the surface to required levels & slope & also including 1.5m lift & 30m lead.The earth from cutting to be used in making embankment or to be deposited as spoil bank with in 30m.Distance as directed by the enginee incharge(Excluding royality) as per SI No. 253 |
| 15 | Finishing of walls with paint enamel synthetic Asian/Berger Make with three coat over new surface as per UPPWD SOR |
| 16 | Finishing of walls with paint enamel synthetic Asian/Berger Make with three coat over new surface as per UPPWD SOR |
| 17 | Providing and applying putty over plastered surface to prepare the surface even and smooth complete. |
| 18 | S/F of All Sanitary Items & Other Works inc. painting of doors,windows&gates etc. |
| 19 | Painting or varnishing on new wood & iron work in small area with one coat of ready mixed priming paint & one coat of app. Qlty. ready mix paint as per SI. No. 641+642 Over All Rate |
| 20 | Supply of Ordinary portland cement 43-grade (S.I.No. 5 a) |
| 21 | Supply of Fine sand Fineness Modulus1.25 Query Rate (S.I.No.20) (RMR) |
| 22 | Supply of Coarse sand Query Rate (S.I.No.19) (RMR) |
| 23 | Supply of Brick ballast 40mm (S.I.No.2.a) |
| 24 | Supply of stone grit 20mm (S.I.No.A.1) (RMR) |
| 25 | Supply of M-150 bricks (S.I.No.1 A) |
| 26 | Supply of mild steel for R.C.C work As per Sail Rate |
| 27 | Mild steel or iron work in in heavy sizes such as trusses build up gates record racks, etc. inc. all completion of the work.SI-503(Over all Rate of MS work is Rs. 7126.00 Including labour . After Deducting 40 % Labour Charges Painting Rate is applied) (S.I.No.504) |
| 28 | Supply of fixing of Single Leaf 32 mm thick flush door I.S.I Marked (S.I.No.470) |
| 29 | Paint Enamel Syntehtic Asian/Berger Make (S.I.No. (E) I. |
| 30 | Finishing of walls with waterproof cement paint three coat over new surface as per SI No. 660 &661(Over all Rate of Painting is Rs. 81.44 Including labour . After Deducting 40 % Labour Charges Painting Rate is applied) |
| 31 | Fan hooks N.B.O 11.22 |
| 32 | S/F Glass Panel for windows inc. all etc. SI-9(i) 19.11 |
| 33 | Tiles 600 mm x 600 mm(Vitrified Double Charge) (S.I.No.14 E) |
| 34 | Tiles 300 mm x 300 mm (Rectified) (S.I.No.14 A) |
| 35 | Providing and applying putty over plastered surface to prepare the surface even and smooth complete.(S.I.No.37) |
| 36 | S/F OF ALUMINIUM DOOR FOR TOILET INC. ALL FITTINGS 1st Quality(For estimating purpose) . |
| 37 | Supply and fixing of L.E.D Tube Light Fitting Cat AAA. S.I.No. 1413 |
| 38 | As in item no. 211 (B) but in 20mm dia heavy duty (2mm thick) PVC conduit with one number with 2.5 sq.mm. Multistarand copper conductor cable as earth continuity wire drawn in conduit S.I.No. 211 © |
| 39 | Providing and fixing internal wall panels on light gauge steel frame work /PVC panel with 12.5 mm thick gypsum plaster board confiming IS 2095 : 2011 fixed on 8 mm thick fiber cement board confirming to IS 14862 : 2000 of category III Type B (High pressure steam cured) as per standard sizes fixed with self-drilling /tapping screws /fasteners @ 60 cm c/c of approved make, screws shall be of ounter sunk rib head of 1.60 mm to 4 mm thick of 8 to 10 gauge of length varying from 25 to 45 mm. Proper tapping and jointing to be done using fiber mesh tape and epoxy and acrylic based jointing compound for seamless finish ( cost of frame work to be paid for seperately) as per DSR code 26.43 |
| 40 | Proving and fixing at all height false ceiling of 4 mm thick phynol bonded bamboo mat board (595x595mm) confirming to IS : 13958-1994 including providing and fixing of frame work made of GI angle 25x25x0.4 mm thick all around suitably fixed to wall with the help of dash fastener and hanger frame (600x600 c/c) made GI slotted Tee having power coating on bottom side(30x25x0.3 mm thick for main member & 25x25x0.3 mm for cross member) connected to ceiling with 2.64 mm GI wire and anchor fastener at every juction and also including cost of making openings for light fittings, grills, diffusers, cut outs made with frame of perimeter channels suitabiy fixed all complete as per direction of E/I as per DSR 26.6 D. 13 MM Thickness |
| 41 | Supply of Ceiling Fan with Fan Morter of A.C. Permanent Insulation, capacitor rating conforming BEE 5 Star rating and IS:374/79 and also comly with IS:1709/1984 with latest amendment. The rated voltage 220/240 volts, 50Hz, 1-ph AC The fan assemble should consists of down rod blades, shackle canpoies etc and double ball bearing system. Swip. S.I.No. 1501 (1) |
| 42 | s/f 1.5 ton SPLIT DIRECT EXAPANSION ac CONDITINER |
| 43 | Providing and injecting chemical emulsion for Pre Constructional Structure(Anti-Termite Treatment) .(S.I.No.4 (VI) |
| 44 | Painting or varnishing on new wood & iron work in small area with one coat of ready mixed priming paint & one coat of app. Qlty. ready mix paint as per SI. No. 641+642 Over All Rate (Over all Rate of Painting is Rs.96.20 Including labour . After Deducting 40 % Labour Charges Painting Rate is applied) |
| 45 | Complete Installation of Solar street light 2 UNIT As Per UP NEDA (180 G.S.T.) (ATTACHED RATE) 75 Watt Pick and Height Six Meter ( Five Year Warranty) 19739.89+2724.11 |
| 46 | Add extra for electrification inc. all fittings Internal & Extenal Electric Installations and Other Electric Work, Shuttring Work and Other Miscellaneous Work, cartage LS shuttering (For estimating purpose) L.S. |
| 47 | For estimating purpose L.S. |
| 48 | Add extra for internal sanitary work As Per Attatched Boq |
| 49 | Provision of sign board & Photography 3 Steps. (For estimating purpose) L.S. Please Enable Macros to View BoQ information |