| 1 | Dismantling of asbestos cement (corrugated, semi corrugated etc) sheeting in roof covering complete all as specified and directed. |
| 2 | Dismantling of plain or corrugated Galvalume sheet any gauge thickness in roof covering complete all as specified and directed. |
| 3 | S&F of Pre-painted galvatume aluminium zinc coating (150GSM) GI based corrugated steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws all as specified and as directed by Engr-in-Charge. |
| 4 | S& F of Pre-painted galvatume aluminium zinc coating (150GSM) GI based plain steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws all as specified and as directed by Engr-in-Charge. |
| 5 | Dismantling of timber scantling 40 Sqcm and over in section, in any position as in unframed or framed work complete all as specified and directed. |
| 6 | M&L for joist,channel,angle, MS tublar pipes or tee sections, fixed independently with or without connecting plates, cut to ordinary lengths i.e within 20mm of the lengh given complete all as specified and directed. |
| 7 | M & L for plates (plain or chequered), channels, squares cut or notched (ordinary and counter sunk) forming holes, without any attachment complete all as specified and directed. |
| 8 | S & F of mild steel screw bolts (machine made) with hexagonal or square head at one end and screwed the other or screwed both ends, each screwed ends to be fitted with washer and one hexagonal or square nut, exc 5cm and exc 10cm long and 10mm dia of shank complete all as specified and directed. |
| 9 | M & L for preparation of new or previously undecorated steel surfaces over 10cm width or girth and applying two coats of synthetic enamel paint over one coat of red oxide primer complete all as specified and directed. |
| 10 | M & L for brick work with sub class ' B' brick straight or curved on plan exc. 6 mtr mean radius built in cement mortor 1:4 including all arrangement including demolition brick work complete all as specified and directed. |
| 11 | M & L Rendering 12-15mm thick in ready mix on brick work or concrete surfaces to be finished even and fair (without using extra lime or cement) as in patch works or whole work including taking down cement plaster complete all as specified and directed. |
| 12 | M&L for Preparation of new surfaces (Plastered or un-plastered) of walls and applying three coats of white lime wash, complete all as specified and directed. |
| 13 | M&L for Preparation of new surfaces (Plastered or un-plastered) of walls and applying two coats of cement based paint white or tinted complete all as specified and directed. |
| 14 | S&F false ceiling with powder coated GI grid of size 600x600 mm using main Tee of size 24x28x0.40mm prepunched to accept cross tee of size 24x28x0.40mm and wall angles of size 25x25x0.40mm fixed with wall around of size with and including 4mm thick fiber cement board white colour designer tiles as approved by GE of size 595x595 mm placed in the grid and held in position duly suspended by 4mm dia GI wire hanger from the roof with holding down clips, butter fly clips and necessary provision for light fixture etc complete as per manufacturers instructions complete all as spd & directed including dismantling old false ceiling any type complete all as specified and directed. |
| 15 | Refixing/resecuring of false Ceiling board and snap grid frame work including providing 4mm dia GI wire as in hanger complete all as specified and directed . |
| 16 | S&F Solid PVC Wall Lining/penelling consisting of 5mm thick single side prelam PVC sheet used instead of plain colour sheet inclusive of solvent cement and fixing at site on PVC frame including 5mm thick PVC sheet fillet of width 35mm for wall paneling at distance of exceeding 30cm centre tor centre on verticl and at every end or joint of sheet in horizontal/vertical cinclusive of fixing on to wall to make PVC Frame as per specification and drawing including dismantling existing wall penelling/boarding any type complete all as specified and directed. |
| 17 | M&L Washed stone grit plaster on exterior walls in two layers, under layer 12mm cement plaster 1:4 (1 cement: 4 coarse sand ) furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 3 Kg of cement per square metre, top layer 15mm cement plaster 1:1/2:2 (1 cement: 1/2 coarse sand : 2 stone chipping 10mm nominal size) in panels with groove all around as per approved pattern including scrubbing and washing, the top layer with brushes and water to expose the stone chippings including providing necessary groove for required size of panel, in patch work repair including taking down cement plaster/grit plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. including providing necessary scafolding for work upto 4 storey bldg complete all as specified and directed. |
| 18 | S & F of 2 mm thick fibre glass reinforced translucent corrugated/plain sheeting with two corrugation side lap fixed with coach screws and washers including dismentling old fiber sheet complete all as specified and directed. |
| 19 | M&L for preparation of old treated surfaces of walls and applying one coat of oil bound distemper complete all as specified and directed by Engr-in-Charge (Note :- Height of building upto 04 storey) |
| 20 | M&L for preparation of old treated surfaces of walls and applying one coat of cement base paint using spray gun/roller brushes complete all as specified and directed by Engr-in-Charge (Note :- Height of building upto 04 storey) |
| 21 | Providing and applying 1mm thick wall care putty on wall /ceiling over plastered surface to prepare the surface even and smooth complete all as specified and directed. |
| 22 | M&L for complete removal of old treatment and preparation of old plastered surfaces of walls and applying two coats of oil bound distemper wherever required to bring uniform surafce complete all as specified and directed. |
| 23 | M&L for providing PMM (Polymer modified cementitious mortar ) :-(i) Dry sub strate surface and free of debris & dust and Apply rust remover chemical(ii) Applying Epoxy bond coat on the sound substrate using approved spray machine & ensuring that no pin holes are visible.(In case pin holes are still visible after a coat, a second coat shall be applied to ensure absence of pin holes) (iii) Immediately after application of epoxy bond coat as above apply PMM (Polymer modified cementitious mortar) of 25 mm thickness. Note: Application of PMM shall be preferably be in coats of appx 10mm thickness. PMM work shall be executed in fairely rapid successions so as entire work is completed with in 30 mins). PMM shall be pre packed ready to use.(iv) PMM surface to be moist cured for three days followed by air curing in temperature as recommended by manufactuer complete all as specified and directed. Please Enable Macros to View BoQ information |