|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 3 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:4 ( 1-Cement : 4-Sand). |
| 4 | Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricksCement mortar 1 : 4 (1 cement : 4 coarse sand) |
| 5 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish :20mm thick . |
| 6 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 7 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Walls (any thickness) including attached pilasters, buttresses plinth and string course. |
| 8 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide |
| 9 | Providing and fixing concertina coil fencing with required dia 610 mm (having 15 nos. round per 6 metre length) up to 3m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. stud tied with GI staples and GI clips to retain horizontal including necessary bolts or GI barbed wire tied to angle iron all complete as per direction of Engineer In Charge with reinforced barbed tape (R.B.T.)/Spring core(2.5 mm thick) wire of high tensile strength of 165 kg/sq.mm with tape (0.52 mm thick) and weight 43.478 gm/metre (Cost of MS angle, CC block shall be paid extra) |
| 10 | Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding. New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ). |
| 11 | Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed : All kinds of soil |
| 12 | Supply & Stacking good earth at site complete including loading unloading & transporation etc. |
| 13 | Laying of lawns including ploughing leveling breaking of clods manuring and removal of stones etc. (cost of manure or extra good earth to be paid separately )maintenance of lawn foe 30 days or more till the grass forms a thick lawns free from weeds and fit for moving in the duration of planting if lawn die some where the contractor will replant it at his own cost.in rows 5 cm apart in either direction |
| 14 | Providing and installation of Merry go round :-Providing and fixing of Merry go round its required Area 3.00mtr X 3.00mtr .Total height 0.90 mtr from ground level.The pure polyster powder coating(over baked) done on the pipe extend the life of equipments and install by C.C. base system as per order by Engineer-in-charge age capacity 14 years and Seating capacity 6 childs |
| 15 | Providing and installation of Dome Climber :-Providing and fixing of Dome Climber its required Area 3.60mtr X 3.60mtr .Total height 1.80 mtr from ground level.The pure polyster powder coating (over baked) done on the pipe extend the life of equipments and Seating capacity 6 childs. |
| 16 | Providing and installation of Triple Wave Slides:-Providing and fixing of Triple Wave Slides with platform canopy its required Area 6.00mtr X 3.00mtr .Total height 2.50 mtr from ground level.The pure polyster powder coating(over baked) done on the pipe extend the life of equipments and child age up to 14 years. |
| 17 | Providing and installation of Sea Saw :-Providing and fixing of Sea Saw Double seater its required Area2.40 mtr X 1.20 mtr .Total height 0.90 mtr from ground level.The pure polyster powder coating(over baked) done on the pipe extend the life of equipments and install by C.C. base system as per order by Engineer-in-charge age capacity 14 years. |
| 18 | Providing and installation of :-Orbit ClimberArea 10feet x 7Feet x 7Feet Side Support 75MM OD Metal PipeTop Part 42MM OD Metal PipeCapacity: 04-08 Children Ladder Step 27MM OD Metal PipeHandel 27MM OD Metal Pipe |
| 19 | Providing and installation of :- Double SwingArea 10 x 6 x 8 FeetSide Frame 60MM OD PipeTop Frame 60MM OD PipeChain Powder Coated Chain 6MMCapacity: 02 Children Please Enable Macros to View BoQ information |