| 1 | ICCP system Monitoring: (TRU/CPPSM/Reference Cells, Anode and Cathode Junction Box,Checking of Permanent Reference Cells, PSP Monitoring of TLP locations of all the sections) at SGP | ICCP system Monitoring: (TRU/CPPSM/Reference Cells, Anode and Cathode Junction Box,Checking of Permanent Reference Cells, PSP Monitoring of TLP locations of all the sections) at SGP |
| 2 | ICCP system Monitoring: (TRU/CPPSM/Reference Cells, Anode and Cathode Junction Box,Checking of Permanent Reference Cells, PSP Monitoring of TLP locations of all the sections) at Urea plant. | ICCP system Monitoring: (TRU/CPPSM/Reference Cells, Anode and Cathode Junction Box,Checking of Permanent Reference Cells, PSP Monitoring of TLP locations of all the sections) at Urea plant. |
| 3 | ICCP system Monitoring: (TRU/CPPSM/Reference Cells, Anode and Cathode Junction Box,Checking of Permanent Reference Cells, PSP Monitoring of TLP locations of all the sections) at Ammonia - I plant. | ICCP system Monitoring: (TRU/CPPSM/Reference Cells, Anode and Cathode Junction Box,Checking of Permanent Reference Cells, PSP Monitoring of TLP locations of all the sections) at Ammonia - I plant. |
| 4 | ICCP system Monitoring: (TRU/CPPSM/Reference Cells, Anode and Cathode Junction Box,Checking of Permanent Reference Cells, PSP Monitoring of TLP locations of all the sections) at Ammonia - V plant. | ICCP system Monitoring: (TRU/CPPSM/Reference Cells, Anode and Cathode Junction Box,Checking of Permanent Reference Cells, PSP Monitoring of TLP locations of all the sections) at Ammonia - V plant. |
| 5 | PSP ON-Off Survey, IJ testing and Measurement. | PSP ON-Off Survey, IJ testing and Measurement. |
| 6 | Troubleshooting of installed ICCP system as per SOW 3.x.2 | Troubleshooting of installed ICCP system as per SOW 3.x.2 |
| 7 | Repairing of TR units as per SOW 3.x.3 | Repairing of TR units as per SOW 3.x.3 |
| 8 | Replacement of control cards as per SOW 3.x.4 | Replacement of control cards as per SOW 3.x.4 |
| 9 | Replacement of rectifier diodes as per SOW 3.x.5 | Replacement of rectifier diodes as per SOW 3.x.5 |
| 10 | Replacement of RC Circuit as per SOW 3.x.6 | Replacement of RC Circuit as per SOW 3.x.6 |
| 11 | Replacement of SCR/Thyristor as per SOW 3.x.7 | Replacement of SCR/Thyristor as per SOW 3.x.7 |
| 12 | Replacement of AC / DC Ammeter as per SOW 3.x.8 | Replacement of AC / DC Ammeter as per SOW 3.x.8 |
| 13 | Replacement of AC / DC Voltmeter as per SOW 3.x.9 | Replacement of AC / DC Voltmeter as per SOW 3.x.9 |
| 14 | Replacement of Switches as per SOW 3.x.10 | Replacement of Switches as per SOW 3.x.10 |
| 15 | Replacement of MCB’s / RCCB / RCBO as per SOW 3.x.11 | Replacement of MCB’s / RCCB / RCBO as per SOW 3.x.11 |
| 16 | Replacement of Lightning arrestor as per SOW 3.x.12 | Replacement of Lightning arrestor as per SOW 3.x.12 |
| 17 | Replacement of Capacitors as per SOW 3.x.13 | Replacement of Capacitors as per SOW 3.x.13 |
| 18 | Replacement of Control transformers as per SOW 3.x.14 | Replacement of Control transformers as per SOW 3.x.14 |
| 19 | Replacement of Door glass as per SOW 3.x.15 | Replacement of Door glass as per SOW 3.x.15 |
| 20 | Thermit welding for cable to pipe joint as per SOW 3.x.16 | Thermit welding for cable to pipe joint as per SOW 3.x.16 |
| 21 | Replacement of Junction Boxes as per SOW 3.x.17 | Replacement of Junction Boxes as per SOW 3.x.17 |
| 22 | Replacement of TLP / Monitoring junction boxes as per SOW 3.x.18 | Replacement of TLP / Monitoring junction boxes as per SOW 3.x.18 |
| 23 | Replacement of existing Anode pit covers as per SOW 3.x.19 | Replacement of existing Anode pit covers as per SOW 3.x.19 |
| 24 | Top up of existing vertical anode bed with petroleum coke as per SOW 3.x.20 | Top up of existing vertical anode bed with petroleum coke as per SOW 3.x.20 |