|
| 1 | Holding Clamp for ST Pole SP-55 with N/B. |
| 2 | LT Clamp For PCC Pole with N/B. |
| 3 | Earth wire Clamp For PCC Pole with N/B. |
| 4 | Stay Clamp for ST Pole SP-55 with N/B. |
| 5 | Supply of Suspension Clamp. |
| 6 | Stay Clamp for PCC Pole with N/B. |
| 7 | Supply of Dead end Clamp with I Hook. |
| 8 | Supply of Piercing Connector 120 Sq.mm-95 Sq.mm. |
| 9 | Supply of Distribution Box 3 Phase 4 Wire. |
| 10 | Supply of Aluminium Crimping Type Lusg 120 Sq.mm. |
| 11 | Supply of Aluminium Lug 0 Type 25 mm (4X25). |
| 12 | Supply of MS Half Clamp for LT Distribution Box. |
| 13 | Erection of Earthing Rod. |
| 14 | Fabrication and fixing of channel & cross arm work complete in all respect as per UPCL specification. |
| 15 | Excavation of Pit for Stay Set |
| 16 | Erection of 11 KV Stay Set |
| 17 | Grouting of Stay Set. |
| 18 | Excavation of Pit for Pole. |
| 19 | Erection of Single Pole PCC. |
| 20 | Erection of Single ST Pole SP-55. |
| 21 | Erection of Double ST Pole SP-55 |
| 22 | Grouting of Pole. |
| 23 | Muffing of Pole. |
| 24 | Mounting 100 KVA Transformer on sub station double pole structure. H.T. & L.T. connection using PVC cable/Lugs complete in all respect. |
| 25 | Laying, Sagging & Stringing 11 KV Line Rabbit Conductor. |
| 26 | PCC Pole. approximate distance of upto 21-50 Km |
| 27 | ST Pole SP- 55. approximate distance of upto 21-50 Km |
| 28 | Small Material approximate distance of upto 21-50 Km |
| 29 | 100 KVA T/F.approximate distance of upto 21-50 Km |
| 30 | Re Sagging o LT AB Cable. |
| 31 | Installation of LT Distribution Box. |
| 32 | Fixing of Ded End Clamp. |
| 33 | Fixing of Suspension Clamp With I Hook |
| 34 | Lopping and Chopping of Tree Branches. Please Enable Macros to View BoQ information |