| 1 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) A) PCC pole 8.5/9 Mtr. long | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) A) PCC pole 8.5/9 Mtr. long |
| 2 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) A) ST pole 11/13 Mtr. long | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) A) ST pole 11/13 Mtr. long |
| 3 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 16 KVA T/F | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 16 KVA T/F |
| 4 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 63 KVA T/F | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 63 KVA T/F |
| 5 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)100 KVA T/F | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)100 KVA T/F |
| 6 | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) I) LT XLPE CABLE AL 3.5X150 SQMM (60 mtr), LT PVC Cable (mtr), LT XLPE Cable 1*400SQMM (750 mtr) , LT XLPE Cable 1*150SQMM ( mtr) | Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) I) LT XLPE CABLE AL 3.5X150 SQMM (60 mtr), LT PVC Cable (mtr), LT XLPE Cable 1*400SQMM (750 mtr) , LT XLPE Cable 1*150SQMM ( mtr) |
| 7 | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. ABC 3X120 SQMM(14348 mtr) , ABC 1X16 SQMM(250 mtr)/ Weasal conductor (4725 mtr), stay set Complete (115 nos), 11 kv Fuse set (45 nos), TPMO ( ), cross arm, angle, Pin insulators (282 nos), Disk insulators with fitting (194 nos) and other line material, if required, earthing complete (169 nos), x Arm v type (32 nos), Distribution Box (231 nos), DB CLAMP ( nos) SMC Box ( nos) | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. ABC 3X120 SQMM(14348 mtr) , ABC 1X16 SQMM(250 mtr)/ Weasal conductor (4725 mtr), stay set Complete (115 nos), 11 kv Fuse set (45 nos), TPMO ( ), cross arm, angle, Pin insulators (282 nos), Disk insulators with fitting (194 nos) and other line material, if required, earthing complete (169 nos), x Arm v type (32 nos), Distribution Box (231 nos), DB CLAMP ( nos) SMC Box ( nos) |
| 8 | Erection and grouting of single Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of single Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 9 | Erection and grouting Double Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting Double Pole PCC 8.5 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 10 | Erection and grouting of single ST Pole 11/13 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of single ST Pole 11/13 Mtr. long in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 11 | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 12 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor |
| 13 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) ABC 3X120SQMM/1X16SQMM | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C) ABC 3X120SQMM/1X16SQMM |
| 14 | Laying of LT XLPE CABLE AL 3.5X150 SQMM overhead Cable with making loop complete work as per RESPO norms and direction by supervising Engineer. | Laying of LT XLPE CABLE AL 3.5X150 SQMM overhead Cable with making loop complete work as per RESPO norms and direction by supervising Engineer. |
| 15 | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. |
| 16 | Installation & Grouting of Stay set as direction by supervising Engineer. | Installation & Grouting of Stay set as direction by supervising Engineer. |
| 17 | Installation of 11kv fuse set as direction by supervising Engineer. | Installation of 11kv fuse set as direction by supervising Engineer. |
| 18 | PROVIDING & FIXING MS TOP CHANNEL 125X65X2240MM | PROVIDING & FIXING MS TOP CHANNEL 125X65X2240MM |
| 19 | PROVIDING & FIXING OF Stone pad | PROVIDING & FIXING OF Stone pad |
| 20 | PROVIDING & FIXING DROPPER CHANNEL 100X50X2028MM | PROVIDING & FIXING DROPPER CHANNEL 100X50X2028MM |
| 21 | PROVIDING & FIXING MS ANGLE 75X75X6X2228MM WITH CLAMP | PROVIDING & FIXING MS ANGLE 75X75X6X2228MM WITH CLAMP |
| 22 | PROVIDING & FIXING DP CLAMP | PROVIDING & FIXING DP CLAMP |
| 23 | PROVIDING & FIXING of LT Incoming Pannel for 100kva T/F | PROVIDING & FIXING of LT Incoming Pannel for 100kva T/F |
| 24 | PROVIDING & FIXING of F Bracket | PROVIDING & FIXING of F Bracket |
| 25 | PROVIDING & FIXING T OFF CHANNEL WITH CLAMP | PROVIDING & FIXING T OFF CHANNEL WITH CLAMP |
| 26 | PROVIDING & FIXING OF LT POLE CLAMP | PROVIDING & FIXING OF LT POLE CLAMP |
| 27 | PROVIDING & FIXING DANGER BOARD WITH NUT & BOLT | PROVIDING & FIXING DANGER BOARD WITH NUT & BOLT |
| 28 | PROVIDING & FIXING of X Arm Holding Clamp | PROVIDING & FIXING of X Arm Holding Clamp |
| 29 | PROVIDING & FIXING of DB Clamp | PROVIDING & FIXING of DB Clamp |
| 30 | PROVIDING & FIXING SUSPENSION CLAMP WITH I HOOK | PROVIDING & FIXING SUSPENSION CLAMP WITH I HOOK |
| 31 | PROVIDING & FIXING of EYE HOOK | PROVIDING & FIXING of EYE HOOK |
| 32 | PROVIDING & FIXING DEAD END CLAMP | PROVIDING & FIXING DEAD END CLAMP |
| 33 | PROVIDING & FIXING of CLAMP for TF | PROVIDING & FIXING of CLAMP for TF |
| 34 | PROVIDING & FIXING Nut & Bolt Off Size | PROVIDING & FIXING Nut & Bolt Off Size |