| 1 | Supply of PG Clamp 95-25 Sq.mm. |
| 2 | Supply of PG Clamp 95-95 Sq.mm. |
| 3 | Supply of Stay Clamp For PCC Pole with Nut & bolt. |
| 4 | Supply of Suspension Clamp with I hook. |
| 5 | Supply of MS Clamp For LT Distribution Box. |
| 6 | Supply of MS Clamp for Dead end Clamp with Nut & bolt. |
| 7 | Supply of Stay Insulator. |
| 8 | Supply of Piercing Connector 25 Sq.mm-16 Sq.mm. |
| 9 | Supply of Piercing Connector 120 Sq.mm-95 Sq.mm. |
| 10 | Supply of Clamp For LT Distribution Box 3 Phase 4 Wire. |
| 11 | Supply of Aluminium Crimping Type Lusg 120 Sq.mm. |
| 12 | Supply of Aluminium Lug 0 Type 25 mm (4X25). |
| 13 | Supply of MS half Clamp For LT Distribution Box. |
| 14 | Erection of Earthing Rod. |
| 15 | Excavation of Pit for Stay Set |
| 16 | Erection of LT Stay Set |
| 17 | Grouting of Stay Set. |
| 18 | Excavation of Pit for Pole. |
| 19 | Erection of Single PCC Pole |
| 20 | Grouting of Pole. |
| 21 | Dismantling of LT Line 1 phase 2 Wire (Weasel) |
| 22 | Dismantling of LT Line 2 phase 3 Wire (Weasel) |
| 23 | Dismantling of LT Line 3 phase 4 Wire (Weasel) |
| 24 | Cartage of PCC Pole 21 to 50 km |
| 25 | Cartage of Petty Materail 21 to 50 Km |
| 26 | Disconnection & Re-connection of Consumers. |
| 27 | Laying of LT XLPE AB Cable 3X120+1X95 Sqmm. |
| 28 | Straightning of Tilled Existing LT Poles |
| 29 | Back Cartage of Petty Materail 51 to 70 Km |
| 30 | Installation of LT Distribution Box. |
| 31 | Fixing of Dead Eend clamps |
| 32 | Fixing of Suspension Clamps with I Hook. |
| 33 | Installation of 120 Sq.mm LT Aluminum Lugs. |
| 34 | Installation of 25 Sq.mm LT Aluminum Lugs. |
| 35 | Fixing of Piercing Connector 120-95 sq.mm. |
| 36 | Fixing of Piercing Connector 120-35 sq.mm. |
| 37 | Fixing of PG Clamp 120-120 Sq.mm. |
| 38 | Fixing of PG Clamp 95-25 Sq.mm. |
| 39 | Looping and Chopping of Tree Branches. Please Enable Macros to View BoQ information |